Ministry of Jal Shakti

PRADHAN MANTRI KRISHI SINCHAYEE YOJANA (PMKSY)

Posted On: 07 FEB 2022 5:11PM by PIB Delhi

As per the data for 2018-19 has been provided by Directorate of Economics & Statistics, Ministry of Agriculture & Farmers Welfare, percentage of net un-irrigated area over net area sown in the country is estimated to be about 48.65%.

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) was launched during the year 2015-16, with an aim to enhance physical access of water on farm and expand cultivable area under assured irrigation, improve on-farm water use efficiency, introduce sustainable water conservation practices, etc.

PMKSY is an umbrella scheme, consisting of two major components implemented by this Ministry, namely, Accelerated Irrigation Benefit Programme (AIBP), and Har Khet Ko Pani (HKKP). HKKP, in turn, consists of four sub-components, being Command Area Development & Water Management (CAD&WM), Surface Minor Irrigation (SMI), Repair, Renovation and Restoration (RRR) of Water Bodies, and Ground Water (GW) Development component.

In addition, PMKSY also consists of two components being implemented by Ministries other than Jal Shakti Ministry. Per Drop More Crop (PDMC) component is being implemented by Department of Agriculture and Farmers Welfare, while Watershed Development component (WDC) is being implemented by Department of Land Resources.

Component-wise details of projects sanctioned, underway, and completed under PMKSY since 2018, State/UT-wise, are given below.

 

PMKSY-AIBP with pari passu implementation of  CADWM:

During 2016-17, ninety-nine (99) on-going Major/Medium Irrigation projects have been included for financial assistance under Pradhan Mantri Krishi Sinchayee Yojana - Accelerated Irrigation Benefits Programme (PMKSY-AIBP), along with pari-passu implementation of CADWM. Out of these, 31 projects were completed till 2017-18 and 15 projects have been completed since June, 2018. The details of these 15 projects, as well as the details of ongoing projects, are placed at Annexure.  No new projects were included since 2018 under PMKSY-AIBP.

 

PMKSY-HKKP-SMI

Under Surface Minor Irrigation (SMI) sub-component of PMKSY-HKKP, a total of 1,321 schemes have been included since 2018-19 [Arunachal Pradesh-604, Himachal Pradesh-4, Manipur-375, Meghalaya-68, Nagaland-270]. Out of these schemes, 77 schemes have been reported to be completed since 2018-19. The details of these 77 schemes, along with  the details of ongoing schemes, are placed at Annexure.

 

PMKSY-HKKP-RRR

Under Repair, Renovation and Restoration (RRR) sub-component of PMKSY-HKKP, a total of 395 water bodies have been taken up since 2018-19 [Andhra Pradesh-100, Bihar-93, Gujarat-61, Tami Nadu-141]. Out of these water bodies, RRR of 100 water bodies have been reported to be completed since 2018-19. The details of these 100 water bodies, along with the details of ongoing water bodies, are placed at Annexure.

 

PMKSY-HKKP-GW

Since 2019, 15 projects have been approved under Ground Water (GW) sub-component of PMKSY-HKKP in 12 States namely Assam, Arunachal Pradesh, Gujarat, Nagaland, Manipur, Mizoram, Tripura, Telangana, Tamil Nadu, Uttar Pradesh, Uttarakhand and West Bengal. Out of these approved projects, 13 are under various stages of implementation. The details are given at Annexure.

 

PMKSY-PDMC

Under PMKSY-Per Drop More Crop, an area of 32.697 lakh hectare (ha) has been covered under Micro Irrigation in the country through PMKSY-PDMC from 2018-19 to 2020-21. The details are given at Annexure.

 

PMKSY-WDC

Department of Land Resources has taken up 6,382 projects under PMKSY-WDC. Out of these projects, 5,243 have been reported to be completed. The details of these projects, along the details of ongoing projects, are placed at Annexure.

 

Water resources projects are planned, funded, executed, and maintained by the State Governments themselves as per their own resources and priorities. Role of Government of India is limited to providing technical support and, in some cases, partial financial assistance under the existing schemes implemented by the Government of India. 

 

The State Governments are themselves mandated to address the monitoring and redressal mechanisms to ensure maintenance and quality control of irrigation projects being implemented by them. Further, Central Water Commission as well as a dedicated Project Management Unit (PMU) under this Ministry has also been mandated to regularly monitor the projects receiving central assistance from this Ministry. Physical and financial progress of these projects is monitored through a dedicated dashboard, backed with a Management Information System being maintained by Ministry of Jal Shakti.

Apart from the above, implementation and progress of the projects is also monitored at the highest level in this Ministry. Secretary, Department of Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti takes project-wise periodic reviews of physical and financial progress of the projects and actions to be taken by the various State Governments are finalized for early resolution of issues. Review meetings are also held from time to time at the level of Hon’ble Minister, Jal Shakti.

This Information was given by the Minister of State for Jal Shakti, Shri Bishweswar Tudu in a written  reply in Rajya Sabha today. 

*****

Annexure

 

PMKSY-AIBP, with pari passu implementation of CADWM: Projects completed since June, 2018:

 

S.No.

State/UT

Name of Project

1

Assam

Champamati Irrigation Project

2

Jammu & Kashmir

Restoration & Mod. of Main Ravi Canal

3

Tral Lift Irrigation Project

4

Karnataka

Karanja Project

5

Madhya Pradesh

Bargi Diversion Project Phase – I (km. 16 to km 63)

6

Mahi Project

7

Mahan Project

8

Maharashtra

Upper Kundalika Project

9

Lower Dudhna Project

10

Khadak purna Project

11

Dhom Balaakwadi Project

12

Manipur

Dolaithabi Barrage Project

13

Odisha

Ret irrigation Project

14

Telengiri Project

15

Lower Indra Project (KBK)

 

 

 

PMKSY-AIBP with pari passu implementation of CADWM: On-going projects as on June, 2018:

 

S.No

State

Project

 
 
 

1

Andhra Pradesh

Gundlakamma

 

2

Tadipudi LIS

 

3

Thotapally

 

4

Musurumilli

 

5

Pushkara LIS

 

6

Yerracalva

 

7

Tarakaram Teerta sagaram

 

8

Assam

Dhansiri

 

9

Borolia

 

10

Bihar

Durgawati

 

11

Punpun

 

12

Chhattisgarh

Kelo

 

13

Goa

Tillari

 

14

Gujarat

Sardar Sarovar

 

15

Jharkhand

Subernarekha   Multipurpose

 

16

Karnataka

Upper Tunga Irrigation Project

 

17

NLBC System Project (New)

 

18

Kerala

Muvattupuzha

 

19

Karapuzha

 

20

Madhya Pradesh

Omkareshwar Project Canal Phase-II (RBC km. 9.70 to km 65.50)

 

21

Omkareshwar Project Canal Phase-III (RBC km. 65.50 to km 142)

 

22

Bargi Diversion Project Phase - II
(km. 63 to km 104)

 

23

Indira Sagar Project Canal Phase - III (km. 143 to km. 206)

 

24

Pench Project

 

25

Indira Sagar Project Canal Phase - IV (km. 206 to km. 243)

 

26

Bargi Diversion Project Phase - III
(km. 104 to km 154)

 

27

Bargi Diversion Project Phase - IV
(km. 154 to km 197)

 

28

Maharashtra

Tillari'

 

29

Waghur

 

30

Lower Wardha

 

31

Bembla

 

32

Tarali

 

33

Arjuna

 

34

Aruna

 

35

Krishna Koyana Lift

 

36

Gadnadi

 

37

Sangola Branch Canal

 

38

Morna (Gureghar)

 

39

Lower Pedhi

 

40

Wang project

 

41

Nardave (Mahamadwadi)

 

42

Kudali

 

43

Upper Pen Ganga

 

44

Gosikhurd (NP)

 

45

Manipur

Thoubal

 

46

Odisha

Subernarekha

 

47

Anandpur Barr. Ph.-I / Integrated Anandpur Barr.

 

48

Kanupur

 

49

Telangana

Palemvagu project

 

50

Peddavagu @ Neelwai project

 

51

SRSP St.II

 

52

Sri Komaram Bheem project

 

53

Rajiv Bheema L.I. Scheme

 

54

Peddavagu @ Jagannathpur

 

55

Indiramma Flood Flow Canal

 

56

J. Chokha Rao LIS

 

57

Uttar Pradesh

Arjun sahayak

 

58

Madhya Ganga canal PH-II

 

59

Saryu Nahar(NP)

 

60

UT - Ladakh

Prakachik Khows Canal

 

 

 

PMKSY-HKKP : SMI: Projects completed since June, 2018:

 

S.No.

State

Schemes completed since 2018-19

1

Arunachal Pradesh

14

2

Himachal Pradesh

1

3

Meghalaya

2

4

Nagaland

60

 

Total

77

 

 

 

PMKSY-HKKP : SMI: Projects Ongoing since June, 2018:

 

S.No.

State

 No of ongoing schemes

1.

Arunachal Pradesh

590

2.

Himachal Pradesh

3

3.

Manipur

375

4.

Meghalaya

66

5.

Nagaland

210

 

 

PMKSY-HKKP : RRR: Projects completed since June, 2018:

 

S.No.

State

Schemes completed since 2018-19

1

Bihar

6

2

Gujarat

3

3

Tamil Nadu

91

 

Total

100

 

PMKSY-HKKP : RRR: Projects Ongoing since June, 2018:

 

S.No.

State

No of ongoing WBs

1

Andhra Pradesh

100

2

Bihar

87

3.

Gujarat

58

4.

Tamil Nadu

50

 

Total

                      295

 

PMKSY-HKKP : GW: Projects under implementation since June, 2018:

 

S.

No

State/Projects

Wells to be constructed

Target/ Achievement

Nos

Project Command

Target/ Achievement

Ha

Beneficiaries

Target/ Achievement

Nos.

1

Assam-Ph-I

4779/

4693

19116/

18204

19643/

18160

2

Arunachal Pradesh-Ph-I

473/

473

1785/

1785

3350/

3350

3

Nagaland

262/

164

667/

363

264/

152

4

Tripura Ph-I

231/

204

339/

44

851/

70

5

Arunachal Pradesh Ph –II

519/

519

1957/

603

3633/

1120

6

Manipur

550/

490

2057/

1850

1445/

1110

7

Mizoram

209/

20

553/

39

411/

31

8

Assam Phase-II

4920/

4131

19680/

0

17216/

0

9

Tamil Nadu

 

166/

115

610/

374

1233/

866

10

Uttar Pradesh

 

14347/

12036

34659/

15280

14347/

12271

11

Uttrakhand

 

206/

180

1030/

35

1085/

54

12

Gujarat

 

2512/

56

3768/

152

3655/

170

13

Tripura Ph-II

890/

204

2670/

41

1639/

60

 

PMKSY-HKKP : PDMC: Projects under implementation since June, 2018:

 

S. No.

States/UT

2018-19 to 2020-21

1

Andhra Pradesh

322349

2

Bihar

6166

3

Chhattisgarh

65251

4

Goa

597

5

Gujarat

349756

6

Haryana

45567

7

Himachal Pradesh

5046

8

Jharkhand

11876

9

Jammu & Kashmir

1090

10

Karnataka

806622

11

Kerala

1937

12

Madhya Pradesh

67509

13

Maharashtra

380934

14

Odisha

32171

15

Punjab

2191

16

Rajasthan

181746

17

Tamil Nadu

650086

18

Telangana

56239

19

Uttarakhand

15174

20

Uttar Pradesh

170143

21

West Bengal

52628

22

Arunachal Pradesh

5585

23

Assam

17674

24

Manipur

8609

25

Meghalaya

0

26

Mizoram

2867

27

Nagaland

4350

28

Sikkim

5524

29

Tripura

0

 

Total

32,69,687

 

 

PMKSY-HKKP : WDC: Projects completed since June, 2018:

 

Sl.

No.

State

No of projects funded by DoLR (WDC-PMKSY)

Projects reported as
completed

1

Andhra Pradesh

373

260

2

Arunachal Pradesh

114

36

3

Assam

280

280

4

Bihar

64

64

5

Chhattisgarh

208

181

6

Gujarat

489

430

7

Haryana

75

47

8

Himachal Pradesh

131

77

9

UT of Jammu & Kashmir

119

37

10

UT of  Ladakh

11

0

11

Jharkhand

143

92

12

Karnataka

429

405

13

Kerala

69

41

14

Madhya Pradesh

446

446

15

Maharashtra

1024

810

16

Manipur

61

60

17

Meghalaya

61

61

18

Mizoram

49

49

19

Nagaland

111

111

20

Odisha

234

220

21

Punjab

33

33

22

Rajasthan

820

601

23

Sikkim

6

6

24

Tamil Nadu

270

270

25

Telangana

276

191

26

Tripura

56

48

27

Uttar Pradesh

249

249

28

Uttarakhand

62

61

29

West Bengal

119

77

30

 Goa

0

0

 

Total

6382

5243

 

PMKSY-HKKP : WDC: Projects ongoing since June, 2018:

 

Sl.No.

State

Ongoing projects

1

Andhra Pradesh

113

2

Arunachal Pradesh

78

3

Assam

0

4

Bihar

0

5

Chhattisgarh

27

6

Gujarat

59

7

Haryana

28

8

Himachal Pradesh

54

9

UT of Jammu & Kashmir

82

10

UT of  Ladakh

11

11

Jharkhand

51

12

Karnataka

24

13

Kerala

28

14

Madhya Pradesh

0

15

Maharashtra

214

16

Manipur

1

17

Meghalaya

0

18

Mizoram

0

19

Nagaland

0

20

Odisha

14

21

Punjab

0

22

Rajasthan

219

23

Sikkim

0

24

Tamil Nadu

0

25

Telangana

85

26

Tripura

8

27

Uttar Pradesh

0

28

Uttarakhand

1

29

West Bengal

42

30

 Goa

0

 

Total

1139

 

***** 

BY/AS