Ministry of Power
azadi ka amrit mahotsav

132 GW of electricity capacity under construction, 517 GW capacity anticipated to be added by 2031-2032: Union Power and New & Renewable Energy Minister

“Energy security of the country cannot be achieved by renewable sources of energy alone; dependence on coal-based generation is likely to continue till cost-effective energy storage solutions are available”

Posted On: 15 DEC 2023 1:20PM by PIB Delhi

The Union Minister for Power and New & Renewable Energy has informed that the country needs 24x7 availability of power for its economic growth. Energy security of the country cannot be achieved by renewable sources of energy alone because solar power is not available round the clock and wind energy is intermittent in nature. To meet our requirements, we need to add capacity which can provide round-the-clock power. Also, large-scale integration of variable and intermittent renewable energy resources with the grid requires power sources which can act as base load and balance the grid for grid stability. Hence, dependence on coal-based generation is likely to continue till cost-effective energy storage solutions are available.

The power demand of the country is increasing rapidly because we have added 2.86 crore new consumers and because our economy is growing rapidly.  The peak demand during the FY 2013-14 was 1,35,000 MW. The peak demand during the current financial year (till Nov. 2023) has increased to 2,43,000 MW.  The projected peak demand as per the 20th Electric Power Survey (EPS) will be 2,77,200 MW in FY 2026-27 and 3,66,400MW in FY 2031-32.

As per the National Electricity Plan, the installed capacity requirement for the year 2031-32 is likely to be 9,00,422 MW, comprising 2,84,467 MW of fossil-based capacity (Coal & Lignite-2,59,643 MW, Gas–24,824 MW) and 6,15,955 MW of non-fossil-based capacity (Nuclear-19,680 MW, Large Hydro - 62,178 MW, Solar - 364,566 MW, Wind - 121,895 MW, Small Hydro - 5450 MW, Biomass - 15,500 MW, Pumped Storage Projects - 26,686 MW) along with Battery Energy Storage System capacity of 47,244 MW / 236,220 MWh).

As per the generation planning studies carried out by Central Electricity Authority, the required coal based installed capacity will be at 2,83,000 MW by FY 2032 as against the present installed capacity of 214000 MW.

In order to achieve the projected requirement of 283000 MW of coal/lignite-based capacity by 2032, additional 80000 MW of coal &lignite-based capacity is planned. Against this requirement, 27180 MW is under construction; 31010 MW is under advanced stages of planning/ development; and 29720 MW capacity is further identified for development to meet the target of a minimum 80000MW of coal-based capacity addition by 2031-2032.

Central Electricity Authority (CEA) has prepared a report after studying various aspects of Renovation & Modernization and Life Extension of Coal based power plants in August 2023 and the same has been circulated by MoP to all power utilities wherein CEA has identified 148 units with total capacity of 38150 MW as potential candidates for R&M/LE works. The Phasing Plan for implementation of R&M/LE at 148 units was prepared in consultation with central, state & private power utilities.

Further, CEA vide letters dated 20.01.2023 and 07.07.2023 issued an advisory to all the Thermal Power Utilities not to retire or repurpose their coal-based power stations before 2030 and to ensure the availability of thermal units after carrying out R&M activities, if required, keeping in view the expected energy demand scenario and availability of capacity.

Total installed Thermal Capacity (Coal & Lignite, Gas and Diesel) is 2,39,072 MW which includes Odisha (9540 MW) and Maharashtra (27063 MW). A detailed list is given in Annexure.

In order to ensure an uninterrupted power supply for the nation’s growth, the anticipated capacity addition between 2023-32 is given below:

  • 27180 MW of Thermal Capacity is under construction and the total anticipated Thermal capacity addition by 2031-2032 is likely to be 87910MW
  • 18033.5 MW of Hydro Capacity (including stalled projects) is under construction and the total anticipated Hydro capacity addition by 2031-2032 is likely to be 42014 MW.
  • 8000 MW of Nuclear Capacity is under construction and the total anticipated Nuclear capacity addition by 2031-2032 is likely to be 12200 MW.
  • 78935 MW of Renewable Energy Capacity is under construction and the anticipated RE capacity addition by 2031-32 will be 375279 MW.

Thus, total 132148.5 MW of Capacity is under construction and the total anticipated capacity addition by 2031-2032 is likely to be 517403 MW.

 

Annexure: State-wise list of Thermal Power Plants (Coal & Lignite, Gas and Diesel) as on 31.10.2023                                                                                                                  

Sl. No.

State-wise list of Thermal Power Plants as on 31.10.2023

Fuel Used

Organisation

Name of Project

Capacity (MW)

1

Andaman & Nicobar

Diesel

A&N ADM

AND. NICOBAR DG

57.52

2

 

AND. NICOBAR Pvt. DG

35.19

 

Andaman & Nicobar Total

 

 

 

92.71

3

Andhra Pradesh

Coal

NTPC

SIMHADRI

2000.00

4

APGENCO

Dr. N.TATA RAO TPS

1760.00

5

RAYALASEEMA TPS

1650.00

6

APPDCL

DAMODARAM SANJEEVAIAH TPS

2400.00

7

HNPC

VIZAG TPP

1040.00

8

MEL

THAMMINAPATNAM TPS

300.00

9

SEIL

PAINAMPURAM TPP

1320.00

10

SGPL TPP

1320.00

11

SEPL

SIMHAPURI TPS

600.00

12

Gas

APEPDCL

JEGURUPADU CCPP PH I

235.40

13

APGPCL

VIJJESWARAM CCPP

272.00

14

BSES AP

PEDDAPURAM CCPP

220.00

15

GAUTAMI

GAUTAMI CCPP

464.00

16

GMR ENERG

GMR Energy Ltd - Kakinada

220.00

17

GREL

GREL CCPP (Rajahmundry)

768.00

18

GVKP&IL

JEGURUPADU CCPP PH II

220.00

19

KONA

KONASEEMA CCPP

445.00

20

KONDAPALI

KONDAPALLI CCPP

368.14

21

 

KONDAPALLI EXTN CCPP

366.00

22

 

KONDAPALLI ST-3 CCPP

742.00

23

SPGL

GODAVARI CCPP

208.00

24

VEMAGIRI

VEMAGIRI CCPP

370.00

25

Diesel

LVS POWER

LVS POWER DG

36.80

 

Andhra Pradesh Total

 

 

 

17325.34

26

Assam

Coal

NTPC

BONGAIGAON TPP

750.00

27

Gas

APGCL

LAKWA GT

97.20

28

LAKWA REPLACEMENT POWER PROJECT

69.76

29

NAMRUP CCPP

139.40

30

NEEPCO.

KATHALGURI CCPP

291.00

 

Assam Total

 

 

 

1347.36

 

31

Bihar

Coal

NTPC

BARAUNI TPS

710.00

32

BARH I

1320.00

33

BARH II

1320.00

34

KAHALGAON TPS

2340.00

35

BRBCL

NABINAGAR TPP

1000.00

36

K.B.U.N.L

MUZAFFARPUR TPS

390.00

37

NPGCL

NABINAGAR STPP

1980.00

 

Bihar Total

 

 

 

9060.00

38

Chhattisgarh

Coal

NTPC

KORBA STPS

2600.00

39

LARA TPP

1600.00

40

SIPAT STPS

2980.00

41

NSPCL

BHILAI TPS

500.00

42

ACB

CHAKABURA TPP

30.00

43

 

KASAIPALLI TPP

270.00

44

 

SWASTIK KORBA TPP

25.00

45

APL

ADANI POWER LIMITED RAIGARH TPP

600.00

46

 

ADANI POWER LIMITED RAIPUR TPP

1370.00

47

BALCO

BALCO TPS

600.00

48

CSPGCL

DSPM TPS

500.00

49

 

KORBA-WEST TPS

1340.00

50

 

MARWA TPS

1000.00

51

DBPCL

BARADARHA TPS

1200.00

52

JPL

OP JINDAL TPS

1000.00

53

 

TAMNAR TPP

2400.00

54

LANCO

PATHADI TPP

600.00

55

MCCPL

BANDAKHAR TPP

300.00

56

RKMPPL

UCHPINDA TPP

1440.00

57

SCPL

RATIJA TPS

100.00

58

SKS

BINJKOTE TPP

600.00

59

SVPPL

SVPL TPP

63.00

60

TRNE

NAWAPARA TPP

600.00

61

VESPL

KATGHORA TPP

35.00

62

VVL

SALORA TPP

135.00

63

WPCL

AKALTARA TPS

1800.00

 

Chhattisgarh Total

 

 

 

23688.00

64

Delhi

Gas

IPGCL

I.P.CCPP

270.00

65

PPCL

PRAGATI CCGT-III

1500.00

66

PRAGATI CCPP

330.40

67

TPDDL

RITHALA CCPP

108.00

 

Delhi Total

 

 

 

2208.40

68

Goa

Gas

RELIANCE

GOA CCPP (Liq.)

48.00

 

Goa Total

 

 

 

48.00

 

69

Gujarat

Coal

GSECL

GANDHI NAGAR TPS

630.00

70

SIKKA REP. TPS

500.00

71

UKAI TPS

1110.00

72

WANAKBORI TPS

2270.00

73

APL

ADANI POWER LIMITED MUNDRA TPP - I & II

2640.00

74

ADANI POWER LIMITED MUNDRA TPP - III

1980.00

75

CGPL

MUNDRA UMTPP

4000.00

76

EPGL

SALAYA TPP

1200.00

77

TOR. POW. (UNOSUGEN)

SABARMATI (D-F STATIONS)

362.00

78

Lignite

GSECL

BHAVNAGAR CFBC TPP

500.00

79

KUTCH LIG. TPS

150.00

80

GIPCL

SURAT LIG. TPS

500.00

81

GMDCL

AKRIMOTA LIG TPS

250.00

82

Gas

NTPC

GANDHAR CCPP

657.39

83

KAWAS CCPP

656.20

84

GSECL

DHUVARAN CCPP

594.72

85

UTRAN CCPP

374.00

86

HAZIRA CCPP

156.10

87

HAZIRA CCPP EXT

351.00

88

CLPINDIA

PEGUTHAN CCPP

655.00

89

ESSAR

ESSAR CCPP

515.00

90

GIPCL

BARODA CCPP

160.00

91

GPPCL

PIPAVAV CCPP

702.00

92

TOR. POW. (SUGEN)

SUGEN CCPP

1147.50

93

TOR. POW. (UNOSUGEN)

DGEN MEGA CCPP

1200.00

94

UNOSUGEN CCPP

382.50

 

Gujarat Total

 

 

 

23643.41

95

Haryana

Coal

APCPL

INDIRA GANDHI STPP

1500.00

96

HPGCL

PANIPAT TPS

710.00

97

RAJIV GANDHI TPS

1200.00

98

YAMUNA NAGAR TPS

600.00

99

JhPL(HR)

MAHATMA GANDHI TPS

1320.00

100

Gas

NTPC

FARIDABAD CCPP

431.59

 

Haryana Total

 

 

 

5761.59

101

Jammu & Kashmir

Gas

JKSPDC

PAMPORE GPS (Liq.)

175.00

 

Jammu & Kashmir Total

 

 

 

175.00

102

Jharkhand

Coal

ADHUNIK

MAHADEV PRASAD STPP

540.00

103

DVC

BOKARO TPS `A` EXP

500.00

104

 

CHANDRAPURA(DVC) TPS

500.00

105

 

KODARMA TPP

1000.00

106

MPL

MAITHON RB TPP

1050.00

107

NTPC

NORTH KARANPURA STPP

660.00

108

TATA PCL

JOJOBERA TPS

240.00

109

TVNL

TENUGHAT TPS

420.00

 

Jharkhand Total

 

 

 

4910.00

 

110

Karnataka

Coal

NTPC

KUDGI STPP

2400.00

111

KPCL

BELLARY TPS

1700.00

112

 

RAICHUR TPS

1720.00

113

APL

ADANI POWER LIMITED UDUPI TPP

1200.00

114

JSWEL

TORANGALLU TPS(SBU-I)

260.00

115

 

TORANGALLU TPS(SBU-II)

600.00

116

RPCL

YERMARUS TPP

1600.00

117

Diesel

BELLARY

BELLARY DG

25.20

 

Karnataka Total

 

 

 

9505.20

118

Kerala

Gas

NTPC

R. GANDHI CCPP (Liq.)

359.58

119

BSES(C)

COCHIN CCPP (Liq.)

174.00

120

Diesel

KSEB

BRAMHAPURAM DG

63.96

121

KOZHIKODE DG

96.00

 

Kerala Total

 

 

 

693.54

122

Lakshadweep

Diesel

ED, UT of Lakshadweep

Lakshadweep DG

26.83

 

Lakshadweep Total

 

 

 

26.83

123

Madhya Pradesh

Coal

NTPC

GADARWARA TPP

1600.00

124

KHARGONE STPP

1320.00

125

VINDHYACHAL STPS

4760.00

126

MPPGCL

AMARKANTAK EXT TPS

210.00

127

SANJAY GANDHI TPS

1340.00

128

SATPURA TPS

1330.00

129

SHREE SINGAJI TPP

2520.00

130

BLAPPL

NIWARI TPP

90.00

131

ESSARPMPL

MAHAN TPP

1200.00

132

JHAPL

SEIONI TPP

600.00

133

JPPVL

BINA TPS

500.00

134

NIGRI TPP

1320.00

135

MBPMPL

ANUPPUR TPP

1250.00

136

SPL

SASAN UMTPP

3960.00

 

Madhya Pradesh Total

 

 

 

22000.00

137

Maharashtra

Coal

NTPC

MAUDA TPS

2320.00

138

SOLAPUR STPS

1320.00

139

MAHAGENCO

BHUSAWAL TPS

1210.00

140

CHANDRAPUR(MAHARASHTRA) STPS

2920.00

141

KHAPARKHEDA TPS

1340.00

142

KORADI TPS

2190.00

143

NASIK TPS

630.00

144

PARAS TPS

500.00

145

PARLI TPS

750.00

146

AEML

DAHANU TPS

500.00

147

APL

ADANI POWER LIMITED TIRODA TPP

3300.00

148

DIL

DHARIWAL TPP

600.00

149

GEPL

GEPL TPP Ph-I

120.00

150

GMR ENERG

GMR WARORA TPS

600.00

151

IEPL

BELA TPS

270.00

152

JSWEL

JSW RATNAGIRI TPP

300.00

153

RATTANINDIA

AMRAVATI TPS

1350.00

154

RPGPL

MIHAN TPS

246.00

155

SPPL

SHIRPUR TPP

150.00

156

STPL

NASIK (P) TPS

1350.00

157

TATA PCL

TROMBAY TPS

750.00

158

VIP

BUTIBORI TPP

600.00

159

WPCL

WARDHA WARORA TPP

540.00

160

Gas

MAHAGENCO

URAN CCPP

672.00

161

PGPL

MANGAON CCPP

388.00

162

RGPPL

RATNAGIRI CCPP

1967.08

163

TATA PCL

TROMBAY CCPP

180.00

 

Maharashtra Total

 

 

 

27063.08

164

Manipur

Diesel

ED, Manipur

LEIMAKHONG DG

36.00

 

Manipur Total

 

 

 

36.00

165

Odisha

Coal

NTPC

DARLIPALI STPS

1600.00

166

TALCHER STPS

3000.00

167

OPGC

IB VALLEY TPS

1740.00

168

GMR ENERG

KAMALANGA TPS

1050.00

169

IBPIL

UTKAL TPP (IND BARATH)

350.00

170

JITPL

DERANG TPP

1200.00

171

VEDANTA

VEDANTA TPP

600.00

 

Odisha Total

 

 

 

9540.00

172

Puducherry

Gas

P&ED, Pudu.

KARAIKAL CCPP

32.50

 

Puducherry Total

 

 

 

32.50

173

Punjab

Coal

GPGSL (GVK)

GOINDWAL SAHIB TPP

540.00

174

NPL

RAJPURA TPP

1400.00

175

PSPCL

GH TPS (LEH.MOH.)

920.00

176

 

ROPAR TPS

840.00

177

TSPL

TALWANDI SABO TPP

1980.00

 

Punjab Total

 

 

 

5680.00

178

Rajasthan

Coal

RRVUNL

CHHABRA-I PH-1 TPP

500.00

179

CHHABRA-I PH-2 TPP

500.00

180

CHHABRA-II TPP

1320.00

181

KALISINDH TPS

1200.00

182

KOTA TPS

1240.00

183

SURATGARH STPS

1320.00

184

SURATGARH TPS

1500.00

185

APL

ADANI POWER LIMITED KAWAI TPP

1320.00

186

SCL

SHREE CEMENT LTD TPS

300.00

187

Lignite

JSWBL

JALIPA KAPURDI TPP

1080.00

188

NLC

BARSINGSAR LIGNITE

250.00

189

RRVUNL

GIRAL TPS

250.00

190

Gas

NTPC

ANTA CCPP

419.33

191

RRVUNL

DHOLPUR CCPP

330.00

192

RAMGARH CCPP

273.50

 

Rajasthan Total

 

 

 

11802.83

 

193

Tamil Nadu

Coal

NTECL

VALLUR TPP

1500.00

194

TANGEDCO

METTUR TPS

840.00

195

METTUR TPS-II

600.00

196

NORTH CHENNAI TPS

1830.00

197

TUTICORIN TPS

1050.00

198

CEPL

MUTHIARA TPP

1200.00

199

IBPIL

TUTICORIN (P) TPP

300.00

200

ITPCL

ITPCL TPP

1200.00

201

NTPL

NTPL TUTICORIN TPP

1000.00

202

SPPL

TUTICORIN TPP ST-IV

525.00

203

Lignite

NLC

NEYVELI ( EXT) TPS

420.00

204

NEYVELI NEW TPP

1000.00

205

NEYVELI TPS-II

1470.00

206

NEYVELI TPS-II EXP

500.00

207

ST-CMSECP

NEYVELI TPS(Z)

250.00

208

Gas

TANGEDCO

BASIN BRIDGE GT (Liq.)

120.00

209

KOVIKALPAL CCPP

107.88

210

KUTTALAM CCPP

100.00

211

NARIMANAM GPS

10.00

212

VALUTHUR CCPP

186.20

213

ABAN POWR

KARUPPUR CCPP

119.80

214

PENNA

VALANTARVY CCPP

52.80

215

PPNPGCL

P.NALLUR CCPP

330.50

216

Diesel

MADURAI P

SAMAYANALLUR DG

106.00

217

SAMALPATI

SAMALPATTI DG

105.70

 

Tamil Nadu Total

 

 

 

14923.88

218

Telangana

Coal

NTPC

RAMAGUNDEM STPS

2600.00

219

TELANGANA STPP PH-1

800.00

220

SCCL

SINGARENI TPP

1200.00

221

TSGENCO

BHADRADRI TPP

1080.00

222

KAKATIYA TPS

1100.00

223

Coal

KOTHAGUDEM TPS (NEW)

1000.00

224

KOTHAGUDEM TPS (STAGE-7)

800.00

225

RAMAGUNDEM-B TPS

62.50

 

Telangana Total

 

 

 

8642.50

226

Tripura

Gas

NEEPCO.

AGARTALA GT

135.00

227

MONARCHAK CCPP

101.00

228

ONGC

TRIPURA CCPP

726.60

229

TSECL

BARAMURA GT

42.00

230

ROKHIA GT

63.00

 

Tripura Total

 

 

 

1067.60

231

Uttar Pradesh

Coal

NTPC

DADRI (NCTPP)

1820.00

232

RIHAND STPS

3000.00

233

SINGRAULI STPS

2000.00

234

TANDA TPS

1760.00

235

UNCHAHAR TPS

1550.00

236

UPRVUNL

ANPARA TPS

2630.00

237

HARDUAGANJ TPS

1265.00

238

Coal

UPRVUNL

OBRA TPS

1000.00

239

PARICHHA TPS

920.00

240

BEPL

BARKHERA TPS

90.00

241

KHAMBARKHERA TPS

90.00

242

KUNDARKI TPS

90.00

243

MAQSOODPUR TPS

90.00

244

UTRAULA TPS

90.00

245

LAPPL

ANPARA C TPS

1200.00

246

LPGCL

LALITPUR TPS

1980.00

247

MUNPL

MEJA STPP

1320.00

248

PPGCL (Jaypee)

PRAYAGRAJ TPP

1980.00

249

RPSCL

ROSA TPP Ph-I

1200.00

250

Gas

NTPC

AURAIYA CCPP

663.36

251

DADRI CCPP

829.78

 

Uttar Pradesh Total

 

 

 

25568.14

252

Uttarakhand

Gas

GIPL

GAMA CCPP

225.00

253

SEPL

SRAVANTHI CCPP

439.00

 

Uttarakhand Total

 

 

 

664.00

254

West Bengal

Coal

NTPC

FARAKKA STPS

2100.00

255

DVC

DURGAPUR STEEL TPS

1000.00

256

MEJIA TPS

2340.00

257

RAGHUNATHPUR TPP

1200.00

258

WBPDC

BAKRESWAR TPS

1050.00

259

BANDEL TPS

270.00

260

KOLAGHAT TPS

840.00

261

SAGARDIGHI TPS

1600.00

262

SANTALDIH TPS

500.00

263

CESC

BUDGE BUDGE TPS

750.00

264

SOUTHERN REPL. TPS

135.00

265

TITAGARH TPS

240.00

266

DPL

D.P.L. TPS

550.00

267

DPSCLTD

DISHERGARH TPP

12.00

268

HEL

HALDIA TPP

600.00

269

HMEL

HIRANMAYE TPP

300.00

270

Gas

WBPDC

HALDIA GT (Liq.)

40.00

271

KASBA GT (Liq.)

40.00

 

West Bengal Total

 

 

 

13567.00

 

Grand Total

 

 

 

239072.91

 

This information has been given by the Union Minister for Power and New & Renewable Energy Shri R. K. Singh, in a written reply to a question, in Lok Sabha on December 14, 2023.

***

PIB DELHI | Alok Mishra / Dheep Joy Mampilly



(Release ID: 1986616) Visitor Counter : 2634