II. A. REFINERY
PRODUCTION
|
|
(IN TERMS OF CRUDE THROUGHPUT)
|
|
Month / Period
|
Planned
Target (MMT)
|
Actual
Production (MMT)
|
%age
achievement
|
Surplus(+)
Shortfall(-) Vis-à-vis target
(in %age)
|
Surplus(+)
Shortfall(-) over last year
(in %age)
|
|
November, 2011*
|
13.71
|
14.42
|
105.2
|
5.2
|
11.2
|
|
April-November, 2011*
|
107.09
|
111.37
|
104.0
|
4.0
|
4.5
|
|
April- November, 2010
|
|
106.56
|
|
|
|
|
*: Provisional.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The crude
throughput in IOC (Guwahati,
Brauni, Koyali, Mathura,
Bongagaon & Haldia), BPCL (Mumbai &
Kochi), HPCL (Mumbai ),
ONGC Tatipaka and RIL Jamnagar refineries have
exceeded their planned target.
|
|
The crude
throughput in IOC (Panipat
& Digboi), HPCL
(Visakh), CPCL (Manali & Narimanam (CBR), NRL (Numaligarh), MRPL Mangalore
& EOL (Vadinar) refineries was less than their planned
target.
|
|
B. REASONS FOR SHORTFALL :
|
|
|
|
Company / State
|
Reasons for
shortfall
|
|
IOCL, Panipat
|
●
T`put restricted due to
shutdown in DHDT.
|
|
IOCL, Digboi
|
●
T`put restricted due to
problem in Wax Hydro Finishing Unit & shutdown in Delayed Coker Unit
for steam air decoking.
|
|
|
|
A statement
showing refinery-wise production during the month of November, 2011 and
cumulatively for the period April- November, 2011 vis-à-vis 2010-11 planned
target is at Annexure-II.
|
|
|
|
|
III. REFINERY CAPACITY UTILISATION [excluding
RPL(SEZ)]
|
|
|
|
Month
|
Utilisation (%)
|
Period
|
Utilisation (%)
|
|
November, 2011*
|
109.4
|
April-
November, 2011
|
104.2
|
|
November, 2010
|
101.6
|
April-
November, 2010
|
102.6
|
|
|
|
The
refinery-wise details of the capacity utilisation during November, 2011 and
cumulatively for the period April- November, 2011 vis-a-vis 2010-11 are given in Annexure-III.
|
|
|
|
IV.
A. NATURAL GAS PRODUCTION
|
|
Month /
Period
|
Planned
Target (MCM)
|
Actual
Production (MCM)
|
%age
achieve-ment
|
Surplus(+)
Shortfall(-) Vis-à-vis target
(%age)
|
Surplus(+)
Shortfall(-) over last year
(%age)
|
|
November, 2011*
|
4312.2
|
3847.4
|
89.2
|
-10.8
|
-10.1
|
|
April-November, 2011*
|
34163.6
|
32278.8
|
94.5
|
-5.5
|
-8.5
|
|
April-November, 2010
|
|
35293.0
|
|
|
|
|
MCM: Million Cubic Metres.
|
*: Provisional.
|
|
|
B.
COMPANY-WISE ACHIEVEMENT
|
|
Company / State
|
Planned
Target (MCM)
|
Actual
Production (MCM)
|
%age
achievement
|
Surplus(+)
Shortfall(-) (%age)
|
|
ONGC
|
1983.0
|
1911.3
|
96.4
|
-3.6
|
|
Gujarat
|
148.9
|
156.1
|
104.8
|
|
|
Rajasthan
|
1.3
|
1.4
|
110.5
|
|
|
Andhra Pradesh
|
106.3
|
119.3
|
112.2
|
|
|
Tamil Nadu
|
100.4
|
106.2
|
105.7
|
|
|
Assam
|
39.0
|
42.5
|
108.9
|
|
|
Tripura
|
49.1
|
53.7
|
109.5
|
|
|
Mumbai High Offshore
|
1538.0
|
1432.1
|
93.1
|
|
|
OIL
|
219.4
|
218.0
|
99.4
|
-0.6
|
|
Assam
|
198.7
|
196.1
|
98.7
|
|
|
Arunachal
Pradesh
|
1.5
|
1.3
|
87.4
|
|
|
Rajasthan
|
19.2
|
20.6
|
107.3
|
|
|
PRIVATE/JVC
|
2109.7
|
1718.1
|
81.4
|
-18.6
|
|
Onshore $
|
68.0
|
55.7
|
81.9
|
|
|
Offshore
|
2041.7
|
1662.4
|
81.4
|
|
|
TOTAL
|
4312.2
|
3847.4
|
89.2
|
-10.8
|
|
$: Including Coal Bed Methane
production.
|
|
C.
REASONS FOR SHORTFALL
|
|
Company / State
|
Reasons for shortfall
|
|
ONGC (Mumbai High Off-shore)
|
Less than anticipated production
from
B-22 field.
|
|
PRIVATE/JVC (Arunanchal Pradesh)
|
Underperformace of newly drilled wells. Water & sand ingress in older wells.
|
|
PRIVATE/JVC
(Assam)
|
Only
one well is currently under production.
|
|
PRIVATE/JVC (West Bengal)
|
Incidentally produced CBM is
being sold in small quantities.
|
|
PRIVATE/JVC (Rajasthan)
|
Gas production is less due to
decline in NANG production from RDG field.
|
|
A statement
showing natural gas production during November, 2011 and
cumulatively for the period April- November, 2011 vis-à-vis 2010-11 is at
Annexure-IV.