Punctuality Performance of Indian Railways improved in 2019-20 in comparison to 2018-19
Mail/Express Train punctuality improved to 74.21% in 2019-20 in comparison to 67.05% in 2018-19
Passenger Train punctuality improved to 70.54% in 2019-20 in comparison to 66.58% in 2018-19
Indian Railways is continuously working for the improvement of the punctuality of the trains. With its continued effort, Indian Railways has succeeded in improving the Punctuality Performance in 2019-20 in comparison to 2018-19. The average of punctuality performance percentage from April to September in the financial year 2019-20 of Mail/Express trains has improved to 74.21% in comparison to 67.05% from April to September in the financial year 2018-19.
The punctuality performance percentage of the Passenger Trains of Indian Railways for the period of April to September in the financial year 2019-20 improved to 70.54% in comparison to 66.58% from April to September in the financial year 2018-19.
The details of punctuality performance percentage of Indian Railways during 2018-19 and 2019-20 month-wise are as follows:-
Punctuality % on Indian Railways during 2018-19 & 2019-20
|
Month
|
Mail /Express
|
Passenger
|
2018-19
|
2019-20
|
2018-19
|
2019-20
|
Apr
|
60.52
|
72.13
|
65.21
|
68.87
|
May
|
59.95
|
68.78
|
64.86
|
67.33
|
Jun
|
65.23
|
70.83
|
65.68
|
67.26
|
Jul
|
70.12
|
74.10
|
66.96
|
69.58
|
Aug
|
72.66
|
78.20
|
67.83
|
74.44
|
Sep
|
73.52
|
81.42
|
68.97
|
75.77
|
IR PP%
|
67.05
|
74.21
|
66.58
|
70.54
|
In order to improve the punctuality, Railways has taken numerous steps including:
- Rigorous monitoring at Divisional, Zonal and Railway Board levels.
- Removal of infrastructure bottlenecks in a planned manner.
- Integrated Mega Blocks are planned in such a way that all asset maintenance departments can do their work simultaneously.
- End to end running of some trains with diesel locomotives to avoid detention on account of loco changing from diesel to electric.
- Conversion of conventional rakes of Mail/Express trains (Integral Coach Factory rakes) into LHB (Linke Hofmann Busch) rakes.
- Rationalization of Time Table in order to make a group of similar speed trains.
- Curtailment of stoppage time at major terminals.
- Commissioning of 1st phase of Dedicated Freight Corridor.
- High capacity water pumps at watering stations to minimize detention on this account.
- Provision of Bye-pass stations to avoid engine reversal etc.
- Also, for attaining accuracy in punctuality data, the timing of arrival and departures are prominently being captured automatically through data-loggers. It is being monitored through dashboards – called “Rail Drishti” at highest level to promote punctuality.
*****