Ministry of Power
azadi ka amrit mahotsav

HYDRO POTENTIAL IN THE COUNTRY

Posted On: 01 AUG 2024 2:06PM by PIB Delhi

The Power Purchase Agreement (PPA) between Ratle Hydro Electric Power Corporation Limited (RHPCL) and Rajasthan Urja Vikas, IT Services Limited has been signed on 03.01.2024 for purchase of power from Ratle Hydroelectric Project for a period of 40 years at a tariff to be determined by the Central Electricity Regulatory Commission (CERC).

The Government of India has taken following initiatives to harness the hydro potential including the hydro pumped storage potential:

  1. Declaring large hydropower projects (capacity above 25 MW) as renewable energy source.
  2. Hydro Purchase Obligation (HPO) as a separate entity within Non-solar Renewable Purchase Obligation (RPO).
  3. Tariff rationalization measures for bringing down hydropower tariff.
  4. Budgetary support for Flood Moderation/Storage hydroelectric projects.
  5. Budgetary support towards cost of enabling infrastructure, i.e. roads/bridges.
  6. Guidelines to promote development of Pumped Storage Projects (PSPs) in the country was issued on 10th April, 2023.
  7. Waiver of Inter State Transmission System (ISTS) charges for hydroelectric projects and PSPs.
  8. Reduction of timeline by Central Electricity Authority (CEA) for concurrence of Detailed Project Report (DPR).

As per the reassessment study carried out by CEA during the period 2017-2023, the exploitable large hydro potential in the country is 1,33,410 MW. Further, the identified pumped storage potential is 1,76,280 MW.  The State/UT-wise details are attached at Annexure-I.

CEA has concurred 24 hydroelectric schemes including PSPs with an aggregate installed capacity of 15,569 MW during the last ten years. Further, 17 hydroelectric projects aggregating to 11,376 MW and 38 PSPs aggregating to 55,330 MW are under Survey & Investigation (S&I) for preparation of DPR. The State/UT-wise details are attached at Annexure-II.

 

ANNEXURE-I

State/UT-wise details of Hydro Potential including Pumped Storage Potential

(Installed capacity - above 25 MW)

As on 30.06.2024

CONVENTIONAL

PUMPED STORAGE

Region/ State/ UT

Exploitable Potential (MW)

Exploitable Potential*(MW)

NORTHERN

Jammu & Kashmir

12264

 

Ladakh

707

 

Himachal Pradesh

18305

7260

Punjab

1301

 

Haryana

 

 

Rajasthan

411

9200

Uttarakhand

13481

1000

Uttar Pradesh

502

13440

Sub Total (NR)

46971

30900

WESTERN

Madhya Pradesh

2819

8560

Chhattisgarh

1311

8925

Gujarat

550

6140

Maharashtra

3144

42955

Goa

 

 

Sub Total (WR)

7824

66580

SOUTHERN

Andhra Pradesh

2596

26420

Telangana

1302

8755

Karnataka

4414

7600

Kerala

2473

1200

Tamil Nadu

1785

16500

Sub Total (SR)

12570

60475

EASTERN

Jharkhand

300

1500

Bihar

130

 

Odisha

2825

4795

West Bengal

809

5500

Sikkim

6051

 

Sub Total (ER)

10115

11795

NORTH EASTERN

Meghalaya

2026

 

Tripura

 

 

Manipur

615

 

Assam

643

320

Nagaland

325

 

Arunachal Pradesh

50394

660

Mizoram

1927

5550

Sub Total (NER)

55930

6530

ALL INDIA

133410

176280

* Exploitable Potential is subject to change due to addition/deletion of project and change in Installed capacity of Projects.

 

ANNEXURE-II

State/UT-wise number of Hydro Schemes including Pumped Storage Projects (PSPs) concurred by CEA during last ten years along with number of Projects under Survey & Investigation (S&I) for preparation of DPR

Sl. No.

State/ UT

Number of Hydro Electric Schemes including PSPs concurred by CEA during last ten years

Number of Hydro Projects under S&I for preparation of DPR

Nos. of PSPs under S&I for preparation of DPR

1

Andhra Pradesh

2

-

16

2

Arunachal Pradesh

5

8

-

3

Assam

1

-

-

4

Himachal Pradesh

5

4

-

5

Jammu & Kashmir

6

1

-

6

Manipur

1

-

-

7

Meghalaya

2

1

-

8

West Bengal

1

1

-

9

Odisha

1

-

-

10

Uttarakhand

-

1

-

11

Kerala

-

1

-

12

Rajasthan

-

-

3

13

Uttar Pradesh

-

-

4

14

Madhya Pradesh

-

-

2

15

Maharashtra

-

-

10

16

Karnataka

-

-

3

 

Total

24

17

38

 

This information was given by the Minister of State for Power, Shri Shripad Naik, in a written reply in the Lok Sabha today.

***

 

MJPS/SK


(Release ID: 2040094)
Read this release in: Urdu , Urdu , Hindi , Hindi_MP , Tamil