Ministry of Ports, Shipping and Waterways
Ganga River Waterways
Posted On:
09 AUG 2024 1:04PM by PIB Delhi
IWAI has undertaken implementation of the Jal Marg Vikas Project (JMVP) for capacity augmentation of National Waterway -1 (NW-1) on the Haldia – Varanasi stretch (1390 km) of the Ganga-Bhagirathi- Hooghly River System with the technical and financial assistance of the World Bank to provide fairway of 2.2 to 3.0 meters and a bottom channel of 45 meters for large barge movement, Multi-Modal Terminals, Intermodal Terminals, Navigational lock gates, community jetties and navigational aids.
The details of the plan outlay along with projects approved for development of National Waterways is at Annexure-I
Annexure -1
The details of Inland Water Transport (IWT) Projects on National Waterways (NWs) and planned outlay as on 30.06.2024 :–
S. No.
|
Projects Sanctioned on National Waterway (NW) with States
|
(Rs. in cr.)
|
Allocated
|
1.
|
Jal Marg Vikas Project (JMVP-I & II) from Varanasi-Haldia stretch (1390 km) on NW-1 (Ganga-Bhagirathi-Hooghly River System) in Uttar Pradesh, Bihar, Jharkhand & West Bengal
|
5369.18
|
2.
|
(a) Development of NW-2 (river Brahmaputra) in Assam
|
474
|
|
(b) Construction of Alternative road to Pandu Port on NW-2 to NH-27 in Assam
|
180
|
|
(c) Construction Ship repair facility at Pandu on NW-2 to NH-27 in Assam
|
208
|
3.
|
Development of NW-16 (river Barak) and Indian Portion of Indo-Bangladesh Route in Assam
|
148
|
4.
|
Development of 16 NWs (NW-3, 4, 5 & 13 new NWs) in the States of Kerala, Andhra Pradesh, Odisha, Goa, West Bengal, Uttar Pradesh, Bihar, Maharashtra & Assam-
|
267
|
|
Total
|
6646.18
|
This information was given by the Union Minister of Ports, Shipping and Waterways Shri Sarbananda Sonowal in a written reply in Lok Sabha today.
MJPS/AK
*****
(Release ID: 2043497)
Visitor Counter : 1150