Ministry of Ports, Shipping and Waterways
DEVELOPMENT OF INLAND WATERWAYS AND RELATED PROJECTS
प्रविष्टि तिथि:
24 JUL 2026 7:46PM by PIB Delhi
The Government of India has embarked upon a transformational drive to promote Inland Water Transport (IWT) as a key pillar of India's multimodal transport system under Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047. The primary objective encompasses creating world-class waterway infrastructure through fairway development, multimodal terminals, community jetties, river cruise terminals, regional centres of excellence, digital navigation tools, and green vessel technologies, coupled with seamless integration under the PM Gati Shakti National Master Plan.
The development and regulation of National Waterways (NWs) are spearheaded by the Inland Waterways Authority of India (IWAI), an autonomous organization under the Ministry of Ports, Shipping and Waterways. To improve the Ease of Doing Business and simplify approvals, IWAI has introduced an array of digital reforms:
PANI: Portal for Asset and Navigation Information to facilitate seamless navigation planning.
Jalyan & Navic Portal: A centralized database and digital portal developed on the lines of 'Vahan' and 'Sarathi' for nationwide online registration of vessels and crew, enabling accurate tracking and strategic planning.
CAR-D: Cargo Data Portal for real-time tracking and logistics data integration.
Jal Samriddhi Portal: Dedicated portal supporting commercial and operational activities across National Waterways.
Digital Charts and Hydrographic Surveys: Modern hydrographic charts provided digitally to Mariners for enhanced safety.
These infrastructure, digital, and policy reforms have resulted in the operationalization of 32 National Waterways across the country, laying the foundation for a technology-driven, sustainable, and globally competitive IWT ecosystem that reduces logistics costs, promotes green mobility, and accelerates inclusive economic growth.
LOGISTICS EFFICIENCY & ENVIRONMENTAL COMPARATIVE ANALYSIS
Inland Water Transport serves as an economic and environmentally friendly alternate mode of transport to Rail and Road, significantly reducing congestion on existing transport networks.
Economic Freight Cost Comparison (2014 Price Baseline)
Inland Water Transport (IWT): Rs. 1.06 per Ton-Kilometer (TKm)
Railways: Rs. 1.36 per Ton-Kilometer (TKm)
Highways (Road): Rs. 2.50 per Ton-Kilometer (TKm)
(Source: Ministry of Railways, TTSS, and IWAI)
Environmental Impact & Emission Analysis
Greenhouse Gas (GHG) Emissions: IWT emits 0.0006 Rs/TKm, on par with Railways (0.0006 Rs/TKm) and significantly lower than Roadways (0.0031 Rs/TKm).
Air Pollution Costs: IWT accounts for 0.03 Rs/TKm, compared to 0.0366 Rs/TKm for Railways and 0.202 Rs/TKm for Roadways.
Noise, Soil & Water Pollution: IWT has negligible impact on noise, soil, and water pollution, whereas Road transport incurs 0.0032 Rs/TKm (noise) and 0.005 Rs/TKm (soil/water).
(Source: 12th Five Year Plan, Planning Commission TTS Study, PIANC)
POLICY MEASURES & SECTORAL REFORMS
Jalvahak Scheme: A scheme providing 35% financial incentive to cargo owners and scheduled operators for cargo movement on NW-1, NW-2, and NW-16 via the Indo-Bangladesh Protocol (IBP) route by Inland & Coastal Shipping Limited (ICSL). Approved at a budget of Rs. 95.42 Crore for 3 years.
Tonnage Tax Extension: Announced in the Union Budget on 01.02.2025, extending the special taxation system under the Indian Vessels Act, 2021 to inland vessels operating on NWs, rivers, and canals. Tax is calculated based on vessel size (tonnage) rather than net profit, ensuring stable, predictable, and lower tax burden.
National Waterways Regulations 2025: Notified to provide a transparent regulatory framework that encourages private sector capital investment in building and operating inland waterways terminals and jetties.
Cargo Aggregation & MMLPs: To resolve multimodality challenges arising from lack of industrial concentration along river banks, Multi-Modal Logistics Parks (MMLP) at Varanasi and Integrated Cluster-cum-Logistics Park at Sahibganj are being developed through NHLML (MoRTH). Rail connectivity to 3 MMTs is assigned to M/s Indian Port and Rail Company Ltd.
PSU Cargo Shift Mandate: Over 140 Public Sector Undertakings (PSUs) across key ministries (Petroleum & Natural Gas, Co-operation, Fertilizer, Food & Public Distribution, Heavy Industries, Steel, and Coal) have been engaged to mandate cargo allocation and modal shift to waterways.
The Coastal Shipping Act, 2025: Enacted to modernize regulation at par with international standards, expand vessel chartering entities, reduce compliance burdens, and foster ease of doing business. Effective from 15.03.2026.
Coastal Cargo Promotion Scheme: Announced in Union Budget 2026–27 to increase the share of Inland Waterways and Coastal Shipping from 6% to 12% by 2047.
IBP Route Operationalization: Indo-Bangladesh Protocol route No. 5 & 6 between Maia and Sultanganj has been operationalized with successful trial movements.
REGIONAL WATERWAYS DEVELOPMENT & NATIONWIDE STATUS
Northeast Region (NER) Waterways (NW-2 & NW-16)
In addition to completed works (MMLP Jogighopa terminal, Bogibeel cargo-cum-tourist terminal, Dhubri & Bogibeel customs/immigration buildings, and NH-27 approach road), key ongoing projects include:
Fairway development via Dredging Corporation of India (DCI) on NW-2 (Rs. 143 Crore).
Ship Repair Facility at Pandu (revised cost Rs. 283 Crore).
Tourist Jetty at Bishwanath Ghat & Cargo-cum-Cruise Terminal at Neamati Ghat (Rs. 158 Crore).
Regional Centre of Excellence at Dibrugarh (Rs. 188 Crore).
Steel Gangway with Yoke System at Pandu (Rs. 2.88 Crore).
Regional Office, MSDC, Guest House & ITAT building at Fancy Bazar (Rs. 50.00 Crore).
Link Road connecting Pandu Terminal with Ship Repair Facility (Rs. 55 Crore).
2 Steel Pontoons (Rs. 3.40 Crore) and 2 SDB Vessels (Rs. 2.88 Crore) for NW-2.
Mathematical Modelling of Bogibeel Approach Channel (Rs. 0.60 Crore) and DPR for Community Jetties (Rs. 5.56 Crore).
Southern Region Waterways (Kerala, Andhra Pradesh & Telangana)
Kerala (NW-3, NW-8, NW-9): Continued fairway development on NW-3, NW-8 & NW-9. Reconstruction of navigation lock at Thrikunnapuzha and single-lane bridge at Kovilthottam entrusted to Kerala Govt on deposit basis. 24-hour navigational aids installed (15 in NW-8, 25 in NW-9) along with 4 HDPE jetties in NW-3.
Andhra Pradesh & Telangana (NW-4): Land acquisition completed at Muktyala and Harichandrapuram; under progress at Ibrahimpatnam. Ro-Ro terminals developed at Muktyala and Harischandrapuram. 4 floating pontoon jetties handed over to APTDC; 3 steel floating pontoon jetties under fabrication for Krishna River in Telangana.
Eastern, Western & Northern Region Waterways
Odisha (NW-5, NW-14, NW-64): Regular thalweg surveys, 10 navigational buoys installed in Mahanadi River (NW-64), Talcher-Dhamra-Paradip stretch (NW-5) developed for coal evacuation, and 3 concrete jetties in NW-14 & NW-64.
Karnataka (NW-51, NW-90): Development of Kabini River (NW-51) and Sharavati River (NW-90) for cruise tourism with 3 concrete jetties.
Goa (NW-27, NW-68, NW-111): Mandovi, Zuari, and Cumberjua rivers developed for cruise tourism; 10 concrete jetties (including 4 floating concrete jetties on NW-68) provided.
Gujarat (NW-73, NW-100): Development in Narmada River (NW-73) and Tapi River (NW-100) with 2 floating concrete jetties installed in Narmada and 2 in Tapi.
West Bengal (NW-44, NW-97): Swaroopnagar single lane bridge across Ichamati River (NW-44) completed in March 2026 and inaugurated by Hon'ble PM. Sundarban Waterways (NW-97) 201 km international route maintained under PIWTT.
UT of Jammu & Kashmir: Onshore facilities, floating concrete jetties, and nav aids initiated for Jhelum (NW-49), Chenab (NW-26), and Ravi (NW-84).
Himachal Pradesh & Punjab: Feasibility studies underway for Beas River (NW-17) and Sutlej River (NW-98).
List of Sagarmala- funded Projects in Andhra Pradesh
IWAI initiated fairway development in the Vijayawada–Muktyala stretch (82 km) of NW-4 in 2014. The IWT terminal at Muktyala (NTR District) is completed, while Harischandrapuram (Guntur District) is underway. Updation of DPR for NW-4 (Kakinada–Puducherry Canal integrated with Krishna & Godavari) is ongoing. The Commamuru Canal (113 km from Vijayawada to Pedaganjam Lock) passes through Bapatla District, connecting NW-4 with the North Buckingham Canal towards Chennai.
Under the Sagarmala Scheme, 9 projects worth Rs. 1,286 Crore have been sanctioned for Andhra Pradesh:
|
Sl. No
.
|
Name of Project
|
Implementing Agency
|
Status
|
District
|
Project Cost (Rs. in crore)
|
MoPS W
Share (Rs. in crore)
|
|
1
|
Construction of coastal Berth at Visakhapatnam port
|
Visakhapatnam Port Authority (VPA)
|
Completed
|
Visakhapatna m
|
43
|
30
|
|
2
|
Construction of grade separator from H-7 area to Port connectivity Road by passing Convent Junction - Visakhapatna m Port
|
National Highways Authority of India (NHAI)
|
Completed
|
Visakhapatna m
|
60
|
23.17
|
|
3
|
2 to 4 laning of port road connectivity to NH – 5 -Phase II
|
NHAI
|
Completed
|
Visakhapatna m
|
77.00
|
20.00
|
|
4
|
Centre of Excellence in Maritime and Shipbuilding - CEMS - AP-18
out of 24 Labs in Andhra Pradesh
|
Indian Register of Shipping (IRS)
|
Completed
|
Visakhapatna m
|
574.00
|
36.76
|
|
5
|
Coastal Districts Skill Development Program - Phase I - Andhra Pradesh
|
Ministry of Rural Development
(DDU-GKY)
|
Completed
|
Multiple districts
|
0.14
|
0.14
|
|
6
|
Development of Fishing Harbour in Juvvaladinne in SPSR Nellore District, Andhra Pradesh
|
Andhra Pradesh Maritime Infrastructure Development Corporation (APMIDCL)
|
Completed
|
Nellore
|
288
|
69.14
|
|
7
|
Improvement of Kakinada Anchorage Ports infrastructure in East Godavari district, Andhra Pradesh
|
Andhra Pradesh Maritime Board
|
Completed
|
Kakinada
|
85.83
|
36.67
|
|
8
|
Modernisation of Visakhapatna m Fishing Harbour
|
VPA
|
Under Implementatio n
|
Visakhapatna m
|
178.51
|
50.00
|
|
9
|
Coastal Districts Skill Development Program - Phase 2 - Andhra Pradesh
|
Ministry of Rural Development
(DDU-GKY)
|
Under Implementatio n
|
Multiple districts
|
5.98
|
5.98
|
Expected economic benefits include logistics cost reduction, improved evacuation of agriculture/aquaculture produce, supply chain efficiency, and regional employment generation.
HYDROGRAPHIC NAVIGATION & RIS INFRASTRUCTURE
Hydrographic Survey Expansion: Regular weekly, fortnightly, or monthly thalweg surveys are carried out across 22 National Waterways (NW-1, 2, 3, 4, 5, 8, 9, 14, 16, 23, 31, 40, 44, 47, 57, 64, 73, 86, 94, 97, 100, 110) and the Indo-Bangladesh Protocol route to assess navigational channels and fairway conditions.
River Information System (RIS): Implemented on NW-1 (Ganga) across Haldia–Farakka (Phase-I), Farakka–Patna (Phase-II), and Patna–Varanasi (Phase-III). Features 4 Control Stations, 13 Base Stations, AIS, VHF communication, meteorological sensors, and RIS consoles on 30 departmental vessels for real-time traffic monitoring.
Electronic Navigational Charts (ENCs): Prepared and uploaded on PANI and IWAI Vessel Tracker for 17 operational/tidal waterways (NW-1, 3, 5, 8, 9, 10, 14, 23, 27, 53, 64, 68, 73, 83, 86, 91, 110, 111). Prior to 2014, ENCs were available only for NW-1.
ANNEXURE-I: NATIONAL WATERWAYS FINANCIAL & PHYSICAL PROGRESS
Progress of Inland Water Transport Projects/ Schemes on National Waterways:
|
Sl.
|
Name of Project
|
Sanctioned Amount (Rs. in Crore)
|
Progress as on 30.06.26
(in % )
|
|
1
|
JMVP-1 on NW-1 (Ganga River)
|
5061.15
|
81.97
|
|
2
|
JMVP-II (Arth Ganga) on NW-1 (Ganga River)
|
|
3
|
8 Hybrid Electric Catamaran vessels
|
144
|
60.91
|
|
4
|
Comprehensive Development of NW-2 (Brahmaputra River)
|
639.92
|
99.96
|
|
5
|
Development of Approach Road from Pandu Port Terminal to NH-27 and Ship Repair Facility at Pandu, Guwahati on NW-2
|
419.00
|
96.84
(Approach Road completed)
|
|
6
|
Comprehensive Development of NW-16 (Barak River)
|
134.72
|
48.94
|
|
7
|
Development of 23 NW's (Phase-1) (3 existing & 20 new NW's) in various States
|
266.06
|
90.00
|
|
(i)
|
NW-3-West Coast Canal (Kottapuram - Kollam), Champakara and Udyogmandal Canals in Kerala
|
|
(ii)
|
Part of NW-4- Krishna River (Vijayawada – Muktyala) in Andhra Pradesh
|
|
(iii)
|
NW-5- Dhamra-Paradip via Mangalagadi to Pankopal of Brahmani River in Odisha
|
|
(iv)
|
NW-8 (Alappuzha-Changanassery Canal) in Kerala
|
|
(v)
|
NW-9 (Alappuzha-Athirampuza Canal) in Kerala
|
|
(vi)
|
NW-10 (Amba River) in Maharashtra
|
|
(vii)
|
NW-27 (Cumberjua River) in Goa
|
|
(viii)
|
NW-28 (Dabhol Creek Vashisthi River) in Maharashtra
|
|
(ix)
|
NW-31 (Dhansiri / Chathe River) in Assam
|
|
|
|
(x)
|
NW-37 (Gandak River) in U.P. and Bihar
|
|
(xi)
|
NW-40 (Ghaghra River) in U.P. & Bihar
|
|
(xii)
|
NW-44 (Ichamati River) in West Bengal
|
|
(xiii)
|
NW-53 (Kalyan-Thane-Mumbai Waterway, Vasai Creek and Ulhas River System) in Maharashtra
|
|
(xiv)
|
NW-57 (Kopili River -Banthai Gaon Tinali Bus Stop to Chandrapur No.2 confluence with Brahmaputra) in Assam,
|
|
(xv)
|
NW-64 (Mahanadi River) in Odisha
|
|
(xvi)
|
NW-68 (Mandovi River) in Goa
|
|
(xvii)
|
NW-73 (Narmada River) in Gujarat
|
|
(xviii)
|
NW-86- (Rupnarayan River) in West Bengal
|
|
(xix)
|
NW-91 (Shastri River - Jaigad Creek System) in Maharashtra
|
|
(xx)
|
NW-97 (Sundarbans Waterways) in West Bengal
|
|
(xxi)
|
NW-100 (Tapi River) in Gujarat
|
|
(xxii)
|
NW-110 (Yamuna River) in Delhi, Mathura and Vrindavan.
|
|
(xxiii)
|
NW-111 (Zuari River) in Goa
|
|
8
|
Other 11 National Waterways (NWs) namely; NW-26 (Chenab River), NW-49 (Jhelum River) & NW-84 (Ravi River) in Jammu & Kashmir; NW-46 (Indus River) in Laddhakh, NW-17 (Beas River) & NW-98 (Sutluj River) in Hiamachal Pradesh & Punjab; NW-
51 (Kabini River), NW-52 (Kali River), NW-90 (Sharavati River) & NW-105 (Udayavara River) in Karnataka and NW-14 (Baitrani River) in Odisha
|
242.74
|
23.19
|
|
Total
|
6907.59
|
|
Detailed Status of Jal Marg Vikas Project (JMVP) Components on NW-1
|
Sl.
No.
|
Project
|
Status
|
|
1
|
Development of Multi-Modal Terminal at Varanasi, Sahibganj & Haldia
|
Completed and Operational
|
|
2
|
Development of new Navigational Lock at Farakka
|
Completed and Operational
|
|
3
|
Development of Intermodal Terminal, Kalughat
|
Completed and Operational
|
|
4
|
Development of Intermodal Terminal Balagarh
|
Under Implementation
|
|
5
|
Modernization of existing Navigational Lock at Farakka
|
Under Implementation
|
|
6
|
Installation of 66 Community Jetties in Uttar Pradesh, Bihar, Jharkhand and West Bengal
|
Completed and Operational
|
|
7
|
Development of Ship Repair & Maintenance Facility at Patna and Varanasi
|
Under implementation
|
|
8
|
Proposed River Cruise Terminals at Patna and Varanasi
|
DPR/Planning stage
|
|
9
|
Proposed Water Metro at Varanasi, Patna and Kolkata on NW-1
|
DPR/Planning stage
|
|
10
|
Quick Pontoon Opening Mechanisms (QPOMs) in Uttar Pradesh and Bihar
|
2-commissioned and
additional 8 under development.
|
|
11
|
End to end Fairway development along NW-1 in stretches Tribeni-Katwa, Katwa – Farakka, Farakka–Kahalgaon, Sultanganj–Mahenderpur–Barh, Barh–Digha, Digha – Majhaua, Majhaua – Ghazipur, Ghazipur – Varanasi, and Kalughat Access Channel etc.
|
Ongoing
|
|
12
|
Development of Regional Centre of Excellence, Varanasi
|
DPR being prepared
|
|
13
|
Development of Ro-Pax facility at 4 locations , in the state of Bihar & West Bengal
|
Commissioned
|
|
14
|
Procurement of Pusher Tug (3 Nos) + Dumb Barge Flotilla (6 Nos)
|
Completed
|
|
15
|
Design construction and supply of 10 Cutter Suction Dredgers (CSDs)
|
1 delivered; 9 under development
|
|
16
|
4 Hybrid Survey Vessels
|
Under development
|
|
17
|
Development of MMLP-Freight Village, Varanasi
|
Under Tendering stage
|
ANNEXURE-II: CONSOLIDATED INFRASTRUCTURE & POLICY MEASURES
NW-1 (Ganga River): 66 community jetties, 20 floating terminals, 3 MMTs (Varanasi, Sahibganj, Haldia), 1 IMT (Kalughat), 4 Ro-Pax terminals, 5 pre-existing permanent terminals, new Farakka Navigation Lock, and 2 QPOMs.
NW-2 (Brahmaputra River): 13 floating terminals, MMTs at Pandu & Jogighopa, terminals at Bogibeel & Dhubri, dedicated cruise jetties at Jogighopa, Pandu, Biswanath Ghat, Neamati, and passenger/cruise jetties at Sadiya, Lyka, Orium Ghat.
NW-16 (Barak River) & IBP: Renovated/upgraded terminals at Badarpur & Karimganj; Sonamura terminal on Gumati River (Tripura) on the IBP route.
NW-3 (Kerala): 9 permanent IWT terminals with godowns and 2 Ro-Ro/Ro-Pax terminals.
NW-68 (Goa): 4 floating concrete jetties provided and installed.
Other National Waterways: 4 Tourist Jetties on NW-4 (AP), 8 Floating Jetties on NW-110 (Mathura-Vrindavan), 2 Jetties on NW-73 (Narmada, Gujarat), 2 Jetties on NW-100 (Tapi, Gujarat), and 2 Jetties on NW-37 (Bihar).
Fairway Maintenance: Dredging, river training, channel marking, and hydrographic surveys to maintain 35/45 m channel width and 2.0 / 2.2 / 2.5 / 3.0 m Least Available Depth (LAD).
This information was given by the Union Minister of Ports, Shipping and Waterways, Sarbananda Sonowal, in a written reply to the Lok Sabha.
***
MI/Indu
(रिलीज़ आईडी: 2289149)
आगंतुक पटल : 296
इस विज्ञप्ति को इन भाषाओं में पढ़ें:
Urdu