- Production of Crude Oil
Crude oil production during July 2021 was 2548.78 TMT, which is 3.78% lower than target for the month and 3.22% lower when compared with production of July 2020. Cumulative crude oil production during April-July, 2021 was 9961.65 TMT, which is 2.64% and 3.37% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of July 2021 and cumulatively for the period April-July, 2021 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company
|
Target
|
July (Month)
|
April- July (Cumulative)
|
2021-22 (Apr-Mar)*
|
2021-22
|
2020-21
|
% over last year
|
2021-22
|
2020-21
|
% over last year
|
Target*
|
Prod.*
|
Prod.
|
Target*
|
Prod.*
|
Prod.
|
ONGC
|
20272.88
|
1730.84
|
1664.94
|
1738.56
|
95.77
|
6685.94
|
6477.08
|
6806.96
|
95.15
|
OIL
|
3182.60
|
259.98
|
253.30
|
250.61
|
101.08
|
1011.20
|
995.64
|
997.00
|
99.86
|
PSC Fields
|
7718.52
|
658.01
|
630.54
|
644.45
|
97.84
|
2534.24
|
2488.93
|
2504.94
|
99.36
|
Total
|
31173.99
|
2648.83
|
2548.78
|
2633.62
|
96.78
|
10231.38
|
9961.65
|
10308.91
|
96.63
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
-
- Crude oil production by ONGC (Oil and Natural Gas Corporation) in nomination block during July 2021 was 1664.94 TMT, which is 3.81% lower than target of the month and 4.23% lower when compared with production of July 2020. Cumulative crude oil production by ONGC during April-July, 2021 was 6477.08 TMT, which is 3.12% and 4.85% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than anticipated production from WO-16 cluster due to delay in mobilization of MOPU Sagar Samrat.
- Less than anticipated production from Cluster-8 fields due to delay in inputs as installation of wellhead platforms delayed due to Covid impact.
-
- Crude oil production by OIL (Oil India Ltd) in the nomination block during July 2021 was 253.30 TMT, which is 1.08% higher than the production of corresponding month of last year but 2.57% lower than target of the reporting month. Cumulative crude oil production by OIL during April-July, 2021 was 995.64 TMT, which is 1.54% and 0.14% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells, drilling wells and old wells.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Crude oil production by Pvt/JVs companies in the PSC/RSC regime during July 2021 was 630.54 TMT, which is 4.17% lower than target of the month and 2.16% lower when compared with production of July 2020. Cumulative crude oil production by Pvt/JVs companies during April-July, 2021 was 2488.93 TMT, which is 1.79% and 0.64% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- RAVVA (Cairn Energy India Ltd): Production shortfall is due to injectivity issues in wells RC-4ST and RC-11z, which has caused lower productivity from wells RD-3ST & RD-6ST.
- CB-ONN-2000/1 (GSPC): Few wells not producing due to possible casing damage, reservoir issues, possible damage in sub surface assembly. Also, Minor shortfall wells PK2#A1 & PK2#A2 due to power failure by UGVCL.
- CB-ONN-2004/2 (ONGC): Two development well in VD-3 discovery not drilled as per plan. The production rate of new development well Vadatal#22 is not as expected.
- MB/OSDSF/B80/2016 (Hindustan Oil Exploration Company Ltd.): Delay in commencement of production.
- Production of Natural Gas
Natural gas production during July 2021 was 2891.96 MMSCM, which is 18.36% higher when compared with production of July 2020 but 10.19% lower than the monthly target. Cumulative natural gas production during April-July, 2021 was 11060.07 MMSCM, which is 19.85% higher than production during corresponding period of last year but 5.37% lower when compared with target for the period. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of July 2021 and cumulatively for the period April-July, 2021 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (in MMSCM)
Oil Company
|
Target
|
July (Month)
|
April- July (Cumulative)
|
2021-22 (Apr-Mar)*
|
2021-22
|
2020-21
|
% over last year
|
2021-22
|
2020-21
|
% over last year
|
Target*
|
Prod.*
|
Prod.
|
Target*
|
Prod.*
|
Prod.
|
ONGC
|
23335.10
|
1989.90
|
1728.91
|
1925.55
|
89.79
|
7593.17
|
6780.84
|
7276.15
|
93.19
|
OIL
|
2949.65
|
251.06
|
248.41
|
203.03
|
122.35
|
984.20
|
923.61
|
852.55
|
108.33
|
PSC Fields
|
11834.60
|
979.29
|
914.64
|
314.73
|
290.61
|
3109.86
|
3355.63
|
1099.75
|
305.13
|
Total
|
38119.35
|
3220.25
|
2891.96
|
2443.31
|
118.36
|
11687.22
|
11060.07
|
9228.45
|
119.85
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
-
- Natural gas production by ONGC in the nomination blocks during July 2021 was 1728.91 MMSCM, which is 13.12% lower than target for the month and 10.21% lower when compared with production of July 2020. Cumulative natural gas production by ONGC during April-July, 2021 was 6780.84 MMSCM, which is 10.70% and 6.81% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than anticipated production from WO-16 cluster due to delay in mobilization of MOPU Sagar Samrat.
- Less than planned production from Vasistha /S1 wells in EOA due to certain reservoir related issues.
- Delay in commencement of gas production from U1 field of KG-98/2 Cluster-II due to covid impact as manufacturing of subsea items and well completion delayed.
- Less offtake by consumers at Tripura, Rajahmundry & Cauvery.
- Less than envisaged production from Dahej & Gandhar field in Ankleshwar.
-
- Natural gas production by OIL in the nomination block during July 2021 was 248.41 MMSCM, which is 22.35% higher than the production of July 2020 but 1.05% lower than the target for the month. Cumulative natural gas production by OIL during April-July, 2021 was 923.61 MMSCM, which is 8.33% higher than production during corresponding period of last year but 6.16% lower than target for the period. Reasons for shortfall in production are as under:
- Low upliftment/demand of gas by the major customers.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Natural gas production by Pvt/JVs companies in the PSC/RSC/CBM regime during July 2021 was 914.64 MMSCM, which is 190.61% higher than the production of July 2020 but 6.60% lower than the target for the month. Cumulative natural gas production by Pvt/JVs during April-July, 2021 was 3355.63 MMSCM, which is 7.90% and 205.13% higher than target for the period and production during corresponding period of last year respectively. Increase in gas production is through contributions from D-34 field of KG DWN 98/3, which commenced from 18.12.2020, wells from satellite cluster (commenced w.e.f 25.4.2021).
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during July 2021 was 19383.64 TMT, which is 9.64% higher than July 2020 but 4.06% lower than the target for the month. Cumulative crude throughput during April-July, 2021 was 76638.47 TMT, which is 15.58% higher when compared with the production of corresponding period of last year but 3.07% lower than target for the period. Refinery-wise details of the crude throughput and capacity utilization during the month of July 2021 vis-à-vis July 2020 are given at Annexure-III and Annexure-IV. Company-wise crude throughput for the month of July 2021 and cumulatively for the period April-July, 2021vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Figure 3: Crude Oil Processed (Crude Throughput)
Table 3: Crude Oil Processed (Crude Throughput) (in TMT)
Oil Company
|
Target
|
July (Month)
|
April- July (Cumulative)
|
2021-22 (Apr-Mar)*
|
2021-22
|
2020-21
|
% over last year
|
2021-22
|
2020-21
|
% over last year
|
Target*
|
Prod.*
|
Prod.
|
Target*
|
Prod.*
|
Prod.
|
CPSE
|
145812.84
|
12809.12
|
10959.40
|
10374.45
|
105.64
|
47620.64
|
42668.17
|
36177.39
|
117.94
|
IOCL
|
70299.81
|
6023.83
|
5667.64
|
5363.00
|
105.68
|
24134.19
|
22386.62
|
18292.91
|
122.38
|
BPCL
|
30499.94
|
2680.00
|
2339.13
|
1940.60
|
120.54
|
10585.00
|
9056.21
|
7011.05
|
129.17
|
HPCL
|
17199.69
|
1579.58
|
799.64
|
1354.77
|
59.02
|
4604.33
|
3307.65
|
5325.06
|
62.11
|
CPCL
|
10000.00
|
930.00
|
818.56
|
723.80
|
113.09
|
2860.00
|
2853.07
|
2051.77
|
139.05
|
NRL
|
2750.35
|
240.17
|
226.90
|
219.30
|
103.46
|
867.72
|
866.92
|
844.51
|
102.65
|
MRPL
|
15000.00
|
1350.00
|
1104.62
|
765.71
|
144.26
|
4550.00
|
4175.10
|
2629.20
|
158.80
|
ONGC
|
63.04
|
5.53
|
2.91
|
7.27
|
40.07
|
19.40
|
22.61
|
22.89
|
98.77
|
JVs
|
18021.00
|
1536.00
|
1720.88
|
1446.92
|
118.93
|
5954.00
|
6536.41
|
4637.17
|
140.96
|
BORL
|
7000.00
|
600.00
|
622.71
|
411.47
|
151.34
|
2270.00
|
2214.02
|
1571.02
|
140.93
|
HMEL
|
11021.00
|
936.00
|
1098.17
|
1035.45
|
106.06
|
3684.00
|
4322.39
|
3066.15
|
140.97
|
Private
|
78008.07
|
5858.77
|
6703.36
|
5858.78
|
114.42
|
25494.99
|
27433.88
|
25494.99
|
107.61
|
RIL
|
60940.96
|
4298.86
|
5026.62
|
4298.86
|
116.93
|
19578.14
|
20782.14
|
19578.15
|
106.15
|
NEL
|
17067.11
|
1559.91
|
1676.74
|
1559.92
|
107.49
|
5916.84
|
6651.75
|
5916.84
|
112.42
|
TOTAL
|
241841.91
|
20203.89
|
19383.64
|
17680.15
|
109.64
|
79069.62
|
76638.47
|
66309.55
|
115.58
|
|
|
|
|
|
|
|
|
|
|
|
Note: Totals may not tally due to rounding off. *: Provisional
3.1 CPSE Refineries’ crude oil processed during July 2021 was 10959.40 TMT, which 5.64% higher than the production of July 2020 but 14.44% lower than the target for the month. Cumulative crude throughput during April-July, 2021 was 42668.17 TMT which is 17.94% higher than corresponding period of last year but 10.40% lower than target for the period. Reasons for shortfall in production are as under:
- IOCL-Guwahati: Monthly Crude processed lower due to extended revamp shutdown
- IOCL-Barauni & Digboi: Monthly Crude processed lower due to deferment of M&I shutdown
- IOCL-Gujarat, Mathura: Monthly Crude processed lower due to lower product demand
- IOCL-Haldia: Monthly Crude processed lower due to CDU-I/II shutdown due to heavy rainfall and flooding insider refinery.
- IOCL-Paradip: Monthly Crude processed lower due to coke deposition in Vacuum Distillation column.
- BPCL-Kochi: Marginal shortfall in monthly crude processed lower due to the Crude mix available and CDU 2 unit shutdown hence entire processing through CDU 3.
- HPCL, Mumbai: Monthly Crude processed lower due to continued shutdown of one of the the crude processing unit. Most of the other units are also under planned shutdown for revamp jobs.
- HPCL, Viskah: Monthly Crude processed lower due to continued shutdown of one of the primary crude processing unit
- CPCL-Manali: Monthly Crude processed lower due to lower demand due to covid -19 lockdown.
- MRPL-Mangalore: Monthly Crude processed lower due to lower demand due to covid -19 lockdown.
3.2 JV refineries’ crude oil processed during July 2021 was 1720.88 TMT, which is 12.04% higher than the target for the month and 18.93% higher than July 2020. Cumulative crude throughput during April-July, 2021 was 6536.41 TMT, which is 9.78% and 40.96% higher than target for the period and production during corresponding period of last year respectively.
3.3 Private refineries’ crude oil processed during July 2021 was 6703.36 TMT, which is 14.42% higher than the corresponding month of last year. Cumulative crude throughput during April-July, 2021 was 27433.88 TMT, which is 7.61% higher than the corresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during July 2021 was 20686.03 TMT, which is 6.70% higher than production of July 2020 but 4.54% lower when compared with target for the month. Cumulative production during April-July, 2021 was 80677.66 TMT, which is 13.07% higher when compared with the production of corresponding period of last year but 3.38% lower than target for the period. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of July 2021 and cumulatively for the period April-July, 2021 vis-à-Vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
Table 4: Production of Petroleum Products (TMT)
Oil Company
|
Target
|
July (Month)
|
April- July (Cumulative)
|
2021-22 (Apr-Mar)*
|
2021-22
|
2020-21
|
% over last year
|
2021-22
|
2020-21
|
% over last year
|
Target*
|
Prod.*
|
Prod.
|
Target*
|
Prod.*
|
Prod.
|
CPSE
|
137873.44
|
12094.84
|
10347.47
|
9930.07
|
104.20
|
45074.60
|
40343.22
|
34185.77
|
118.01
|
IOCL
|
66984.33
|
5710.47
|
5331.81
|
5225.09
|
102.04
|
23035.55
|
21293.68
|
17418.29
|
122.25
|
BPCL
|
29279.04
|
2579.24
|
2307.61
|
1830.86
|
126.04
|
10131.44
|
8810.90
|
6729.28
|
130.93
|
HPCL
|
16019.55
|
1477.51
|
745.04
|
1256.33
|
59.30
|
4287.38
|
3158.47
|
4999.94
|
63.17
|
CPCL
|
9279.11
|
864.85
|
776.22
|
698.91
|
111.06
|
2642.95
|
2565.29
|
1875.51
|
136.78
|
NRL
|
2749.06
|
240.06
|
230.89
|
218.64
|
105.60
|
867.31
|
835.49
|
847.91
|
98.54
|
MRPL
|
13502.33
|
1217.45
|
953.06
|
693.26
|
137.47
|
4091.49
|
3657.84
|
2293.04
|
159.52
|
ONGC
|
60.02
|
5.27
|
2.84
|
6.98
|
40.68
|
18.47
|
21.55
|
21.80
|
98.87
|
JVs
|
16361.00
|
1409.00
|
1581.64
|
1301.96
|
121.48
|
5458.00
|
6042.98
|
4329.20
|
139.59
|
BORL
|
6095.00
|
523.00
|
544.55
|
373.32
|
145.87
|
1970.00
|
1944.18
|
1346.58
|
144.38
|
HMEL
|
10266.00
|
886.00
|
1037.09
|
928.65
|
111.68
|
3488.00
|
4098.80
|
2982.62
|
137.42
|
Private
|
93222.97
|
7769.70
|
8396.60
|
7769.70
|
108.07
|
31467.67
|
32909.56
|
31467.68
|
104.58
|
RIL
|
76683.16
|
6310.87
|
6769.28
|
6310.87
|
107.26
|
25695.52
|
26487.28
|
25695.53
|
103.08
|
NEL
|
16539.81
|
1458.84
|
1627.32
|
1458.84
|
111.55
|
5772.15
|
6422.28
|
5772.15
|
111.26
|
Total Refinery
|
247457.41
|
21273.55
|
20325.70
|
19001.74
|
106.97
|
82000.27
|
79295.76
|
69982.65
|
113.31
|
Fractionators
|
4516.39
|
397.13
|
360.33
|
385.21
|
93.54
|
1496.14
|
1381.90
|
1368.22
|
101.00
|
TOTAL
|
251973.80
|
21670.68
|
20686.03
|
19386.95
|
106.70
|
83496.41
|
80677.66
|
71350.86
|
113.07
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure 4: Monthly Refinery Production of Petroleum Products
-
- Production of petroleum Products by Oil’s Refineries during July 2021 was 20325.70 TMT, which is 6.97% higher than production of July 2020 but 4.46% lower when compared with target for the month. Cumulative production during April-July, 2021 was 79295.76 TMT, which is 13.31% higher when compared with the production of corresponding period of last year but 3.3% lower than target for the period.
-
- Production of petroleum Products by Fractionators during July 2021 was 360.33 TMT, which is 9.27% lower when compared with target for the month and 6.46% lower than the target for the month. Cumulative production during April-July, 2021 was 1381.90 TMT, which is 1.0% higher when compared with the production of corresponding period of last year but 7.64% lower than target for the period.
Click here for AnnexureI
Click here for AnnexureII
Click here for AnnexureIII
Click here for AnnexureIV
Click here for AnnexureV
*****
YB
(Release ID: 1748463)
Visitor Counter : 1573