Ministry of Power
azadi ka amrit mahotsav

Facts vs Myth


India has Made Massive gains in nationwide Power Supply in Last 6 Years

Power Deficit for the country was -16.6 % in 2007-08

Steep improvement, especially in last five years has brought India to nearly nil deficit -.4 % in 2020-21

155377 MEGAWATT capacity augmented in last approximate 7 years

This has been made possible by massive policy and infrastructure interventions through schemes of this government: Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY), Integrated Power Development Scheme ( IPDS ), Pradhan Mantri Sahaj Bijli Har Ghar Yojana (Saubhagya)

Posted On: 08 NOV 2021 3:18PM by PIB Delhi

India had a massive power deficit of -16.6% in 2007-08. Even in 2011-12, it was -10.6 %. Through the multi pronged, comprehensive and aggressive interventions of the government, this deficit is near about wiped out, consistently over the last 3 years: -.4% In 2020-21, -.7% in 2019-20 and -.8% in 2018-19. The current year, up till October, it has been -1.2%; the marginal spike being attributable to the annual post  monsoon pressure on power output. This is also likely to normalize by the end of the year.

This transformation from an acutely power deficit country, to a situation of demand being met, except for an extremely marginal shortfall of less than 1%, has been made possible by the  following schemes brought in by the current Government to address the unhappy situation.

The Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY), was brought in on 25th July, 2015 for infrastructure push in the rural sector – setting up of transmission and sub transmission systems. The Integrated Power Development Scheme ( IPDS ),was brought in on 20th November, 2014 for to fill in power infrastructure gaps in urban areas. The Pradhan Mantri Sahaj Bijli Har Ghar Yojana (Saubhagya) scheme launched on 25th September, 2017, had the vision to take electricity to every household (willing), and has been able to supply electricity connections to 2.8 to crore households which were hither to in darkness.

The augmentation to the installed power capacity in the country, consequent to these efforts,  has been 155377 MEGAWATT  in last approximately 7 years.

Placed below, for reference, is the power supply position of the country since 2007-08.

******

MV/IG


(Release ID: 1770019) Visitor Counter : 2834