Ministry of Road Transport & Highways
Parliament Question: - National Highways in Bihar
Posted On:
19 DEC 2024 4:09PM by PIB Delhi
Development and maintenance of National Highways (NHs) is a continuous process. The list of NH projects in Bihar approved for implementation are at Annexure-I. The list of ongoing NH projects in Bihar are at Annexure-II. The list of NH projects in Bihar completed during last ten years is at Annexure-III.
The bottlenecks in the ongoing and approved for implementation of NH projects in Bihar including Katihar are mainly due to delay in land acquisition, forest clearance, utility shifting, etc.
21 new toll plazas have been proposed in the State of Bihar. There is no new toll plaza proposed in Katihar district.
User fee rates on NHs throughout the country including Bihar are revised annually in accordance with NH Fee Rules 2008.
The details of toll plaza-wise number of toll tenders which have been extended beyond their original period are at Annexure-IV.
ANNEXURE-I
ANNEXURE-I REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024, ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
List of NH projects in Bihar approved for implementation
Sl. No
|
Name of Project
|
NH No.
|
Length (km)
|
1
|
Construction of 4 lane with paved shoulder of Darbhanga (Dilli More) - Banwari Patti from km 0.00 to km 14.95 (Package-1) including Pre-construction activities from km 0.00 to km 53.133 of NH-105(New NH-527B)
|
527B
|
14.95
|
2
|
Four lane with Paved shoulder configuration from Existing Km 0+000 to Km 39+500 (design km (0+500) to Km 40+342, Design length km) of NH – 227A ( near Mehrauna Ghat (UP – Bihar Border) to Siwan on Hybrid Annuity Model (HAM) basis
|
227A
|
40.842
|
3
|
Construction of Four-Lane of Chausa-Buxar Bypass from Km 45.000 to Km 65.915 (Package – 2)
|
319A
|
20.915
|
4
|
Construction to two-laning with paved shoulder of Daudnagar Bypass, Nasriganj Bypass and Dawath Bypass of NH-120
|
120
|
5.535
|
5
|
Construction of 6 no of Mangobandhar Kendua, Tolesono, Jhajha,Narganjo & Bhairogunj Bypasses including Pre-Construction activities from km 72.000 to 134.000 of NH - 333A
|
333A
|
41.271
|
6
|
Construction of Four lane with paved shoulder of Bhagalpur– Kharhara village (Dhaka more) from Km- 0+000 to KM 36+600 of NH 133E
|
133 E
|
36.6
|
7
|
Construction for 2 Lane ROB over L.C. No 2 between Muktapur & Kishanpur Station on Samastipur - Darbhanga Road (NH-322) in Samastipur District
|
322
|
1.64
|
8
|
Construction of 3 no. of Bypasses at Sheikhpura, Jamui & Khaira including Pre-Construction activities from km 0 to km 72.00 of NH-333A
|
333A
|
13.472
|
9
|
Construction of additional 3-Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH-922
|
922
|
3.30
|
10
|
4 lanning of Manikpur to Sahebganj section
|
139W
|
44.65
|
11
|
6L Patna – Purnia Expressway
|
--
|
270
|
ANNEXURE II
ANNEXURE-II REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024, ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
List of ongoing NH projects in Bihar
37
|
4L Greenfield Alignment of Amas to Shivrampur from 0.000 Km. to
55.002 Km. of NH 119 D (Pkg-I)
|
55.00
|
31.03.2023
|
10.88
|
29.03.2025
|
38
|
6L of Aurangabad to Bihar-Jharkhand border (Chordaha) section from km. 209.827 to Km. 249.525 of NH-19 (PKG-02)
|
39.70
|
05.04.2022
|
63.92
|
31.03.2025
|
39
|
4L Elevated Section and at-grade improvements at Begusarai town (Simaria - Khagaria section) from Km. 221.047 to Km. 225.302 of NH- 31
|
4.26
|
27.06.2022
|
63.17
|
31.03.2025
|
40
|
Aunta - Simaria including Ganga Bridge
|
8.15
|
30.08.2018
|
88.77
|
31.03.2025
|
41
|
Maheshkunt-Saharsa-Purnea (Pkg I) km 0.00 to km. 90.00 of NH-107
|
90.00
|
20.12-2019
|
76
|
31.03.2025
|
42
|
Widening with additional 3L abetting Chhapra Bypass Section of NH-19 from Km. 143.200 to Km. 159.255 (Pkg-1)
|
16.05
|
30.08.2024
|
4.42
|
29.08.2026
|
43
|
6L Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH-131G) starting from Km
8.480 near Sherpur to Km 23.000 near Dighwara
|
14.52
|
05.09.2023
|
1.25
|
05.09.2027
|
44
|
Chhapra - Hajipur from km. 143.200 to km. 209.200
|
66.74
|
27.01.2011
|
86.7
|
30.04.2025
|
45
|
Construction of Major Bridge over Baghmati and Lakhandei River along with Approaches from Design km.16.500 to km.21.500
|
5.00
|
30.10.2024
|
0
|
31.03.2027
|
46
|
4L of Greenfield Alignment from Km. 47.000 to Km. 89.210 of
Balbhadarpur to Bela Nawda Section of NH-119D
|
42.21
|
11.03.2024
|
6.6
|
10.03.2026
|
47
|
4L Elevated Highway and at grade improvements at Gopalganj Town from Km. 384.000 to Km. 386.750 on NH-27
|
2.75
|
04.03.2022
|
92.18
|
31.03.2025
|
48
|
2L PS of Majhauli to Charout section from km. 0.00 to km. 63.655
|
63.66
|
05.11.2019
|
96.05
|
31.03.2025
|
49
|
Permanent rectification of 8 Nos. of blackspots on NH-27 & 1 No of at - grade junction removal near Satanpur junction
|
10.259
|
19.11.2024
|
0.00
|
18.11.2026
|
50
|
4L Greenfield starting from NH-30 near Saristabad (Patna) to Nathupur (Project end point of Patna-Gaya- Dobhi Section of NH-83)
|
3.91
|
27.02.2024
|
10.2
|
07.09.2025
|
51
|
4L Greenfield Alignment of Shivrampur to Ramnagar from Km.
55.002 to Km. 109.300 of NH 119 D (Pkg-II)
|
54.32
|
04.07.2023
|
10.3
|
03.07.2025
|
52
|
4L of Balance works of Patna - Gaya
-Dobhi (Pkg-II) from km. 39.00 to km. 83.00 of Old NH-83
|
44.00
|
09.11.2020
|
98.5
|
31.12.2024
|
53
|
4L of Balance works of Patna - Gaya
-Dobhi (Pkg-III) from km. 83.00 to km. 127.217 of Old NH-83
|
44.22
|
24.11.2020
|
98.4
|
31.12.2024
|
54
|
4L of Balance works of Patna - Gaya
-Dobhi (Pkg-I) from km. 0.00 to km.
39.00 of Old NH-83
|
39.00
|
14.12.2020
|
99.9
|
31.12.2024
|
55
|
4L of Siwan- Masrakh section of Ram Janki Marg from Km 230.385 to Km 281.391 of NH-227A
|
50.12
|
20.11.2024
|
0
|
20.11.2026
|
56
|
Construction of 2 flyovers of 4- lanes at Chhatauni Chowk and Awadesh Chowk on NH-28A, Re-construction of 3 no. of gantry girder gates with the statue of Mahatma Gandhi on NH-28 and NH-28A & Construction of Service Road and Drain near Piprakothi on NH27
|
3.34
|
11.07.2024
|
0
|
11-01-2026
|
57
|
Rehabilitation and Upgradation of Chroma - Bairgania Section of National Highway No 227F to 2 lane with paved shoulders from Design Ch.0.000 to Ch. 34.566
|
34.57
|
01.02.2024
|
43.5
|
31.01.2026
|
58
|
Permanent rectification of 3 nos. of black spots in U.P border - Dewapur - Kotwa section & Permanent rectification of 5 nos. of black spots in Kotwa - Mehsi - Muzaffarpur Section of NH - 27
|
13.60
|
12.12.2023
|
0
|
11.12.2025
|
59
|
Balance work - WB-10 (Gandak Bridge) Km 402.00 to Km 440.00 (Devanpur - Kotwa)
|
2.75
|
30.07.2022
|
62.48
|
31.03.2025
|
60
|
4L of Munger – Mirzachauki section from Munger to Kharia village junction from Km 69+520 to Km 95+580 (Pkg-1)
|
26.06
|
31.03.2022
|
35.02
|
30.06.2025
|
61
|
4L of Munger – Mirzachauki section
|
29.42
|
12.03.2022
|
64.23
|
25.03.2025
|
|
from Km 95+580 to Km 125+000 (Pkg-2)
|
|
|
|
|
62
|
4L of Munger – Mirzachauki section from start of existing Bhagalpur bypass to Rasulpur from Km 125+000 to Km 157+350 (Pkg-3)
|
32.35
|
06.04.2022
|
45.05
|
30.09.2025
|
63
|
4L of Munger – Mirzachauki section from Km 157+350 to Km 193+931 (Pkg-4)
|
36.58
|
17.08.2022
|
60.89
|
31.03.2025
|
64
|
Strengthening under one time improvement of 4L of Bakarpur Hat (NH19 Bypass) –Manikpur section of NH-139W
|
38.81
|
08.10.2024
|
0
|
05.04.2027
|
65
|
4L Elevated Corridor from Danapur to Bihta
|
25.08
|
11.03.2024
|
13.64
|
08.09.2026
|
66
|
4L Greenfield Alignment from Kalyanapur to Tal Dashraha of NH- 119D (Pkg-III)
|
47.00
|
16.02.2023
|
13.85
|
31.12.2025
|
67
|
Bakhtiyarpur-Rajauli Pkg-III from km. 101.630 to km.152.520
|
50.89
|
31.12.2021
|
98.23
|
15.02.2025
|
68
|
Bakhtiyarpur (Km 153.300) to Mokama (Km 197.900)
|
44.60
|
14.06.2017
|
96
|
31.03.2025
|
69
|
Maheshkunt -Saharsa-Purnea Pkg II
|
87.96
|
13.12.2018
|
76.88
|
31.03.2025
|
70
|
Ara - Mohania (Pkg-II)
|
60.80
|
16.01.2021
|
98.45
|
31.03.2025
|
71
|
Six Laning of Varanasi to Aurangabad from km. 786.00 to km.
978.40 of Old NH-2
|
192.40
|
12.09.2011
|
86.14
|
31.03.2025
|
72
|
Umagaon-Saharsa (Package-V) Bakaur-Parsarma-Bangaon-Bariyahi & Spur to Mahishi
|
39.18
|
15.12.2023
|
46.89
|
14.12.2025
|
73
|
Umagaon-Saharsa (Package-IV) Koshi Bridge & approach Road - (Bheja-Bakaur)
|
13.30
|
12.02.2020
|
68.2
|
30.06.2025
|
ANNEXURE III
ANNEXURE-III REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024, ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
List of NH projects in Bihar completed during last ten years
SI.
No.
|
Name of Project
|
Length (in km)
|
Expenditure ( Rs. in crore)
|
Date of Completion
|
1
|
Widening & Strengthening of existing single lane to double lane carriageway in Km 68.10 to Km 86.25 of NH-110
|
18
|
58.71
|
28.04.2017
|
2
|
Strengthening & widening to 2 lane with paved shoulder from Km 39 to Km 56 of NH-327E
|
17
|
44.13
|
23.03.2017
|
3
|
Strengthening & widening to 2 lane with paved shoulder from Km 98 to Km 112 of NH-327E.
|
14
|
63.83
|
25.03.2017
|
4
|
Strengthening & widening to 2 lane with paved shoulder from Km 68 to km 75 NH-327E
|
7
|
33.42
|
15.03.2017
|
5
|
Strengthening & widening to 2 lane with paved shoulder from Km 154 to Km 166 of NH-327E
|
12
|
57.0
|
05.04.2017
|
6
|
Widening and strengthening of existing road into 2 lane from km 14.50 to km 30 of NH-101 (Job No-101-BR-2012-839)
|
15.5
|
30.06
|
31.03.2018
|
7
|
Widening to 2-lane and improvement from km 0.00 to km 14.60 of Malaypur- Barhat-Lalmatia-Khadigram Road (MDR) in under LWE
|
14.6
|
20.87
|
25.03.2014
|
8
|
Widening and strengthening of existing road into 2 lane with paved shoulder in km 0.00 (Dobhi) to 11.400 (Gosaidih) of NH-99
|
11.4
|
40.28
|
31.05.2018
|
9
|
Widening & Strengthening of existing single lane to double lane Carriage way from km. 0.00 to km 28 of NH-105 under Special Project Scheme
|
28
|
86.53
|
30.05.2018
|
10
|
Balance work Construction of 5 x 24.00 High Level R.C.C. Bridge across Noon River in replacement of old narrow and damaged screw pile bridge in Km 45th of NH 103 (Hajipur - Musarigharari Section) for the year 2006 - 07
|
MJB
|
18.68
|
30.06.2018
|
11
|
Strengthening & Widening work of existing 2-lane to two lane with paved
|
4.5
|
4.5
|
30.06.2018
|
|
shoulder including service road & divided carriageway in Araria from km 93.612 to
98.00 of NH-327E.
|
|
|
|
12
|
Widening and strengthening existing single/ intermediate lane to 2-lane from km. 30.25 to km 55.40 of NH 81 under special project for 2011-12.
|
25
|
139.61
|
30.06.2018
|
13
|
Upgradation of existing carriageway to 2 lanes/2 lane with paved shoulders configuration of Anishabad-Aurangabad- Hariharganj Section (km 0.0 – km 154.625) of NH-98 -Lot-II
|
89
|
365.58
|
25.09.2018
|
14
|
Strengthening & Widening of existing carriageway to 2 lane with paved shoulders from Km 40 to km 64 of NH- 28B
|
24
|
93.84
|
30.06.2018
|
15
|
Widening & Strengthening of existing single lane to double lane Carriage way from km. 28 to 53.76 of NH-105 under Special Project Scheme
|
25.76
|
164.48
|
15.10.2018
|
16
|
Construction of Bhagalpur bypass from Km 124/175 to 140/200 of NH-80 under EPC mode
|
16.7
|
301.91
|
11.06.2019
|
17
|
Strengthening & Widening of existing carriageway to two lane with paved shoulder from km 0 to 39 of NH 327E
|
39
|
108.06
|
25.03.2019
|
18
|
Upgradation to 2 lanes/2 lane with paved shoulders of Anishabad-Aurangabad- Hariharganj Section (km 0.0 – km 154.625) of NH-98 - Lot-I
|
62
|
355.36
|
24.10.2019
|
19
|
Strengthening & Widening to 2 lane with paved shoulder from km 0.00 to 40.00 on EPC mode on NH 2C
|
40
|
231.3
|
28.12.2019
|
20
|
Strengthening & Widening of existing carriageway to two lane with paved shoulder from km 56 to km 68 of NH 327E
|
12
|
40.71
|
31.05.2019
|
21
|
Strengthening & Widening of existing carriageway to two lane with paved shoulder from km 75 to 93.612 of NH 327E
|
18.612
|
72.62
|
05.12.2019
|
22
|
Improvement of stretch & junction at km
0.00 to 1.40 of NH-80 for the year 2016-
17 under job no. NH-080-BR-2016-17- RSCE-032.
|
1.4
|
18.5
|
29.12.2018
|
23
|
Widening & strengthening to 2-lane with paved shoulder from km 62 to 75 of NH- 333
|
13
|
68.5
|
20.06.2019
|
24
|
Widening & strengthening to 2 lane with paved shoulder & Geometric Improvements in Bettiah -Kushinagar section from km 25 to 40 of NH-28B
|
15
|
76.3
|
20.02.2019
|
25
|
Balance work of widening to 2-lane and Improvement of Biharsharif (Telhara) - Jehanabad- Arwal (Kendui) Km 36.00 to
68.10 of NH-110
|
32.1
|
82.97
|
31.07.2019
|
26
|
Strengthening from 136 to 166 including replacement of 1 Minor Bridge in km 143 of NH-80
|
31
|
37.85
|
31.03.2021
|
27
|
Strengthening and widening to 2 lane with paved shoulder from km 112.00 to
136.440 (Gitawas-Raniganj JVC Canal) of NH-327E
|
24.385
|
100.44
|
07.01.2021
|
28
|
Strengthening work from km 0.00 to km
36.50 (Mehrauna UP Border to Siwan) of NH-227A on EPC
|
36.5
|
37.25
|
30.01.2021
|
29
|
HL RCC Minor Bridge (2x21m) in km 24 of NH-333 job no.
|
Bridge
|
4.43
|
27.06.2020
|
30
|
Construction of High level New RCC Bridge (5x11eff) in replacement of existing old narrow and damaged bridge no. 135/1 in km 135 of NH-327E
|
Bridge
|
5.95
|
15.07.2020
|
31
|
Strengthening and Raising of NH-19 (Chapra-Manjhi section) from km 129 to 135 & from km 139 to 143.
|
9.218
|
14.67
|
26.10.2020
|
32
|
Strengthening & Widening work of existing 2-lane to two lane with paved shoulder from 0.00 to 25.010 of NH- 327A
|
25.01
|
76.74
|
31.05.2020
|
33
|
Strengthening & Widening work of existing 2-lane to two lane with paved shoulder and geometric improvement from km 64.00 to 97.00 of NH-28B
|
29.6
|
243.1
|
24.06.2021
|
34
|
Strengthening work in Km 53.00 to 89.00 of NH-33(old NH-110) on EPC mode
|
35.609
|
28.85
|
03.05.2021
|
35
|
Widening & Strengthening of existing Single lane to Double lane carriageway in Km 0 to 40 of NH-104 in Bihar under EPC mode
|
40
|
186.84
|
29.02.2020
|
36
|
Strengthening from 194.01 to 227.11 of NH-327E
|
33.1
|
34.69
|
24.06.2020
|
37
|
Balance work of widening & strengthening from km 167 to km 180 of NH- 80 for the year 2016-17
|
13
|
21.37
|
31.05.2018
|
38
|
Widening to 2 lane with paved shoulder
|
19.04
|
90.32
|
02.11.2021
|
|
in km 0.00 to 19.04 of NH-81 on EPC Mode
|
|
|
|
39
|
Construction of 4-lane ROB of km 119 of NH-30 (L.C No 48-A/3T)
|
1.56
|
96.49
|
25.05.2021
|
40
|
Rehabilitation and upgrading to 2 lanes/ 2 lane with paved shoulders configuration of Fathua-Harnaut-Barh section (km 0.00 to km 69.00) of NH-30A in Bihar - One time Improvement of left out portion of Harnaut Bypass of NH-30A
|
3.12
|
2.1
|
27.09.2021
|
41
|
Strengthening work in Km 35.00 to 64(P) of NH-333A on EPC mode
|
29.25
|
24.4
|
16.06.2021
|
42
|
Strengthening work of NH 227A (Part) from Chakia (NH-28) to Lalachhapra chowk via Kesariya from km 118.040 to km 142.756 on EPC mode.
|
24.716
|
27.24
|
14.12.2021
|
43
|
Strengthening work in Km 35.00 to 64(P) of NH-333A on EPC mode
|
29.25
|
24.4
|
16.06.2021
|
44
|
Strengthening including improvement of geometrics work from km 104.20 to km 110 of NH-28B (New NH-727) on EPC
mode
|
5.8
|
16.6
|
31.03.2021
|
45
|
Construction of 4-lane ROB (L.C No SK/257C) of km 11 of NH-327E
|
ROB
|
79.7
|
31.07.2022
|
46
|
Strengthening from km 38.85 to 97.05 of NH-227A
|
56.75
|
64.97
|
21.03.2022
|
47
|
One time improvement of left out portion of ROB at km 12 of NH-103 and km 132 & 135 of NH-19 on item rate mode
|
4.95
|
3.95
|
27.09.2021
|
48
|
Widening and strengthening of existing road into 2 lane with paved shoulder from Pokhrauni Chowk to Junction with NH- 57 near Jhanjharpur (km 0.00 o 28.00) of NH-527A in the State of Bihar
|
26.3
|
98.84
|
30.09.2022
|
49
|
Strengthening and widening to 2 lane with paved shoulder from km 103.865 to
142.050 (Gaya-Goh) of NH-120
|
37.885
|
126.28
|
31.03.2022
|
50
|
Strengthening work in Km 38.84 to 59.00 Of NH-333 on EPC mode.
|
20.16
|
21.59
|
30.06.2021
|
51
|
Strengthening work in km 123.00 to
142.00 of NH-333A on EPC Mode
|
19
|
15.81
|
30.06.2021
|
52
|
Strengthening work in Km 75.25 to 91.00 of NH-333 on EPC Mode
|
15.75
|
21.9
|
31.03.2021
|
53
|
Strengthening of Road from km 91.00 to
115.00 of NH-333 on EPC mode
|
24
|
26.7
|
15.05.2021
|
54
|
Widening and strengthening from km
115.00 (Tola Kurwa) to 141.050 (Bishunpur) of NH-333
|
26.5
|
95.77
|
15.02.2022
|
55
|
Construction of RCC Minor bridge in km 02, km 14, km 40 and km 43 of NH-333
|
bridge
|
23.5
|
30.09.2022
|
56
|
Strengthening work from Km 0.00 (Paswan chowk) to 58.450
(Mushrigharari) of NH-103 on EPC Mode
|
55.5
|
64.3
|
30.04.2022
|
57
|
Reconstruction of damaged Bridge over river Tungi Bridge on NH-82 (H.L. RCC Bridge Km 38)
|
Bridge
|
19.3
|
19.08.2021
|
58
|
Strengthening including improvement of geometrics work from km 97 to km
104.20 of NH-28B (New NH-727 on EPC
mode
|
7.2
|
8.52
|
16.10.2020
|
59
|
Construction of 2-lane combined ROB in lieu of level crossing No-KK-12 of km 48 (Pranpur) of NH-81
|
1.48
|
48.5
|
21.09.2022
|
60
|
Construction of Major bridge over Bhangia River at km 86.936 of NH-327E & its approaches on EPC mode
|
0.34
|
14.01
|
30.01.2023
|
61
|
Widening to 2 lane with paved shoulder and strengthening from km 19.860 to
38.060 of NH-219 on EPC Mode
|
18.2
|
99.41
|
07.05.2022
|
62
|
Strengthening from Ch. 16.000 to 19.860 and Ch 38.060 to Ch 40.000 of NH-219 on EPC mode in the State of Bihar
|
5.8
|
19.6
|
01.08.2022
|
63
|
Strengthening work in Km 0.00 to 34.00 of NH-333A on EPC Mode.
|
34
|
27.58
|
30.11.2022
|
64
|
Rehabilitation of 4-lane 5.575 km long, 4- lane MG Setu over Ganga River on NH-
19 from km 212.72 to km 218.95 by dismantling the damaged pre stressed cantilever arms Superstructure and subsequent redecking by steel truss in Patna on EPC mode
|
5.575
|
1856.98
|
31.07.2022
|
65
|
Engineering, Procurement, and Construction of Rehabilitation and Upgrading to 2- lanes/2 - lane with Paved Shoulders Configuration and Strengthening of Fatuah-Harnaut-Barh Section (km 0 to km 69.6) of NH-30A in the State of Bihar under Phase-I of National Highways Inter-connectivity Improvement Projects (NHIIP)
|
71.8
|
812.6
|
31.05.2022
|
66
|
Widening & Strengthening to 2 lane with paved shoulder from Km 30.00 to 45.00 of NH-101 in the State of Bihar item rate
|
15
|
63.86
|
15.04.2022
|
67
|
Construction of 2-lane ROB in lieu of level crossing No-KK-4A of km 31 (Mania)of NH-81
|
ROB
|
47.95
|
20.01.2023
|
68
|
Widening & Strengthening from km
100.40 to km 107.80 (from Lakhanpur More to Faijullahpur) of NH-227A under EPC mode in the state of Bihar
|
7.4
|
22.69
|
30.05.2022
|
69
|
Strengthening & widening to 2 lane with paved shoulder from Km 0.00 to 14.50 of NH-101 for the year 2017-18 in the State of Bihar on item rate
|
13
|
53.09
|
15.12.2021
|
70
|
Construction of 03 Nos. New High Level RCC Minor Bridges (2*21.60m) in Km
62 (Chainage-61+247), (2*18.60m) in Km 62 (Chainage-61+650) & (2*18.60m) in Km 64 in Replacement of existing old Narrow and damaged Bridge of NH-110 on EPC mode in the State of Bihar
|
Bridge
|
15.42
|
31.03.2023
|
71
|
Strengthening & Widening from km 0.00 to 10.80 of NH-21
|
67.13
|
50.67
|
30.06.2022
|
72
|
Widening and strengthening from km
179.00 to 198.93 of NH-333A
|
52.4
|
40.28
|
31.03.2021
|
73
|
Construction of New High Level RCC major Bridge (13X31m)in place of old submersible damaged bridge in Km178 on NH-333A across River Chanan in the state of Bihar on EPC mode
|
0.503
|
42.94
|
24.11.2023
|
74
|
Construction of 2-lane ROB of km 46 (LC No KT2-2/B)of NH-131A (Katihar)
|
1.051
|
43.11
|
01.06.2023
|
75
|
Widening to 2 lane with paved shoulder and strengthening from km 45.00 to 65.00 (design length- 18.990) of NH-101 on EPC Mode
|
20
|
84.70
|
30.06.2022
|
76
|
Remaining work for Strengthening & Widening work of existing road into 2 lane with paved shoulder from Pokhrauni Chowk to Junction with NH 57 near Jhanjharpur (km 0.00 to 28.00) of NH - 527A in the State of Bihar.
|
0.57
|
25.1
|
31.12.2022
|
77
|
Strengthening and widening to 2 lane with paved shoulder from km 142.05 to 167 (Goh- Daudnagar) of NH-120
|
25.415
|
89.41
|
12.12.2022
|
78
|
Construction of road side covered drain in km 213 (P) to 215 (P) in Bihra Bazar of NH-327E on EPC Mode
|
0
|
4.24
|
17.09.2022
|
79
|
One time improvement of left out portion of NH-80 from km 119+885 (Dogachhi) to km 132+895 (Zero mile Bhagalpur) on EPC mode in the State of Bihar
|
13.01
|
12.03
|
06.10.2023
|
80
|
Widening to Two Lane with Paved shoulders including strengthening of existing pavement from km 0.00 to km 24.800 of NH-28B (New NH 727) on
EPC mode in the state of Bihar
|
24.8
|
74.83
|
22.09.2023
|
81
|
Widening to two lane with paved shoulders including strengthening of existing pavement from km 14.5 to km
30.00 of NH 101 (New NH 331) on EPC
mode in the state of Bihar
|
15.5
|
61.78
|
07.10.2023
|
82
|
Construction of 2-lane ROB of km 100 of NH-327E
|
1.8
|
62.26
|
31.12.2023
|
83
|
Construction of 4-lane ROB of km 12 of NH-103
|
2.11
|
123.23
|
31.03.2024
|
84
|
Construction of High level New RCC Bridge at km 81.00 of NH-327E on EPC Mode
|
0.48
|
10.93
|
31.05.2024
|
85
|
Construction of 2-lane ROB of km 132 of NH-19
|
2
|
77.38
|
26.08.2019
|
86
|
Balance work of construction of 3x 18m (eff. Span ) High level RCC Bridge across river Mani in Km 94 of NH-80 in the state of Bihar
|
0.41
|
7.73
|
05.03.2022
|
87
|
Construction of additional two lane with paved shoulder of NH-98 (New NH 139) from existing Ch 7.000 to Ch 17.840(Design Ch 0.000 to 10.840)
[AllMS (Bhusaula Golambar ) to Naubatpur (Patna Ring Road ) section] on EPC mode
|
10.84
|
56.8
|
31.05.2024
|
88
|
Strengthening and widening to 2 lane with paved shoulder from km 181.465 to 201.665 of NH-120 Nasriganj - Vikramganj
|
20.2
|
74.90
|
31.03.2024
|
89
|
Construction of High Level R.C.C Major Bridge at Km. 38 (Bandhuganj) on N.H.- 110 in the State of Bihar
|
Bridge
|
18.41
|
31.08.2024
|
90
|
Construction of 2-lane ROB of km 135 of NH-19 (L.C No 62-A/3-E)
|
ROB
|
50.0
|
15.09.2024
|
91
|
Simaria (Km. 206.050) to Khagaria (Km. 266.282)
|
60.23
|
567
|
30.03.2023
|
92
|
Construction of approaches to Rail cum Road bridge across river Ganga near Munger ghat
|
14.52
|
293.16
|
30.09.2022
|
93
|
Bhojpur Buxar section of NH-84 from km.27.37 to km. 75.00
|
47.9
|
681.67
|
16.05.2023
|
94
|
Bakhtiyarpur-Rajauli Pkg-II from km.
|
47.23
|
1065
|
27.04.2023
|
|
54.405 to km.101.630
|
|
|
|
95
|
Construction of 2nd flyover (LCW) in Kishanganj town starting from Km.472.300 to Km. 475.480 of NH-31
|
3.18
|
129.2
|
18.08.2023
|
96
|
Four lanning of Forbesganj to Jogbani section from Km. 0.000 to Km.9.258 (ICP jogbani) of NH-57A
|
9.26
|
247.36
|
31.07.2023
|
97
|
4L of Narenpur - Purnea Section of NH- 131A
|
49
|
1905
|
29.03.2024
|
98
|
4L of Galgalia - Bahadurganj section from Km 0.000 to Km 49.000 (Package-I) of NH327E
|
49
|
1051
|
06.04.2024
|
99
|
4 – lanning of Bahadurganj – Araria (Pkg-II)
|
45
|
1081.7
|
10.08.2024
|
100
|
2L with PS Piprakothi-Motihari-Raxaul NH-28A EPC
|
68.60
|
445.22
|
30.01.2024
|
101
|
4L Ara-Pararia section of NH - 319
|
54.53
|
700
|
31.01.2023
|
102
|
Kanhauli – Ramnagar of Patna Ring Road-pkg-I
|
39.16
|
797
|
31.05.2023
|
103
|
2l with paved shoulder of Chhapra- Gopalganj section of NH-85 from Km.0.000 to Km.93.500
|
94.258
|
644.27
|
09.07.2022
|
104
|
2L with PS Biharsharif – Barbigha – Mokama NH-82 (EPC)
|
54.76
|
297.27
|
28.02.2021
|
105
|
2LPS Chhapra - Rewaghat - Muzaffarpur section of NH - 722
|
73.07
|
427.06
|
17.01.2021
|
106
|
Forbesganj-Simrahi CII-BR-3 (Km. 230.00 - Km. 190.00)
|
34.87
|
357
|
30.06.2016
|
107
|
2L with PS Mokama – Munger NH-80 on BOT (Annuity)
|
60.48
|
351.5
|
13.10.2018
|
108
|
2L with PS Khagaria – Purnea NH-31 on BOT (Annuity)
|
140
|
664
|
30.04.2018
|
ANNEXURE-IV
ANNEXURE-IV REFERRED TO IN REPLY TO PART (e) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024 ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
Details of toll plaza-wise number of toll tenders which have been extended beyond their original period
Name of Toll Plaza
|
No of Extension of Original Contract Period during previous one year (excluding contractual extension) w.e.f Jan 2023
|
Babhaniyawan
|
1st time for 44 days (Original Contract Period 21.07.2023 to 21.10.2023) (Extended upto 05.12.2023)
2nd time for 80 days (Original Contract Period 23.01.2024 to 24.04.2024) (Extended upto 14.07.2024)
|
Kharik
|
1st Time for 14 days
2nd Time for 23 days
|
Maranga
|
1 time for 33 days
|
Kulhariya
|
1 time for 13 days
|
Saidpur
|
1 time for 09 days
|
Karigawan
|
1st time from May/2023 to 13-04-24 and 2nd tme 14-04-24 to till now
(Toll started in May/2023)
|
Runni
|
1 Time - for overstay period from 24.09.2024 (08:00:00) till
05.10.2024 (07:59:59).
|
Maithi
|
1st Time - for EOT approved period in case of FMC due to Covid & Demonitization from 19.07.2024 (00:00:00 Hrs.) till 13.10.2024
(21:24:00 Hrs.).
|
Raje
|
Asanpur
|
Hariabara
|
Saukala
|
M/s Eagle Infra India Ltd. [Original Contract period from 21.03.2022
(08:00 Hrs) to 21.03.2024 (08:00 Hrs)]. Extended for one month from 21.03.2024 (08:00 Hrs.) to 20.04.2024 (08:00 Hrs.)
|
Phulwaria
|
one time for 30 days (Original contract period 26.08.2024 to
26.11.2024)
|
Bishunpurwa
|
one time for 15 days (Original contract period 11.07.2023 to
11.07.2024)
|
Bishunpurwa
|
one time for 90 days (Original contract period 11.04.2022 to
11.04.2023)
|
Thawe
|
one time for 3 days (Original contract period 19.06.2023 to
19.06.2024
|
Sonho
|
one time for 71 days (Original contract period 30.07.2023 to
30.07.2024)
|
Chainwa
|
one time for 119 days (Original contract period 05.04.2022 to
05.04.2023)
|
Pokhraira
|
one time for 120 days (Original contract period 22.07.2023 to
22.07.2024)
|
Balgudar
|
two times, (original contract period from 06.06.2022 to 10.06.2023, extended upto 24.10.2023) & (Original contract period from 16.04.2024 to 15.07.2024, extended up-to 15.10.2024)
|
Bhagalpur
|
one time for 4 days, (Original contract period from 27.08.2022 to
27.08.2023, extended up-to 01.09.2023)
|
This information was given by the The Union Minister of Road Transport & Highways, Shri Nitin Gadkari in a written reply in Lok Sabha today.
***
DS/AK
(Release ID: 2086037)
Visitor Counter : 585
Read this release in:
Urdu