The Government of India has taken various initiatives to harness the hydro-power potential including the hydro pumped storage potential viz :-

  1. Declaring large hydropower projects (capacity above 25 MW) as renewable energy source.
  2. Hydro Renewable Energy Consumption Obligation by Designated Consumers.
  3. Tariff rationalization measures for bringing down hydropower tariff.
  4. Budgetary support for Flood Moderation/Storage hydroelectric projects.
  5. Budgetary support towards cost of enabling infrastructure, i.e. roads, bridges, ropeways, railway siding, communication infrastructure and Transmission Line from power house to the nearest pooling point, including upgradation of polling substations of State or Central Transmission Utility.
  6. Guidelines to promote development of Pumped Storage Projects (PSPs) in the country was issued on 10th April, 2023.
  7. Waiver of Inter State Transmission System (ISTS) charges for hydroelectric projects and PSPs.
  8. Central Financial Assistance (CFA) to the State Governments of North Eastern Region (NER) towards their equity participation for development of Hydro Electric Projects in the NER through Joint Venture collaboration between State entities and Central Public Sector Undertakings.
  9. Reduction of timeline by Central Electricity Authority (CEA) for concurrence of Detailed Project Reports (DPR) of hydroelectric projects and PSPs.

As per the study carried out by CEA during the period 2017-2023, the exploitable large hydro potential in the country is about 133.4 Giga Watt (GW).  Further, the identified pumped storage potential is about 181.4 GW.  The State / UT-wise details are at Annexure-I.

CEA has concurred 11 Hydroelectric (H.E.) schemes including PSPs with an aggregate installed capacity of 9,048 MW during the last five years. The State/UT-wise details are at Annexure-II. Further, 11 H.E. Schemes aggregating to 8,036 MW and 44 PSPs aggregating to 60,050 MW are under Survey & Investigation (S&I) for preparation of Detailed Project Report.  The State / UT-wise details are at Annexure-III.

This information was given by the Minister of State for Ministry of Power, Shri. Shripad Naik, in a written reply in the Rajya Sabha today.

 

*****

 

JN/SK

ANNEXURE-I

 

State / UT-wise details of Exploitable Potential of Hydro and Identified Potential of Pumped Storage (capacity above 25 MW)

(Figures in MW)

Region/State/UT

Exploitable Conventional Hydro

Potential

Identified Pumped Storage

Potential

Northern Region (NR)

Jammu & Kashmir

12264

-

Ladakh

707

-

Himachal Pradesh

18305

7260

Punjab

1301

-

Haryana

-

-

Rajasthan

411

9200

Uttarakhand

13481

1000

Uttar Pradesh

502

16620

Sub Total (NR)

46971

34080

Western Region (WR)

Madhya Pradesh

2819

8560

Chhattisgarh

1311

8525

Gujarat

550

7700

Maharashtra

3144

43405

Goa

-

-

Sub Total (WR)

7824

68190

Southern Region (SR)

Andhra Pradesh

2596

26420

Telangana

1302

8755

Karnataka

4414

7600

Kerala

2473

1200

Tamil Nadu

1785

16500

Sub Total (SR)

12570

60475

Eastern Region

Jharkhand

300

1500

Bihar

130

-

Odisha

2825

5075

West Bengal

809

5500

Sikkim

6051

-

Sub Total (ER)

10115

12075

North Eastern Region (NER)

Meghalaya

2026

-

Tripura          

-

-

Manipur

615

-

Assam

643

320

Nagaland

325

-

Arunachal Pradesh

50394

660

Mizoram

1927

5550

Sub Total (NER)

55930

6530

Total (ALL INDIA)

1,33,410

1,81,350

 

Note:  Exploitable/Identified Potential is subject to change due to addition/deletion and change in Installed capacity of some projects.

************

ANNEXURE-II

 

State/UT-wise number of Hydro Electric (H.E.) Schemes including Pumped Storage Projects (PSPs) concurred by CEA during last five years

 

Sl. No.

Name of the HE Scheme

Sector

Developer

Installed Capacity

(MW)

Date of concurrence

Andhra Pradesh

1

Pinnapuram (PSP)

Private

Greenko Energies Pvt. Ltd.

1200

20.04.2022

2

Upper Sileru (PSP)

State

APGENCO

1350

13.06.2023

Himachal Pradesh

3

Sunni Dam

Central

SJVNL

382

11.02.2021

4

Thana Plaun

State

HPPCL

191

07.09.2021

5

Dugar

Central

NHPC

500

26.04.2022

Jammu & Kashmir

6

Uri-I Stage-II

Central

NHPC

240

07.03.2023

Maharashtra

7

Bhivpuri (PSP)

Private

TATA Power

1000

30.09.2024

8

Bhavali (PSP)

Private

JSW Energy

1500

24.09.2024

Meghalaya

9

Wah-Umium Stage-III

Central

NEEPCO

85

26.07.2021

Odisha

10

Upper Indravati (PSP)

State

OHPC

600

30.08.2024

Karnataka

11

Sharavathy (PSP)

State

KPCL

2000

09.09.2024

Total

9048

 

 

 

************

 

 

 

ANNEXURE-III

 

State/UT-wise details of Hydro Electric Schemes for which Detailed Project Reports (DPRs) are under preparation

 

1.  Hydro Electric (H.E.) Schemes

 

Sl.     No.

Name of Scheme

  Installed Capacity (MW)

Jammu &Kashmir (J&K)

1

Dulhasti Stage-II

260

Sub Total  (J&K)

260

Arunachal Pradesh

2

Demwe Upper St-I

270

3

Niare

909

4

Naba

1082

5

Anjaw

270

6

Oju

2220

7

Subansiri Upper

1605

8

Kurung

320

Sub Total (Arunachal Pradesh)

6676

Meghalaya

9

MyntduLeshka Stage-II

210

Sub Total (Meghalaya)

210

West Bengal

10

Teesta Intermediate

90

Sub Total (West Bengal)

90

Kerala

 

11

Idukki Extension Scheme

800

Sub Total (Kerala)

800

Total

8,036

 

2.  Pumped Storage Projects (PSPs)

Sl.     No.

Name of Scheme

  Installed Capacity (MW)

Rajasthan

1

Sukhpura Off-Stream

2560

2

Shahpur

1800

3

Sirohi

1200

4

Brahmani

600

Sub Total  (Rajasthan)

6160

Uttar Pradesh

5

Kandhaura

1680

6

Musakhand

600

7

UP01

3660

8

Shoma

2400

9

Jhariya

1620

10

Chichlik

1560

11

Panaura

1500

Sub Total  (Uttar Pradesh)

13020

Odisha

12

Balimela PSP

500

Sub Total (Odisha)

500

Gujarat

 

13

Serula

960

14

Juni Kayaliwel

300

15

Amalpada

300

Sub Total (Gujarat)

1560

Madhya Pradesh

 

16

Indira Sagar

640

17

MP30 Gandhi Sagar

1920

Sub Total (Madhya Pradesh)

2560

Chhattisgarh

 

18

Hasdeo Bango

800

19

Bilaspur

1000

Sub Total (Chhattisgarh)

1800

 

Maharashtra

 

20

Pane

1500

21

Tarali

1500

22

Malshej Ghat Bhorande

1500

23

Shirwata

1800

24

Warasgaon Warangi

1500

25

Koyna Nivakane

2700

26

Nayagaon

2000

27

Karjat (Saidongar-1)

3000

28

Maval (Saidongar-2)

1200

Sub Total (Maharashtra)

16700

Andhra Pradesh

 

29

Gandikota

1000

30

Chitravathi

500

31

Somasila

900

32

Owk

800

33

Paidipalem East

1200

34

Singanamala

800

35

Paidipalem North

1000

36

Veeraballi Off-Stream

1800

37

Vempalli

1500

38

Raiwada

900

39

Kamalapadu

950

40

Rayavaram

1500

41

Gadikota

1200

42

Pedakota

1800

Sub Total (Andhra Pradesh)

15850

Karnataka

 

43

Saundatti

1600

44

Narihalla

300

Sub Total (Karnataka)

1900

Total

60050

******