Ministry of Fisheries, Animal Husbandry & Dairying
azadi ka amrit mahotsav

India Adds 2,361 MW Biomass Capacity, 228 MWe Waste-to-Energy and 2.88 Lakh Biogas Plants in Last Ten Years

प्रविष्टि तिथि: 17 DEC 2025 12:49PM by PIB Delhi

Ministry of New and Renewable Energy supports installation of Bioenergy Projects in the country under National Bioenergy Programme (NBP), Phase-I, which was notified on 02.11.2022, with a budget outlay of Rs. 998 Crore, for the period 2022-23 to 2025.26. The details of Central Financial Assistance (CFA) provided is given at Annexure-I.

During the last ten years, the Government has been supporting Bioenergy Projects through various Schemes, namely National Biogas and Manure Management Programme (NBMMP) during 12th Five Year Plan, New National Biogas & Organic Manure Programme (NNBOMP) from 2018-19 to 2020-21, Scheme to support promotion of Grid interactive Biomass Power and Bagasse cogeneration in sugar mills during 12th Plan Period, Programme on Energy from Urban, Industrial and Agricultural Wastes /Residues during 12th Plan period, Scheme to support Promotion of Biomass based Cogeneration in Sugar Mills and other Industries in the Country from 2018-19 to 2020-21.

The details of bioenergy projects installed in the country during the last ten years, State-wise, is given at Annexure-II. Further, new bioenergy projects are being promoted under the NBP Phase-I.

Annexure-I

The existing CFA Support for setting up of Bioenergy Projects in the country under National Bioenergy Programme is given as under:

Waste to Energy Programme

CFA in Rs Crore

Biogas generation

Rs 0.25 Crore per 12000cum/day

BioCNG generation

Rs 4.0 Crore per 4800 kg/day (for BioCNG generation from new biogas plant)

Rs 3.0 Crore per 4800 kg/day (for BioCNG generation from existing Biogas plant)

Power generation based on Biogas

Rs 0.75 Crore/MW (for power generation from new biogas plant)

Rs 0.5 Crore/MW (for power generation from existing Biogas plant)

Power based on bio & agro-industrial waste

Rs 0.4 Crore/MW

Biomass Gasifier

Rs. 2,500 per kWe with dual fuel engines for electrical application

Rs. 15,000 per kWe with 100% gas engines for electrical application

Rs. 2 lakh per 300 kWth for thermal applications

 

Biomass Programme

CFA

Briquette manufacturing plants

Rs. 9.00 Lakhs/ TPH

(Maximum CFA- Rs. 45.00 Lakh per project).

Non-Torrefied Pellet manufacturing plant

Rs. 21 lakhs/MTPH production capacity or 30% of the capital cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 105 lakhs per project)

 

Torrefied Pellet manufacturing plant

Rs. 42 lakhs/MTPH production capacity or 30% of the capital cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 210 lakhs per project)

 

Non-Bagasse Cogeneration Projects

Rs. 40 Lakhs/ Megawatt

Maximum CFA- Rs. 5.00 Crore per project).

 

Biogas Programme

CFA

For small biogas plants (1-25 cubic meter/day plant capacity):

Rs. 9,800/- to Rs. 70,400/- per plant based on size of the plant in cubic meter

For Power generation and thermal application (25 - 2500 cubic meter/day plant capacity):

Rs. 35,000/- to Rs. 45,000/- per kilowatt for power generation

Rs. 17,500/- to Rs. 22,500/- per kilowatt equivalent for thermal applications.

 

Note: 20% higher than Standard CFA in for NER, Island, Registered Gaushalas and SC/ST beneficiaries);

 

Annexure-II

REFERRED TO IN REPLY TO THE LOK SABHA UNSTARRED QUESTION NO. 2809, Part (d) TO BE ANSWERED ON 17.12.2025 on ‘Financial Assistance for Bio-Energy Programme’.

The details of bioenergy projects installed in the country during the last ten years is given as under:

 

 

Biomass Projects

Waste to Energy Projects

Biogas Plants

Sl No

State

Capacity (MW)

Capacity (MWe)

Nos

1

Andhra Pradesh

35.1

35.95

28505

2

Arunachal Pradesh

0

0

349

3

Assam

2

0

23612

4

Bihar

39.8

0.32

236

5

Chhattisgarh

54

0

11030

6

Goa

0

1

140

7

Gujarat

12

15.2

5427

8

Haryana

87.4

17.39

3487

9

Himachal Pradesh

1.5

0

294

10

Jharkhand

14.8

1.04

545

11

Karnataka

536.81

8.41

34657

12

Kerala

1.55

0.23

9639

13

Madhya Pradesh

31.2

5.86

32120

14

Maharashtra

1073.5

24.26

71653

15

Manipur

0

0

25

16

Meghalaya

0

0

867

17

Mizoram

0

0

648

18

Nagaland

0

0

102

19

Odisha

0.6

0

5966

20

Punjab

140.29

21.77

19288

21

Rajasthan

19.85

1.19

2404

22

Sikkim

0

0

170

23

Tamil Nadu

112.55

8.68

1740

24

Telangana

4.03

9.79

11159

25

Tripura

0

0

546

26

Uttarakhand

12.5

6.89

8362

27

Uttar Pradesh

146.6

41.34

3594

28

West Bengal

31.6

4.06

851

29

Andaman and Nicobar Islands

0

0

0

30

Chandigarh

0

0

0

31

Dadra and Nagar Haveli and Daman & Diu

3.75

0

18

32

NCT of Delhi

0

24.17

0

33

Jammu & Kashmir

0

0

101

34

Ladakh

0

0

0

35

Lakshadweep

0

0

0

36

Puducherry

0

0

0

37

Others

0

0

10544

 

Total

2361.43

227.56

288079

 

***

Navin Sreejith


(रिलीज़ आईडी: 2205042) आगंतुक पटल : 256