Ministry of Jal Shakti
azadi ka amrit mahotsav

Details of Central Funds Released for Irrigation Development of States

Posted On: 13 MAR 2023 6:15PM by PIB Delhi

Water resources projects are planned, funded, executed and maintained by the State Governments themselves as per their own resources and priorities. Role of Government of India is limited to being catalytic, providing technical support and, in some cases partial financial assistance to the States in terms with the existing schemes being implemented by the Department of Water Resources, River Development and Ganga Rejuvenation (DoWR, RD & GR).

The details of Central funds released by the DoWR, RD &GR for the irrigation development of States are as follows:

Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) was launched during 2015-16 by the Central Government with an aim to enhance physical access of water on farm and expand cultivable area under assured irrigation, improve on-farm water use efficiency, introduce sustainable water conservation practices, etc., with the following components: Accelerated Irrigation Benefits Programme (AIBP), Command Area Development & Water Management (CADWM), Surface Minor Irrigation (SMI) / Repair, Renovation & Restoration (RRR) of Water Bodies and Ground Water Irrigation in this Department.

The funds sanctioned and irrigation potential created under PMKSY-AIBP since 2018-19 are given at Annexure-I and Annexure-II respectively. Besides PMKSY-AIBP, Central Assistance are also being provided under Special Package for Maharashtra, Renukaji, Lakhwar, Shahpur Kandi and Polavaram National Projects and Relining of Rajasthan Feeder and Sirhind Feeder of Punjab. During 2018-19 to 2021-22, an irrigation potential of 1.35 lakh hectare has been created through Special Package for Maharashtra and 0.77 lakh hectare irrigation potential has been stabilized by Rajasthan Feeder and Sirhind Feeder of Punjab. The funds sanctioned and irrigation potential created under these projects since 2018-19 are given at Annexure-III.

Further, CADWM Programme has been brought under PMKSY - Har Khet Ko Pani (HKKP) from 2015-16 onwards. The State-wise details of physical and financial progress for the CADWM works since 2018-19 under PMKSY-HKKP component, as reported by the States are given at Annexure-IV.

The scheme of Surface Minor Irrigation (SMI) and Repair, Renovation & Restoration (RRR) of Water Bodies has now become a part of PMKSY (HKKP). Central assistance is being released to States for creation and restoration of irrigation potential. The State-wise; year-wise physical and financial details of SMI and RRR schemes under PMKSY-HKKP since 2018 onwards are given at Annexure-V.

Under PMKSY-HKKP, Ground Water Irrigation scheme aims to provide financial assistance to States for assured ground water irrigation to small and marginal farmers. The scheme is applicable only in areas having stage of ground water development less than 60%, average rainfall more than 750 mm and with shallow ground water levels (less than 15 m bgl). Under this scheme, so far 13 projects have been approved since 2019 in 10 States namely Arunachal Pradesh, Assam, Gujarat, Nagaland, Manipur, Mizoram, Tripura, Tamil Nadu, Uttar Pradesh, and Uttarakhand. Further, 7 project have already been successfully completed in the States of Arunachal Pradesh, Assam, Manipur, Nagaland, Tripura and Uttarakhand. The status of fund allocation under PMKSY-HKKP-GW is given in Annexure-VI. So far, a total of 30,948 wells have been constructed, 77,964 ha command area have been created and 68,538 small & marginal farmers have been benefitted. The State-wise details are given in Annexure-VII.

Ken-Betwa Link Project (KBLP), first link project under National Perspective Plan has been undertaken jointly (Centre and States) through the Special Purpose Vehicle (SPV) of Ken-Betwa Link Project Authority (KBLPA) to provide annual irrigation to an area of 10.62 lakh ha (8.11 lakh ha in Madhya Pradesh and 2.51 lakh ha in Uttar Pradesh). An allocation of budget of Rs. 4,300 crore in R.E. of 2021-22 and Rs. 1,100 crore in 2022-23 have been made for the project. With allocation of additional budget, an amount of Rs. 4,639.46 crore was utilized in 2021-22. The total amount spent on KBLP Phase I & II till date is Rs. 7,998.42 crore including Rs. 5,260.46 crore from Central grant and Rs. 2,737.96 crore from State of Madhya Pradesh.

This information was given by the Minister of State for Jal Shakti, Shri Bishweswar Tudu in a written reply in Rajya Sabha today.

*****

AS

ANNEXURE-I

The funds sanctioned under PMKSY-AIBP since 2018-19 (in Rs. crore)

S.No.

State/UT

2018-19

2019-20

2020-21

2021-22

2022-23

(so far)

(99 AIBP Projects)

1

Andhra Pradesh

0.00

0.00

0.00

0.00

0.00

2

Assam

0.00

0.00

0.00

0.00

41.90

3

Bihar

37.82

11.98

14.12

0.00

0.00

4

Chhattisgarh

0.00

4.09

6.45

3.12

0.00

5

Goa

0.00

0.00

0.00

0.00

0.00

6

Gujarat

1047.29

485.35

177.96

357.28

0.00

7

UT of Jammu & Kashmir

16.92

5.07

9.50

0.00

0.00

8

Jharkhand

305.88

0.00

0.00

0.00

0.00

9

Karnataka

197.00

163.42

231.22

0.00

0.00

10

Kerala

0.00

0.00

0.00

0.00

0.00

11

Madhya Pradesh

81.01

26.45

19.96

59.47

66.35

12

Maharashtra

527.54

291.68

301.85

279.07

17.61

13

Manipur

21.93

30.50

23.51

11.75

24.87

14

Odisha

119.38

90.65

76.39

0.00

0.00

15

Punjab

0.00

0.00

0.00

0.00

204.00

16

Rajasthan

95.15

7.04

93.61

0.00

0.00

17

Telangana

2.00

214.04

162.82

43.95

0.00

18

Uttar Pradesh

397.16

407.68

391.84

0.00

23.90

19

UT of Ladakh

0.00

0.81

0.81

0.00

0.00

20

Uttarakhand

0.00

0.00

0.00

0.00

38.58

 

Total (A)

2849.08

1738.76

1510.04

754.64

417.22

(6 New AIBP projects)

1

Jihe Kathapur project (Maharashtra)

_

_

_

6.48

0.00

2

Nadaun project ( Himachal Pradesh)

_

_

_

2.25

0.00

3

Parwan multipurpose project (Rajasthan)

_

_

_

41.43

0.00

4

Kannadian channel (Tamil Nadu)

_

_

_

9.04

0.00

5

ERM of Sukla irrigation project (Assam)

_

_

_

0.00

41.98

6

ERM of Loktak LIS (Ph-I) (Manipur)

_

_

_

0.00

0.00

 

Total (B)

_

_

_

59.20

41.98

 

Grand Total (A+B)

2849.08

1738.76

1510.04

813.84

459.2

 

 

 

ANNEXURE-II

Irrigation Potential Created under PMKSY-AIBP since 2018-19 (in Th Ha.)

S.No.

State/UT

2018-19

2019-20

2020-21

2021-22

(99 AIBP Projects)

1

Andhra Pradesh

2.03

0.00

0.00

0.00

2

Assam

1.17

0.00

0.00

7.10

3

Bihar

0.20

1.87

0.20

6.56

4

Chhattisgarh

0.00

0.04

0.10

0.00

5

Goa

0.18

0.00

0.00

0.09

6

Gujarat

98.63

28.69

13.91

12.29

7

UT of Jammu & Kashmir

0.00

5.26

0.90

0.36

8

Jharkhand

0.00

0.00

0.61

0.00

9

Karnataka

6.87

1.93

1.34

0.00

10

Kerala

0.80

0.95

0.00

0.00

11

Madhya Pradesh

16.18

11.22

1.74

2.64

12

Maharashtra

74.10

66.22

33.24

43.14

13

Manipur

2.39

0.00

3.79

0.92

14

Odisha

13.10

15.20

3.82

4.43

15

Punjab

0.00

0.00

1.44

21.93

16

Rajasthan

0.12

0.07

0.00

0.00

17

Telangana

9.73

3.74

20.36

40.88

18

Uttar Pradesh

384.88

181.97

48.49

20.06

19

UT of Ladakh

0.00

0.00

0.00

0.00

 

Total (A)

610.38

317.16

129.94

160.40

(6 New AIBP projects)

1

Jihe Kathapur project (Maharashtra)

_

_

_

7.90

2

Nadaun project ( Himachal Pradesh)

_

_

_

0.00

3

Parwan multipurpose project (Rajasthan)

_

_

_

0.00

4

Kannadian channel (Tamil Nadu)

_

_

_

4.12

5

ERM of Sukla irrigation project (Assam)

_

_

_

0.00

6

ERM of Loktak LIS (Ph-I) (Manipur)

_

_

_

0.00

 

Total (B)

--

--

--

12.02

 

Grand Total (A+B)

610.38

317.16

129.94

172.42

 

 

 

ANNEXURE-III

 

 “Comparative spending of central funds by the Ministry”

 

S.No.

Name of Project(s)

Total CA released (in Rs. crore)

 

2018-19

2019-20

2020-21

2021-22

2022-23 (so far)

1

Special Package for Maharashtra

500.00

300.00

400.00

725.00

10.77

2

Renukaji National Project

_

_

_

1,048.54

0.00

3

Lakhwar National Project

_

_

_

0.00

38.58

4

Shahpur Kandi National Project

0.00

60.00

147.45

49.14

0.00

5

Polavaram National Project

1,400.00

1,850.00

2,234.20

1,898.80

0.00

6

Relining of Rajasthan Feeder & Sirhind Feeder

0.00

0.00

0.00

278.05

0.00

 

S.No.

Name of Project(s)

Total Irrigation Potential (IP) created in Th.Ha.

2018-19

2019-20

2020-21

2021-22

1

Special Package for Maharashtra

43.73

45.61

22.14

23.81

2

Renukaji National Project

This is largely a drinking water project. Hence, no irrigation potential is envisaged. Further, this project was included in 2021-22.

3

Lakhwar National Project

This project was included in 2021-22.

4

Shahpur Kandi National Project*

0.00

0.00

0.00

0.00

5

Polavaram National Project**

0.00

0.00

0.00

0.00

6

Relining of Rajasthan Feeder & Sirhind Feeder

0.00

11.63

17.48

48.71

 

*Shahpur Kandi was included on 06.12.2018 i.e. during 2018-19.

**Polavaram dam is under construction. IP creation has been envisaged after the construction of the dam.

 

ANNEXURE-IV

 

 

Status of CADWM component for 99 Prioritized Projects under PMKSY

 

Sl. No.

Name of the State/UT

Financial Progress (CA Progress)

(Amount in Rs. crore)

Physical Progress

(Area in Th. Ha.)

CA release 18-19

CA release 19-20

CA release 20-21

CA release 21-22

Progress 2018-19

Progress 2019-20

Progress 2020-21

Progress 2021-22*

1

Andhra Pradesh

69.18

0.00

0.00

0.000

0.00

0.00

0.00

0.93

2

Assam

3.55

0.00

4.00

0.000

11.92

7.97

3.51

2.00

3

Bihar

14.42

0.00

0.00

0.000

4.00

2.47

3.04

1.02

4

Chhattisgarh

9.93

0.00

0.00

0.000

0.00

0.00

0.00

2.07

5

Goa

0.00

0.00

3.84

0.000

0.75

0.08

0.20

0.00

6

Gujarat

347.04

0.00

0.00

0.000

260.17

1.59

1.57

59.57

7

Jammu & Kashmir

1.70

0.00

1.87

0.000

0.97

0.53

0.19

0.03

8

Jharkhand

0.00

0.00

0.00

0.000

0.00

0.00

0.00

0.00

9

Karnataka

13.49

3.79

11.34

0.000

8.92

3.79

0.10

3.44

10

Kerala

0.00

0.00

2.69

0.000

0.00

0.30

0.30

0.00

11

Madhya Pradesh

70.91

0.00

43.32

15.758

46.94

17.40

24.10

12.60

12

Maharashtra

26.09

0.00

46.23

28.878

40.81

19.65

24.23

16.17

13

Manipur

0.00

0.00

0.00

2.085

5.03

0.00

3.64

0.00

14

Orissa

3.65

0.00

34.47

0.000

19.08

9.61

8.03

4.25

15

Punjab

0.00

0.00

18.08

0.000

0.00

0.00

0.00

20.53

16

Rajasthan

7.43

10.22

31.26

61.258

7.08

0.46

9.11

22.77

17

Telangana

26.12

0.00

0.00

0.000

0.00

10.68

0.00

0.00

18

Uttar Pradesh

0.00

150.00

6.00

0.000

0.00

0.00

0.00

0.00

 

TOTAL :

593.51

164.01

203.10

107.97

405.66

74.54

78.01

145.38

 

* CCA progress as reported by States.

 

 

 

ANNEXURE-V

The state-wise; year-wise physical and financial details of SMI and RRR schemes under PMKSY-HKKP since 2018

SMI SCHEMES (Rs in crore and IPC in Th-Ha)

Sl No.

State

2018-19

2019-20

2020-21

2021-22

2022-23

CA released

IP created

Nos. of schemes completed

CA released

IP created

Nos. of schemes completed

CA released

IP created

Nos. of schemes completed

CA released

IP created

Nos. of schemes completed

CA released

IP created

Nos. of schemes completed

1

Arunachal Pradesh

22.25

0.58

130

17.49

2.79

14

104.69

0.09

0

142.73

0.00

0

41.95

0

0

2

Assam

428.34

9.95

0

414.06

6.73

15

205.62

0.00

143

275.20

0.00

0

0

0

0

3

Bihar

32.28

9.70

12

16.14

8.66

27

10.65

1.30

0

0.00

0.00

0

0

0

0

4

Chhattisgarh

0.00

0.50

4

0.00

0.00

0

0.00

0.00

0

0.00

0.00

0

0

0

0

5

Himachal Pradesh

66.20

2.15

12

147.91

5.46

13

59.80

7.76

63

60.31

3.62

15

0

0

0

6

J&K & Ladakh

31.71

12.34

11

68.58

2.24

2

97.59

0.00

0

0.00

0.00

0

0

0

0

7

Jharkhand

0.00

4.60

38

0.00

0.00

0

0.00

0.00

0

0.00

0.00

0

0

0

0

8

Karnataka

0.00

0.00

5

0.00

0.00

0

0.00

0.00

0

0.00

0.00

0

30.00

0

0

9

Madhya Pradesh

0.00

0.00

0

0.00

0.00

2

0.00

0.00

0

0.00

0.00

0

0

0

0

10

Manipur

0.00

0.70

102

0.00

0.00

0

69.26

5.79

0

75.98

0.00

0

0

0

0

11

Meghalaya

31.50

0.00

0

22.22

3.07

37

57.07

3.66

14

100.47

4.76

14

37.5

0.65

15

12

Mizoram

0.00

0.00

0

11.34

1.59

0

7.65

0.49

0

4.66

0.00

0

0

0

0

13

Nagaland

35.33

2.02

0

20.46

1.98

0

35.99

0.00

60

40.89

0.00

0

1.57

0

0

14

Sikkim

16.61

0.25

0

9.13

0.83

0

9.33

0.00

156

9.71

0.00

0

0

0

0

15

Tripura

0.00

0.00

0

9.00

0.00

0

0.00

0.00

0

0.00

0.00

0

0

0

0

16

Uttarakhand

61.00

1.96

137

31.78

4.61

96

0.00

2.58

68

29.63

0.00

0

0

0.45

0

 

Total

725.20

44.77

451

768.11

37.95

206

657.65

21.67

504

739.58

8.38

29

111.03

1.10

15.00

 

RRR Scheme

Sl No.

State

2018-19

2019-20

2020-21

2021-22

2022-23

CA released

IP restored

Nos. of schemes completed

CA released

IP restored

Nos. of schemes completed

CA released

IP restored

Nos. of schemes completed

CA released

IP restored

Nos. of schemes completed

CA released

IP restored

Nos. of schemes completed

1

Andhra Pradesh

2.70

0.00

0

0.00

0.00

0

0.00

0.00

0

0.00

0.00

0

0

0

0

2

Bihar

6.26

0.00

0

11.82

0.00

6

0.00

17.87

0

8.62

0.00

0

0

0

0

3

Gujarat

8.81

0.00

0

0.00

0.14

3

0.00

0.00

0

0.00

0.00

0

1.58

0.55

5

4

Madhya Pradesh

0.00

0.00

0

0.00

0.00

3

0.00

0.00

0

0.00

0.00

0

0

0

0

5

Manipur

0.00

0.00

0

24.26

0.00

0

0.00

0.00

0

0.00

0.00

0

0

0

0

6

Meghalaya

0.00

0.00

0

0.00

0.03

4

0.00

0.00

0

0.00

0.00

0

0

0

0

7

Odisha

0.00

2.51

62

0.00

1.46

33

34.54

0.00

0

0.00

0.00

0

5.10

0.11

5

8

Rajasthan

0.00

2.85

21

11.96

0.00

14

0.00

0.00

1

0.00

0.00

1

9.30

0

0

9

Tamil Nadu

7.03

0.74

31

16.75

0.00

0

1.25

0.82

53

17.43

0.10

7

0

1.26

41

10

Telangana

0.00

8.51

214

0.00

3.62

57

0.00

0.80

66

0.00

0.00

0

0

9.57

96

11

Uttar Pradesh

0.00

2.35

8

0.00

0.00

0

0.00

0.00

0

0.00

0.00

0

0

0

0

 

Total

24.80

16.96

336

64.79

5.25

120

35.79

19.49

120

26.05

0.10

8

15.98

11.49

147

 

 

ANNEXURE -VI

Fund release to the State in FY- 2019-20, 2020-21, 2021-22 and 2022-23 under PMKSY-HKKP-GW Scheme

Sl.No

State

Projects

Project cost in crore

CA released in 2019-20 (in crore)

CA released in 2020-21(in crore)

CA released in 2021-22 (in crore)

CA released in 2022-23 (in crore)

1

Assam

Assam Phase-I

246.07

132.87

13

37.8

0

2

Assam Phase-II

292.96

0

10

242.29

0

3

Arunachal Pradesh

Arunachal Pradesh Pahse-I

45.3

24.46

10

5.985

0

4

Arunachal Pradesh Pahse-II

44.95

24.15

0

15.295

0

5

Gujarat

Gujarat

140.34

6

0

28.5

24.85

6

Nagaland

Nagaland

18.15

9.75

0

5.85

0

7

Manipur

Manipur

61.68

0

33.306

21.09

0

8

Mizoram

Mizoram

16.04

0

8.66

0

0

9

Tamil Nadu

Tamil Nadu

9.13

0

3.67

1.61

0

10

Tripura

Tripura Phase-I

13.31

7.15

0

2.38

0

11

Tripura Phase-II

48.34

0

0

26.1

0

12

Uttarakhand

Uttarakhand

15.89

0

1.36

12.36

0

13

Uttar Pradesh

Uttar Pradesh

46.37

16.69

0

0

10

 

Total

998.53

221.07

80.0

399.26

34.85

 

 

 

ANNEXURE- VII

Status of Irrigation Project under PMKSY-HKKP-GW (as on 31st January, 2023)

S.No

Projects

Wells constructed

Nos.

Project Command

Ha

Beneficiaries

Nos

1

Assam-Ph-I

4,779

19,116

19,643

2

Assam Phase-II

4,916

19,532

17,200

3

Arunachal Pradesh-Ph-I

473

1,785

3,350

4

Arunachal Pradesh Ph –II

519

1,957

3,633

5

Nagaland

262

667

264

6

Tripura Ph-I

231

339

851

7

Tripura Ph-II

883

735

1,166

8

Manipur

550

2,057

1,445

9

Mizoram

133

333

296

10

Uttar Pradesh

16,005

27,944

16,505

11

Uttarakhand

206

1,030

1,085

12

Gujarat

1,826

1,866

1,908

13

Tamil Nadu

163

603

1,192

 

Total

30,948

77,964

68,538

 

*****



(Release ID: 1906489)


Read this release in: Urdu , Manipuri