Production of Crude Oil and Natural Gas Month of November, 2011
PRESS INFORMATION BUREAU

PRESS INFORMATION BUREAU

GOVERNMENT OF INDIA

***

 

PRODUCTION OF CRUDE OIL AND NATURAL GAS DURING THE MONTH OF NOVEMBER, 2011

New Delhi : December 22, 2011

I.       

A. CRUDE OIL PRODUCTION  – PERFORMANCE

Month / Period

Planned Target (MMT)

Actual Production (MMT)

%age achievement

Surplus(+) Shortfall(-) Vis-à-vis target (%age)

Surplus(+) Shortfall(-) over last year   (%age)

November, 2011*

3.134

3.084

98.4

-1.6

-5.7

April-November, 2011*

25.403

25.527

100.5

0.5

2.9

April-November, 2010

 

24.812

 

 

 

MMT: Million Metric Tonnes.

 

 

*: Provisional.

B. COMPANY-WISE ACHIEVEMENT

 

 

 

Company / State

Planned Target (MMT)

Actual Production (MMT)

%age achievement

Surplus(+) Shortfall(-) (%age)

ONGC

1.9620

1.9400

98.9

-1.1

  Gujarat

0.4520

0.4610

102.0

 

  Andhra Pradesh

0.0190

0.0250

131.6

 

  Tamil Nadu

0.0160

0.0210

131.3

 

  Assam

0.0960

0.0990

103.1

 

  Mumbai Region                             (incl Mumbai High)

1.3790

1.3340

96.7

 

OIL

0.3079

0.3112

101.1

1.1

  Assam

0.3061

0.3093

101.1

 

  Arunachal Pradesh

0.0017

0.0019

109.8

 

PRIVATE/JVC

0.8646

0.8332

96.4

-3.6

TOTAL

3.1344

3.0845

98.4

-1.6

C. REASONS FOR SHORTFALL

Company / State

Reasons for shortfall

Mumbai High Offshore

Less than anticipated oil gain from development wells.  Production effected due to high GOR/high water cut and less than anticipated oil gain from Vasai East.  Less line condensate receipt from Off-shore.

A statement showing Crude Oil Production during November, 2011 and cumulatively for the period April- November, 2011 vis-à-vis 2010-11 planned production is at Annexure-I.

 

II.  A. REFINERY PRODUCTION

 

    (IN TERMS OF CRUDE THROUGHPUT)

 

Month / Period

Planned Target (MMT)

Actual Production (MMT)

%age achievement

Surplus(+) Shortfall(-) Vis-à-vis target         (in %age)

Surplus(+) Shortfall(-) over last year          (in %age)

 

November, 2011*

13.71

14.42

105.2

5.2

11.2

 

April-November, 2011*

107.09

111.37

104.0

4.0

4.5

 

April- November, 2010

 

106.56

 

 

 

 

*: Provisional.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The crude throughput in IOC (Guwahati, Brauni, Koyali, Mathura, Bongagaon & Haldia), BPCL (Mumbai & Kochi), HPCL (Mumbai ), ONGC Tatipaka and RIL Jamnagar refineries have exceeded their planned target.

 

The crude throughput in IOC (Panipat & Digboi),  HPCL (Visakh), CPCL (Manali & Narimanam (CBR), NRL (Numaligarh), MRPL Mangalore & EOL (Vadinar)  refineries was less than their planned target.

 

B. REASONS FOR SHORTFALL :

 

 

 

Company / State

Reasons for shortfall

 

IOCL, Panipat

●   T`put restricted due to shutdown in DHDT.

 

IOCL, Digboi

●   T`put restricted due to problem in Wax Hydro Finishing Unit & shutdown in Delayed Coker Unit for steam air decoking.

 

 

 

A statement showing refinery-wise production during the month of November, 2011 and cumulatively for the period April- November, 2011 vis-à-vis 2010-11 planned target is at Annexure-II.

 

 

 

 

III.  REFINERY CAPACITY UTILISATION [excluding RPL(SEZ)]

 

 

 

Month

Utilisation (%)

Period

Utilisation (%)

 

 November, 2011*

109.4

April- November, 2011

104.2

 

 November, 2010

101.6

April- November, 2010

102.6

 

 

 

The refinery-wise details of the capacity utilisation during November, 2011 and cumulatively for the period April- November, 2011 vis-a-vis 2010-11 are given in Annexure-III.

 

 

 

IV.        A.  NATURAL GAS PRODUCTION

 

Month / Period

Planned Target (MCM)

Actual Production (MCM)

%age achieve-ment

Surplus(+) Shortfall(-) Vis-à-vis target    (%age)

Surplus(+) Shortfall(-) over last year     (%age)

 

November, 2011*

4312.2

3847.4

89.2

-10.8

-10.1

 

April-November, 2011*

34163.6

32278.8

94.5

-5.5

-8.5

 

April-November, 2010

 

35293.0

 

 

 

 

MCM: Million Cubic Metres.         

*: Provisional.

 

 

B.     COMPANY-WISE ACHIEVEMENT

 

Company / State

Planned Target (MCM)

Actual Production (MCM)

%age achievement

Surplus(+) Shortfall(-) (%age)

 

ONGC

1983.0

1911.3

96.4

-3.6

 

  Gujarat

148.9

156.1

104.8

 

 

  Rajasthan

1.3

1.4

110.5

 

 

  Andhra Pradesh

106.3

119.3

112.2

 

 

  Tamil Nadu

100.4

106.2

105.7

 

 

  Assam

39.0

42.5

108.9

 

 

  Tripura

49.1

53.7

109.5

 

 

  Mumbai High Offshore

1538.0

1432.1

93.1

 

 

OIL

219.4

218.0

99.4

-0.6

 

  Assam

198.7

196.1

98.7

 

 

  Arunachal Pradesh

1.5

1.3

87.4

 

 

  Rajasthan

19.2

20.6

107.3

 

 

PRIVATE/JVC

2109.7

1718.1

81.4

-18.6

 

  Onshore $

68.0

55.7

81.9

 

 

  Offshore

2041.7

1662.4

81.4

 

 

TOTAL

4312.2

3847.4

89.2

-10.8

 

$: Including Coal Bed Methane production.

 

C.     REASONS FOR SHORTFALL

 

Company / State

Reasons for shortfall

 

ONGC (Mumbai High Off-shore)

Less than anticipated production from  B-22 field. 

 

PRIVATE/JVC (Arunanchal Pradesh)

Underperformace of newly drilled wells.  Water & sand ingress in older wells.

 

PRIVATE/JVC (Assam)

Only one well is currently under production.

 

PRIVATE/JVC (West Bengal)

Incidentally produced CBM is being sold in small quantities.

 

PRIVATE/JVC (Rajasthan)

Gas production is less due to decline in NANG production from RDG field.

 

A statement showing natural gas production during November, 2011  and cumulatively for the period April- November, 2011 vis-à-vis 2010-11 is at Annexure-IV.

 

Click here to see Annexure I to IV

*****

 