Projects to Improve the Condition of Roads in Punjab

 

The Minister of State for Road Transport and Shipping and Chemical & Fertilizers Shri Mansukh L Mandaviya in a written reply to a question in Lok Sabha today informed that the details of projects sanctioned to improve the conditions of National Highways in the State of Punjab in year 2014-2018 are as follows :

 

 

Sr. No.

Name of the Project

Name of districts involved

Length of the project(Km)

Time line for completion

1

Improvement of Amritsar bypass by construction of addtional structures and service road on NH-1 between km 448+510 to km 473+068 on the state of Punjab on EPC (PIU-Jalandhar)

Amritsar

24.55

10.11.2018

2

ROB at Amritsar in Km.112.50 on LC No. A/12/B/2 along with HLB over adjoining UBDC Canal.

Amritsar

0.00

March, 2019

3

Consultancy for conducting FS & preparing DPR for newly declared NH 503Ai.e. ASR -Mehta-Sri Hargobindpur Tanda Hoshiarpur Una Road

Amritsar & Hoshiarpur

0

Work Completed

4

4-laning of Amritsar-Taran Tran-Harike section of NH-15 from Km 112.575 to 158.350

Amritsar & Tarntaran

45.775

Work completed

5

Reconstruction/Widening of culverts at km 296.770, 305.160 & km 316.400

Bathinda

0

Nov, 2018

6

Const. of H/L Br. 5 span 50.91 m over Lisara Drain at vill.Sangar x-ingkm.21.948 & const. of H/L Br. 6 span 67.91 m over Lisara Drain at vill.Pathrala in km 36.72 sec.bti.-dabwali rd. CWD BTI.

Bathinda

-

Work completed

7

Road  safety Km. 0.00 to  40.440 on section Bathinda-Dabwali 

Bathinda

0.00

Work completed

8

Up-gradation for Rampura-Maur section of NH-254 in Km 82.40 to 104.20

Bathinda

21.80

Work completed

9

Widn. To 2 - L  with P/S  & STG. In Km 0.00-16.490 of NH 754 Bathinda Mukatsar Jalalabad road

Bathinda

16.49

Work Completed

10

ROB at Maur in Km 105.05 on LC No. C-221

Bathinda

0.00

Nov, 2018

11

ROB at Bathinda in Km 7.60 on LC No. C-184/B

Bathinda

0.00

Oct, 2018

12

Up-gradation for NH-254 section Rampura-Maur-Talwandi Sabo-Raman Mandi in Km 104.200 to 132.00

Bathinda

26.41

Sept., 2018

13

4-laning of Bathinda Malout road km 292.00 to 293.00 (Bathinda city)

Bathinda

1.00

Work Completed

14

4-laning of Bathinda-Dabwali section of NH-64A from Km 35.00 to 40.440

Bathinda

5.44

Work Completed

15

4-laning of Tapa –Bathinda  section of NH-64 from Km 168.00 to 209.405

Bathinda

41.445

Work completed

16

ROB at Faridkot on Km. 223.70 on LC No. 31/B

Faridkot

0.00

March, 2019

17

ROB at Kotkapura in Km. 236.00 on LC No. SPL-26

Faridkot

0.00

March, 2019

18

4-laning of Faridkot-Kotkapura-Bathinda section of NH-15 from Km 221.380 to 287.615

Faridkot & Batinda

62.115

Work completed

19

Const. of 2mtr single span bridge over Aspal drain crossing ABOHAR-FAZILKA Road in km. 392.450.

Fazlika

-

Work completed

20

Widening of bridge of 4 span 6.00m RCC slab type bridge over Tahliwala drain at Km. 403.100 and 4 span 8.00m RCC slab type bridge over Korianwall Drain km. 405.850 on Abohar Fazilka sec.

Fazlika

-

Work completed

21

Const.of Bridge in Ditch drain at km/RD 413.400 Sec.Fazilka-Sulemannke border (Near Fazilka)

Fazlika

-

Work completed

22

Constn. Of propossed Bridge Sabuana Drain at km.418.30 NH.10 Sec. Fazilka-Sulemanke road CWD Abohar

Fazlika

-

Work completed

23

Providing service lanes on DHS road. Sec.MALOUT-ABOHAR from km.348.550 - 351.700

Fazlika

3.15

Work completed

24

Providing service lane on Sec.ABOHAR-USMANKHERA road from km.389.400-391.100

Fazlika

1.70

Work completed

25

Imp.of Accident Black Spot by providing Bus Lay Byes,Improvement of T-junction &providing 4-Laning/Service Lane 5.5m wide on both side of DHS-Road Sec.DABWALI -MALOUT in km.319-323 Vill Mehna&km.329.00 vill.LAMBI Sub Tehsil, on MALOUT-ABOHAR Sec.in km.366/367 Vill/BALLUANA&on Sec.ABOHAR -FAZILKA in km.389Vill NIHAL KHERA

Fazlika

 

Work completed

26

Consultancy for conducting FS & preparing DPR for Abohar Sitoguno Dabwali  Road

Fazlika

0

Work Completed

27

Constn. of bridge 3 span 10.00m each over Defence Drain Xing NH10 Fazilka Sulemanke Border At Km. 419.300

Fazlika

0

March, 2019

28

Constn. of multiple Box type bridge  2 span 6.00m each over Malout Drain at Km 322.850 of NH 15

Fazlika

0

Work Completed

29

Raising & Strg. Section Dabwali-Malout Km 326.00 to 327.200 (Proposed Raising  due to water logged area )

Fazlika

1.20

Work Completed

30

Construction of bridge over  Sarawan  Drain km. 361.900

Fazlika

 

Work Completed

31

Section Dabwali-Malout bridge over Wahab Wala Drain at Km 324.400

Fazlika

---

Work Completed

32

Raising and strengthening in km 372.900 to km 376.240 and in km 382.540 to km 385.190 on Abohar-Usmankheda road section of NH-15 (New NH-62)

Fazlika

5.99

Work Completed

33

Widn to 4-laning  of NH-10 from Km 375.800-382.0000 Passing through (Abohar Town)

Fazlika

6.20

Work Completed

34

Road Safety improvement including construction of service roads from Km 339.00 to 340.470 on NH-10 (New NH - 09) at Abulkhurana Village

Fazlika

0.00

Work Completed

35

Improvement of 7 Junctions on Abohar bypass (New NH - 07) to the State of Punjab

Fazlika

0.00

Work Completed

36

Widening/Upgradation of Abohar-Sito Gunno-Dabwali Road (NH-354E)

Fazlika

50.89

March, 2020

37

Consultancy Services for Carrying out Road Safety Audits on NH-10 & NH-64A

Fazlika & Muktsar

0.00

Work Completed

38

Widening/Upgradation of Moga-Kot Ise Khan-Makhu-Harike-Khalra Road (NH-703B)

Ferozepur

75.167

March, 2020

39

Widening / Upgradation of Makhu-Mallanwala-Ferozepur (upto Arifke) Road Section

Ferozepur

24.6

March, 2020

40

Construction of ROB in eplacement of existing L Xing No.A-54/E-2 at Km. 198.050 at Ferozepur.

Ferozepur

 

Work completed

41

Consultancy for conducting FS & preparing DPR for Harike Mallanwala FZR.on NH 5 Mukatsar Sahib Malout Road on NH 62 & Moga Harike Khalra Road

Ferozepur

0

Work Completed

42

Re-construction of narrow unsafe bridge over Zira distbutray in Zira town RD. 186.300  (Section Zira to Talwandi Bhai)

Ferozepur

---

Work Completed

43

ROB at Jalalabad in Km. 61.80 on LC No. C-57

Ferozepur

0.00

July, 2019

44

4-laning of Harike-Zira-Faridkot section of NH-15 from Km 166.925 to 221.380

Ferozepur & Faridkot

56.7

Work completed

45

IRQP from Km 158.350 to 166.925 in Harike town (bypassed section)

Ferozepur

8.575

Nov, 2018

46

IRQP from Km 206.190 to 210.140 in Mudki town (bypassed section)

Ferozepur

3.95

Nov, 2018

47

IRQP from Km 196.260 to 201.765 in Talwandi Bhai town (bypassed section) including of narrow bridge over Talwandi drain at RD. 198.40

Ferozepur

5.505

Nov, 2018

48

IRQP from Km 182.40 to 188.260 in Zira town (bypassed section)

Ferozepur

5.86

Nov, 2018

49

Ramdas To Gurdaspur (Pkg-V) (Bharatmala Project) (PIU-Jalandhar)

Gurdaspur

47.492

LoA on 22.03.2018

50

Work of service lane 5.5m carrigeway Km. 38.200.-39.600 sec. JAL. HOSP. Manali Road to H.P. Border

Hoshiarpur

2.80

Work completed

51

Improvement of geometrics including construction of retaining walls,  brest walls, drain/cross drainage structures etc from Km 49.200 to 58.850

Hoshiarpur

 

March, 2019

52

Widening & stg. Of existing Nakodar Bye Pass from Km. 23.134- 25.765 including Widn. Culvert /minor bridge CWD JULL.

Jalandhar

2.63

Work completed

53

Providing and fixing of road safety measures on Jalandhar-Kapurthala-Sultanpur Lodhi (Dadwindi) Gidderpindi from Km 4.4 to Km 60.86 on NH-703A

Jalandhar

-

Work completed

54

widening of existing carriageway from 5.50 m to 10.00 with strengthening Km 38.100 to 48.490  (Km as per existing road) section Sultanpur Lodhi to Gidder Pindi (New NH stretch)

Jalandhar

-

Work completed

55

Constn. Of propossed Bridge over Sidhwan Drain at km.58.00-58.03  Sec.Shahkot Dharamkot road CWD FZR.

Jalandhar

-

Work completed

56

Stergthning of Jalandhar-Kapurthala-Sultanpur Lodhi  from Km 4.4 to Km 9.00 .

Jalandhar

4.60

Work completed

57

Widn. To 2 - L  with P/S  & STG. In Km 62.600-76.150 of NH 703A Jalandhar Kapurthala Makhu road

Jalandhar

13.975

March, 2019

58

Rehabilitation of ROB at Km 1.23 on Jalandhar-Hoshiarpur road section of NH-70 (New NH-03) under PBF

Jalandhar

 

Work Completed

59

Road Safety of Jalandhar-Hoshiarpur  road from Km 1.23 to 8.00 section of NH-70 (new NH-03)

Jalandhar

 

March, 2019

60

4-laning of  Lambra-Shahkot section of NH-71  from Km 11.00 to 44.600

Jalandhar

33.6

Nov, 2018

61

Widening 2-L with P/S & STG. Km. 48.49-60.86 Sec Sultanpur Lodhi Gidderpindi

Jalandhar

12.37

Work completed

62

4-laning of Jalandhar-Hoshiarpur upto Himachal Border of NH-70 from Km 11.400 to 49.200 including Hoshiarpur bypass

Jalandhar & Hoshiarpur

39.125

Oct, 2019

63

4-laning of Shahkot-Moga section of NH-71  from Km 44.600 to 77.200

Jalandhar & Moga

32.6

Nov, 2018

64

RFP Document for appointment of technical consultant for preparation of feasibility study (FS) and detailed project report (DPR) for newly declared National Highways (NH-703 A, NH-754, NH-154A & NH-703)

Jalandhar & Pathankot, Ferozepur

0.00

Work completed

65

4-Laning of Phagwara-Rupnagar section of NH-344A from KM 0.00 (design Chainage) to KM 80.820 (Design Chainage) in the state of Punjab on Hybrid Annuity mode.(PIU-Jalandhar)

Kapurthala, Nabhashar

80.82

03.04.2020

66

Ludhiana-Talwandi Bhai Section of NH-95 on EPC Mode (PIU-Ludhiana)

Ludhiana

6.02

(Completed)

67

Construction of 4-lane (Partial Access Controlled) Laddowal Bypass from Km. 0.000 to km. 17.041 linking NH-95 with NH-1 via Laddowal seed farm at Ludhiana in the State of Punjab on Hybrid Annuity Mode (PIU-Ludhiana)

Ludhiana

17.041

25.12.2019

68

Construction of Elevated Corridor partially access controlled highway from Samrala Chowk at Km. 76.000 to Km. 85.980 of NH-95 (Section passing through Ludhiana City) in the State of Punjab on EPC mode (PIU-Ludhiana)

Ludhiana

12.95

07.04.2020

69

Feasibility study and preparation of DPR of in-principle approved NH (Khanna-Malerkotala-Raikot-Jagraon road,  

Ludhiana

0.00

Nov, 2018

70

4/6 laning of Kharar-Ludhiana Section of NH-95 (New NH-5) from km 10.185 to km 86.199 Samrala Chowk, Ludhiana in the State of Punjab on Hybrid Annuity mode. (PIU-Mohali)

Ludhiana, SAS Nagar-Mohali, Ropar, Fateshgarh Sahib

76.014

14.09.2019

71

Widening and paved shoulder of  Tohana (in Haryana) Punjab/Haryana Border  to Moonak-Jakhal-Budhlada-Bhikhi from Km 236.600 to 287.710 of NH-148B

Mansa

45.888

March, 2020

72

Widening & stg. Of Barnala-Mansa- Sardulgarh road KM.127.00-138.00.CWD BTI.

Mansa

11.00

Work completed

73

Providing and fixing of road safety measures on Barnala Mansa Sardulgarh Sirsa Road  Km 101.00-171.67 CWD BTI.

Mansa

 

Work completed

74

Widening 2-L with P/S & STG. Km. 200.95-221.85,227.75-234.62 Sec Barnala Mansa Sardulgarh Sirsa (EPC Mode)

Mansa

27.77

Work completed

75

Consultancy for preparation of feasibility report and detailed project report for Punjab/Haryana Border to Moonak-Jakhal-Budhlada-Bhikhi from Km 247.150 to 287.710 section of NH-148 B & 20.55 Km portion of Fatehbad-Ratia-Budhlada road falling in State of Punjab which is in-principle NH

Mansa

 

Nov, 2018

76

4-laning of Moga -Tallewal section of NH-71 from Km 77.200 to 114.00

Moga

36.8

Nov, 2018

77

4-laning of Tallewal-Barnala section of NH-71 from Km 114.00  to 136.070 including Barnala bypass  Km 136.070 of NH-71 to Km 149.00 of NH-64

Moga & Barnala

29.64

Nov, 2018

78

Consultancy for preparation of feasibility report and detailed project report for Mudki to Rampura from Km 0.00 to 82.27 section of 254

Moga & Ferozepur

 

Work Completed

79

Widening/Upgradation of Mudhki to Jawahar Singh Wala RD. 0.00 to 38.00 section of NH-254

Moga & Ferozepur

38.00

March, 2020

80

4-laning of existing two lane with paved shoulder road from Talwandi Bhai to Ferozepur NH-05 (Old NH-95) from Km.170.380 to Km.194.040 in the State of  EPC mode (PIU-Ludhiana)

Moga,Ferozepur

24

LoA on 28.02.2018

81

Construction of Fly-over at Derabassi from Km. 29.830 to Km 30.970 of NH-22 (Ambala-Chandigarh Section) on EPC Mode (PIU-Mohali)

Mohali

Fly over

(Completed)

82

4-laning of Chandigarh- Kharar Section from Sector-39 (Round about) at Chandigarh (km. 0.000) to Kharar (km. 10.185) of NH-21 in the State of Punjab on EPC mode under NHDP Phase V (PIU-Mohali)

Mohali

10.185

08.04.2019

83

4-laning of Kharar-Kurali Section from km 15.765 to km 29.900 of NH-205 (Old NH-21) including Kurali bypass in the State of Punjab under NHDP Phase-III on EPC mode (PIU-Mohali)

Mohali, Ropar

14.035

15.08.2018

84

Constn. Of 2 mtr span culvert in Km 358.470 & 360.230 sec Malout Abohar

Muktsar

0.00

Work completed

85

improvement of Road Safety through improvement of junctions of Gidderbaha-Malout road at Km 313.800 (Bharu Chowk) and at Km 315.650 (Husnar Chowk) in Gidderbaha town on NH-15

Muktsar Sahib

 

March, 2019

86

improvement of Road Safety through improvement of junction on NH-10 & NH-15 at Km 348.550 at Malout

Muktsar Sahib

 

March, 2019

87

Widening of bridge over Sirhind Feeder Km/RD.333.780  section Lambi - Malout

Muktsar Sahib

0.00

Work completed

88

Widening of existing carriageway from 7.00 Mtr to 10.00 Mtr with strengthening in Km. 16.580 to Km.44.780 (Section Bathinda to Sri Muktsar Sahib road portion.) NH-754

Muktsar Sahib

28.2

Work Completed

89

4-laning of Gidderbaha-Malout section of NH-15 from Km 330.00 to 331.00 (Malout Town)

Muktsar Sahib

1.00

Work Completed

90

Widening Of existing carriageway from 5.50-7.00 m along with stg. Km 29.660-62.847 of Kotkapura -sri Mukatsar Sahib -Jalalabad road  CWD FZR.

Muktsar Sahib & Ferozepur

27.28

Work completed

91

Four lanning in KM 0.150-5.50 of Section Pathankot-Mamoon Chowk

Pathankot

5.36

Work completed

92

special repair of southern bypass Patiala constructed and Handed over by BRO to State PWD B&R "Restoration of Damages and rectification of depression in the pavement surface on approaches to structures to make it traffic worthy" (Non Bituminous items of work inc. road safety measures

Patiala

18.60

Work completed

93

4-laning of Patiala Bypass on EPC mode

Patiala

19.28

Work completed

94

4-laning of  Rajpura-Patiala section of NH-64 from Km 28.100 to 50.00

Patiala

21.9

Work completed

95

4-laning of  Patiala Bypass to start of Sangrur Bypass section of NH-64 from Km 64.570 to 106.170

Patiala & Sangrur

41.47

Work completed

96

ROB at Nangal in Km. 63.00 on LC No. 92-C

Roopnagar

0.00

June, 2020

97

ROB at Nangal in Km. 59.870 on LC No. 88-C

Roopnagar

0.00

June, 2020

98

Consultancy for conducting FS & preparing DPR for  NH 344Ai.e. Banga Garhshankar Anandpur Sahib Naina devi Road

Roopnagar & SBS Nagar

0

Dec, 2018

99

Consultancy for conducting FS & preparing DPR for NH 5 Near Prem Nagar Bassi Pathana Fatehgarg Sahib Patiala Byepass  Road

Roopnagar, Fatehgarh Shaib & Patiala

0

Dec, 2018

100

Strengthening/IRQP of Road Portion Km 179.495 to 181.805= 2.31km of Sangrur-Patran-Khanauri Road NH-71(52) Internal City portion Sangrur not falling under NHDP-IV Scheme

Sangrur

2.31

Nov, 2018

101

ROB at Barnala in Km.140.650 on LC No. B-92/A-2

Sangrur

0.00

Nov, 2018

102

4-laning of Sangrur to Dogal Kalan section of NH-71 from Km 181.805 to Km 211.390

Sangrur

29.585

Work completed

103

4-laning  of  Dogal Kalan to Punjab/ Haryana border section of NH-71 from Km 211.390 to Km 238.695 

Sangrur

27.305

Work completed

104

4-laning of Sangrur and Dhanauala Bypass

Sangrur

18.24

Work completed

105

4-laning of end of Sangrur Bypass to Tapa from Km 116.950 to 138.030 & Km142.950 to 168.00 

Sangrur & Bathinda

46.04

Work completed

106

Strengthening/IRQP of road portion km 227.800 to 232.660= 4.86 Km of Sangrur-Patran-Khanauri Road upto Punjab/Haryana border

Sangrur

4.86

Nov, 2018

107

Stg. Of ROB. Kurali Toll Plaza Km.25.54-27.50 on chd.-Ropar rd. CWD ROPAR.

SAS Nagar

1.96

Work completed

108

Providing and fixing of road safety measures on Ambala-Naraingarh road from Km 9.23-13.75 on NH-72(1520

SAS Nagar

-

Work completed

109

Providing and fixing of road safety measures on Chandigarh-Ropar road from Km 0.871-1.68 &KM 6.80-15.40 .

SAS Nagar

-

Work completed

110

Consultancy for conducting FS & preparing DPR for newly declared NH 205A i.e. Kharar Banur Tepla  Road

SAS Nagar

0

Work Completed

111

4-laning of  Zirakpur-Rajpura section of NH-64 from Km 0.00 to 28.100

SAS Nagar & Patiala

28.1

Work completed

112

Providing and fixing of road safety measures on Chandigarh-Ludhiana road from Km 0.00-10.400 & KM 17.125-31.200.

SAS Nagar & Roopnagar

-

Work completed

113

Road Safety in Km 81.9 to Km 88.00 on NH-344A

SBS Nagar

0.00

Work completed

114

Khemkaran –  To start to Amritsar Bypass (Pkg-II)  (Bharatmala Project) (PIU-Jalandhar)

Tarn- Taran

48.823

LoA on 19.03.2018

115

4-laning of Harike Bypass section of NH-15 from Km  158.350 to 166.925

Trantaran

9.9

Work completed

*Letter of Acceptance given

*****

NP/MS/MS