Ministry of Petroleum & Natural Gas
Monthly Production Report for July,2020
Posted On:
25 AUG 2020 3:08PM by PIB Delhi
- Production of Crude Oil
Crude oil production during July,2020 was2633.59 TMT which is 4.94% lower than target and4.89% lower when compared with July2019.Cumulative crude oil production during April-July, 2020 was 10308.78 TMT which is 3.53% and 6.08% lower than target for the period and production during corresponding period of last year respectively.Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of July, 2020 and cumulatively for the period April-July, 2020 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company
|
Target
|
July (Month)
|
April-July (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
ONGC
|
20931.54
|
1796.69
|
1738.56
|
1731.29
|
100.42
|
6975.99
|
6806.96
|
6867.80
|
99.11
|
OIL
|
3268.00
|
266.59
|
250.61
|
273.82
|
91.52
|
1031.33
|
997.00
|
1080.45
|
92.28
|
PSC Fields
|
8265.00
|
707.10
|
644.42
|
763.86
|
84.36
|
2679.16
|
2504.81
|
3027.42
|
82.74
|
Total
|
32464.53
|
2770.38
|
2633.59
|
2768.97
|
95.11
|
10686.48
|
10308.78
|
10975.66
|
93.92
|
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
-
- Crude oil production by ONGC in nomination block during July, 2020 was 1738.56 TMT which is 3.24%lower than target but 0.42%higher when compared with July 2019. Cumulative crude oil production by ONGC during April-July, 2020 was 6806.96 TMT which is 2.42%and 0.89% lower than target for the period andproduction during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Production planned from WO16 cluster from June’20 could not be realized due to delay in MOPU (SagarSamrat) as activities at GPC yard Abu Dhabi got affected due to Covid restrictions/lockdown
- Production planned from new wells in Ratna field affected due to non- availability of ESPs due to implications of COVID-19.
- Production planned from new wells from Cluster-8 project has been affected due to toppling of D-30-2 platform jacket during installation and further delay in installation of new platforms due to COVID implications
-
- Crude oil production by OIL in the nomination during July, 2020 was250.61 TMT which is 5.99% lower than the monthly target and 8.48% lower than the July, 2019. Cumulative crude oil production by OIL during April-July, 2020 was 997.0 TMT which is 3.33% and 7.72% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover and drilling wells.
- Less than planned contribution from Old well due to rise in water cut in wells & decline in total liquid production of wells.
- Loss of oil production due to bandh/blockade by local people /union /association after the blow out at BGN#5 and nearby areas.
-
- Crude oil production by Pvt/JVs in the PSC regime during July,2020 was 644.42 TMT which islower by 8.86% than the monthly target and 15.64%lowerthanJuly, 2019.Cumulative crude oil production by Pvt/JVs during April-July, 2020 was 2504.81 TMT which is 6.51% and 17.26% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- RJ-ON-90/1 (Rajasthan Block): (1) Mangala - Near term impact of pre-production and optimization jobs including zone conversions. (2) Bhagyam – Higher PCP & electrical failures, delayed start-up full field polymer injection and additional downtime due to OHL/Grid failure (3) Aishwarya – Delayed startup of polymer injection in full field, lower UF VRR and additional downtime due to ESP failure in 3 producer wells. (4) ABH - Delay in hookup of ABH Stage-2 wells. (5) Saraswati - Sara1 is shut-in (SRP stopped) due to no liquid flow observed. (CEIL)
- CY-ONN-2002/2: Well MDDD was planned to put on production in June 2020, however, it could not be taken up due to local agitation. (ONGC)
- CB-ONN-2000/1: (1) Well PK#2 is not producing due to casing collapse and soil breakthrough in the well. (2) Well SE_DEV#1, SE#1A and SE1#A1 is shut-in due to unavailability of effective demulsifier to break tight water and oil emulsion. (3) Minor shortfall in production in SRP operated well (PK2#A1, PK2#A2 & PL#1) due to power failure by UGVCL (power distributer). (GSPC)
- KG-ONN-2003/1: Delay in completion of new infill wells on account of pending FDP submission and decline in production from 02 wells. (ONGC)
- Production of Natural Gas
Natural gas production during July,2020 was 2443.31MMSCM which is 12.41% lower than the monthly target and 10.10% lower when compared with July, 2019. Cumulative natural gas production during April-July, 2020 was 9228.46 MMSCM which is 11.47% and 14.14% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of July, 2020 and cumulatively for the period April-July, 2020 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (inMMSCM)
Oil Company
|
Target
|
July (Month)
|
April-July (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
ONGC
|
24437.08
|
2091.05
|
1925.55
|
2023.37
|
95.17
|
8147.66
|
7276.15
|
8151.05
|
89.27
|
OIL
|
3181.54
|
268.04
|
203.03
|
235.84
|
86.09
|
1002.65
|
852.55
|
915.73
|
93.10
|
PSC Fields
|
6826.82
|
430.24
|
314.73
|
458.71
|
68.61
|
1273.42
|
1099.76
|
1681.99
|
65.38
|
Total
|
34445.44
|
2789.34
|
2443.31
|
2717.92
|
89.90
|
10423.73
|
9228.46
|
10748.77
|
85.86
|
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure-2: Monthly Natural Gas Production
-
- Natural gas production by ONGC in the nomination during July, 2020 was 1925.55MMSCM which is 7.91% lower than target and 4.83% lower when compared with July 2019. Cumulative natural gas production by ONGC duringApril-July, 2020 was 7276.15 MMSCM which is 10.70% and 10.73% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- Production planned from WO16 cluster from June’20 could not be realized due to delay in MOPU (SagarSamrat) as activities at GPC yard Abu Dhabi got affected due to Covid restrictions/lockdown
- Less than planned production from Vasistha/S1 wells in EOA due to certain sub-surface issues
- Restricted/ no gas off take by consumers in onshore due to Covid-19 situation and shutdown at consumers’ end.
-
- Natural gas production by OILin the nomination during July, 2020 was 203.03 MMSCM which is 24.26% lower than monthly target and 13.91% lower than July, 2019. Cumulative natural gas production by OIL during April-July, 2020 was 852.55 MMSCM which is 14.97% and 6.90% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Low Up-liftment by NTPS due to various maintenance issues of gas turbines.
- Loss of natural gas production due to bandh/blockade by local people /union /association after the blow out at BGN#5 and nearby areas.
-
- Natural gas production by Pvt/JVs in the PSC regime during July,2020 was 314.73 MMSCM which is 26.85% lowerthan monthly target and31.39% lower than July, 2019. Cumulative natural gas production by Pvt/JVs during April-July, 2020 was 1099.76MMSCM which is 13.64% and 34.62% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- KG-DWN-98/3: Production not yet commenced from the field. (RIL)
- RJ-ON/6: Less offtake by buyer. (FEL)
- RJ-ON-90/1 (Rajasthan Block): RDG - Delay in new RDG plant start up due to Covid-19. (CEIL)
- Sohagpur West: Dewatering wells gas breakout awaited, scaling in producing wells and impact of COVID-19 lockdown. (RIL)
- KG-DWN-98/2 (U-3B): Well not producing as per the anticipated profile.(ONGC)
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during July, 2020 was 17680.15TMT which is 12.36% lower than the target for the month and18.81% lowerwhen compared with July, 2019. Cumulative crude throughput during April-July, 2020 was66309.54 TMT which is 18.27% and 21.40% lower than target for the period and crude throughput during corresponding period of last year respectively.Refinery-wise details of the crude throughput and capacity utilization during the month of July, 2020 vis-à-vis July, 2019 are given at Annexures-III and Annexures -IV. Company-wise crude throughput for the month of July, 2020 and cumulatively for the period April-July, 2020vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed(Crude Throughput) (in TMT)
Oil Company
|
Target
|
July (Month)
|
April-July (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
CPSE
|
148031.12
|
12194.83
|
10374.45
|
13424.02
|
77.28
|
46702.62
|
36177.39
|
47947.38
|
75.45
|
IOCL
|
72499.86
|
5803.01
|
5363.00
|
6415.95
|
83.59
|
22765.42
|
18292.91
|
23698.75
|
77.19
|
BPCL
|
30499.95
|
2670.63
|
1940.60
|
2761.21
|
70.28
|
10429.64
|
7011.05
|
10201.53
|
68.73
|
HPCL
|
17867.47
|
1556.59
|
1354.77
|
1626.65
|
83.29
|
6125.93
|
5325.06
|
5542.10
|
96.08
|
CPCL
|
9000.00
|
580.00
|
723.80
|
925.24
|
78.23
|
2060.00
|
2051.77
|
3547.17
|
57.84
|
NRL
|
2700.00
|
229.00
|
219.30
|
259.06
|
84.65
|
902.00
|
844.51
|
940.28
|
89.82
|
MRPL
|
15400.00
|
1350.00
|
765.71
|
1428.43
|
53.61
|
4400.00
|
2629.20
|
3988.55
|
65.92
|
ONGC
|
63.83
|
5.61
|
7.27
|
7.49
|
97.04
|
19.64
|
22.89
|
29.00
|
78.92
|
JVs
|
14772.00
|
1236.00
|
1446.92
|
1609.70
|
89.89
|
4866.00
|
4637.17
|
6850.47
|
67.69
|
BORL
|
7800.00
|
660.00
|
411.47
|
523.39
|
78.62
|
2600.00
|
1571.02
|
2576.36
|
60.98
|
HMEL
|
6972.00
|
576.00
|
1035.45
|
1086.30
|
95.32
|
2266.00
|
3066.15
|
4274.11
|
71.74
|
Private
|
89515.16
|
6743.31
|
5858.77
|
6743.31
|
86.88
|
29562.75
|
25494.99
|
29562.75
|
86.24
|
RIL
|
68894.99
|
4960.37
|
4298.86
|
4960.37
|
86.66
|
22586.33
|
19578.14
|
22586.33
|
86.68
|
EOL
|
20620.18
|
1782.94
|
1559.91
|
1782.94
|
87.49
|
6976.43
|
5916.84
|
6976.43
|
84.81
|
TOTAL
|
252318.28
|
20174.14
|
17680.15
|
21777.03
|
81.19
|
81131.38
|
66309.54
|
84360.60
|
78.60
|
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure 3: Crude Oil Processed (Crude Throughput)
-
- CPSE Refineries’ crude oil processed during July, 2020 was 10374.45TMT which is 14.93% lower than the target for the month and22.72%lowerwhen compared with July, 2019.Cumulative crude throughputby CPSE refineries during April-July, 2020 was 36177.39TMT which is 22.54% and 24.55% lower than target for the period and crude throughputduring corresponding period of last year respectively.Reasons for shortfall in production are as under:
- IOCL- Barauni, Haldia, Mathura and Panipat: Lower due to COVID-19 Pandemic i.e. low product demand.
- IOCL- Digboi: Lower due to DCU shutdown.
- BPCL-Kochi: Actual crude charge was maintained in order to meet the demand for the products.
- HPCL-Mumbai& Visakh: Lower due to planned shutdown of secondary units.
- CPCL-Manali: Lower due to lower product demand on account of Covid-19 lockdown.
- MRPL-Mangalore: Lower due to Lower demand due to impact of Covid-19 lockdown.
- NRL- Numaligarh: Lower, due to maintained in line with demand of MS/HSD
- BORL-Bina: Lower due to lower product demand in view of COVID 19 pandemic and ongoing monsoon.
3.2 JV refineries’ crude oil processed during July, 2020 was 1446.92TMT which is 17.06% higher than the target for the month but 10.11% lower when compared with July, 2019. Cumulative crude throughput during April-July, 2020 was 4637.17 TMT which is 4.70% higher than target for the period but32.31% lower and crude throughput during corresponding period of last year respectively.
3.3 Private refineries’ crude oil processed during July, 2020 was 5858.77TMT which is 13.12% lower than the corresponding month of last year. Cumulative crude throughputduring April-July, 2020 was 25494.99 TMT which is 13.76% lower than thecorresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during July, 2020 was 19386.95 TMT which is 7.10% lower than the target for the month and 13.85% lower when compared with July, 2019. Cumulative production during April-July, 2020 was 71350.80 TMT which is 13.98% and 17.08% lower than target for the period and production during corresponding period of last year respectively. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of July, 2020 and cumulatively for the period April-July, 2020 vis-à-Vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
Figure:4

Table 4: Monthly Refinery Production of Petorleum Products
Oil Company
|
Target
|
July (Month)
|
April-July (Cumulative)
|
2020-21 (Apr-Mar)
|
2020-21
|
2019-20
|
% over last year
|
2020-21
|
2019-20
|
% over last year
|
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
|
CPSE
|
139203.86
|
11445.01
|
9930.07
|
12703.62
|
78.17
|
44021.41
|
34185.71
|
45088.12
|
75.82
|
IOCL
|
68912.87
|
5461.18
|
5225.09
|
6114.01
|
85.46
|
21660.94
|
17418.29
|
22513.40
|
77.37
|
BPCL
|
28965.13
|
2578.87
|
1830.86
|
2593.35
|
70.60
|
9959.07
|
6729.28
|
9606.88
|
70.05
|
HPCL
|
16438.97
|
1432.50
|
1256.33
|
1553.55
|
80.87
|
5642.10
|
4999.94
|
5154.88
|
96.99
|
CPCL
|
8278.87
|
526.10
|
698.91
|
876.22
|
79.76
|
1852.01
|
1875.51
|
3266.09
|
57.42
|
NRL
|
2660.91
|
226.00
|
218.64
|
250.12
|
87.42
|
889.40
|
847.91
|
905.14
|
93.68
|
MRPL
|
13887.11
|
1215.09
|
693.26
|
1309.31
|
52.95
|
3999.43
|
2293.04
|
3614.79
|
63.43
|
ONGC
|
60.00
|
5.27
|
6.98
|
7.07
|
98.75
|
18.46
|
21.74
|
26.95
|
80.66
|
JVs
|
13590.40
|
1139.48
|
1301.96
|
1505.39
|
86.49
|
4476.80
|
4329.20
|
6395.00
|
67.70
|
BORL
|
6958.40
|
591.48
|
373.31
|
471.59
|
79.16
|
2320.80
|
1346.58
|
2338.10
|
57.59
|
HMEL
|
6632.00
|
548.00
|
928.65
|
1033.80
|
89.83
|
2156.00
|
2982.62
|
4056.91
|
73.52
|
Private
|
102154.50
|
7867.56
|
7769.70
|
7867.56
|
98.76
|
32933.10
|
31467.67
|
32933.10
|
95.55
|
RIL
|
82374.12
|
6099.95
|
6310.87
|
6099.95
|
103.46
|
26208.57
|
25695.52
|
26208.57
|
98.04
|
NEL
|
19780.38
|
1767.62
|
1458.84
|
1767.62
|
82.53
|
6724.53
|
5772.15
|
6724.53
|
85.84
|
Total Refinery
|
254948.76
|
20452.05
|
19001.73
|
22076.58
|
86.07
|
81431.31
|
69982.58
|
84416.22
|
82.90
|
Fractionators
|
4572.73
|
416.32
|
385.21
|
427.56
|
90.10
|
1512.87
|
1368.21
|
1632.89
|
83.79
|
TOTAL
|
259521.49
|
20868.37
|
19386.95
|
22504.13
|
86.15
|
82944.17
|
71350.80
|
86049.11
|
82.92
|
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
-
- Production of petroleum Products byOil’s Refineries during July, 2020 was 19001.73 TMT which is 7.09% lower than the target for the month and 13.93% lower when compared with July, 2019. Cumulative production of petroleum products by refineries during April-July, 2020 was 69982.58 TMT which is 14.06% and 17.10% lower than target for the period and production during corresponding period of last year respectively.
4.2 Production of petroleum Products byFractionators duringJuly, 2020 was 385.21 TMT which is 7.47% lower than the target for the month and 9.90% lower when compared with July, 2019. Cumulative production by Fractionators during April-July, 2020 was 1368.21 TMT which is 9.56% and 16.21% lower than target for the period and production during corresponding period of last year respectively.
Please click here to see the Annexures
********