Ministry of Railways
High-tech rail cum road inspection vehicle and state of art rail track health monitoring to ensure safe rail travel for Indians: Minister of Railways, Shri Ashwini Vaishnaw
Minister inspects the technology in New Delhi Railway station; Says use of technology proving out to be beneficial for many railway workers like track men who are currently doing it manually
This Technology is being given to all Railway Zones; Railway aims at implementing it across the nation within 5 Years
Current practice of reviewing rail track health every four months will be reduced to once in two months: Shri Ashwini Vaishnaw
Posted On:
05 DEC 2024 7:03PM by PIB Delhi
The Union Minister of Railways, Shri Ashwani Vaishnaw, inspected cutting-edge systems, Road Cum Rail Inspection Vehicle (RCRIV) and the Integrated Track Monitoring System (ITMS) at New Delhi railway station. He stated that rail track recorder vehicles will be deployed in every zone. He also emphasized the crucial role of technology for maintaining the health of railway tracks, easing trackmen’s workload and ensuring better operational outcomes.
These sophisticated systems highlight the Ministry’s dedication to leveraging technology for enabling proactive track maintenance, and enhancing overall railway operations.
Road Cum Rail Inspection Vehicle: Track Safety on Road and Rail
The Road Cum Rail Inspection Vehicle (RCRIV) is a versatile machine designed to inspect railway tracks with precision and efficiency, operating seamlessly on both road and rail. Built on the Tata Yodha model, it features advanced cameras and sturdy wheels, enabling continuous recording of track conditions for up to 15 days, ensuring enhanced safety and reliability.
Integrated Track Monitoring System (ITMS)
The ITMS, installed on Track Recording Cars (TRCs), uses advanced technology to monitor and measure track parameters at speeds ranging from 20 to 200 kmph. It features contactless monitoring with laser sensors, high-speed cameras, and LiDAR for precise data collection, along with real-time alerts via SMS and email for immediate attention to critical areas.
Integrated with the Track Management System (TMS), it enables real-time reporting, while video inspection and machine learning help identify structural defects. Offering comprehensive monitoring, including rail profile and wear measurement, track geometry assessment, and ride quality analysis, the ITMS ensures enhanced safety and operational efficiency. Its operation and maintenance are managed by the supplier firm under a seven-year agreement, ensuring consistent reliability.
Shri Vaishnaw highlighted the operational importance of ITMS, noting that it provides real-time alerts to trackmen via SMS and email, enabling quick responses to areas requiring urgent attention. This approach significantly improves track safety while reducing the workload for trackmen, making their tasks more efficient and manageable.
The Minister also emphasized the importance of a cyclical approach to track maintenance—measuring tracks, performing maintenance, and re-measuring—on a more frequent basis, ideally every two months. This cycle will be pivotal in significantly enhancing track safety and ensuring the long-term health of railway infrastructure.
*****
Dharmendra Tewari/Binoykumar
(Release ID: 2081257)
Visitor Counter : 1249