Ministry of New and Renewable Energy

Details of Solar, Wind and Biomass Based Power Generation

Posted On: 21 DEC 2017 4:24PM by PIB Delhi

Minister of State (IC)for Power and New & Renewable Energy, Shri Raj Kumar Singh, in a written reply to a question in Lok Sabha today, informed about the State-wise details of solar and wind power generation during each of the last three years and the current year.

 

(all figures in MU)

 

2014-15

2015-16

2016-17

2017-18

Sl. No.

State/Utility

Wind

Solar

Wind

Solar

Wind

Solar

Wind

Solar

1

Andaman & Nicobar

0

0

 

6.26

0

6.17

0

3.55

2

Andhra Pradesh

1675.82

159.77

2013.04

282.67

3187.85

1599.78

4715.18

1936.54

3

Arunachal Pradesh

0

0

0

0.22

0

0.14

0

0.07

4

Assam

0

9.65

0

31.6

0

2.69

0

3.52

5

Bihar

0

0

0

6.39

0

109.18

0

78.07

6

Chandigarh

0

2.23

0

3.4

0

13.16

0

5.09

7

Chhattisgarh

0

13.54

0

52.7

0

120.91

0

65.68

8

Dadra and Nagar Haveli

0

0.03

0

0.5

0

1.31

0

2.73

9

Daman & Diu

0

0.15

0

4.25

0

14.43

0

10.61

10

Delhi

0

3.18

0

4.11

0

5.68

0

8.42

11

Gujarat

5660.09

1474.56

6446.58

1497.6

7720.01

1738.28

6664.99

1110

12

Haryana

0

10.36

0

114.96

0

19.7

0

38.3

13

HP

0

0

0

0

0

0

0

0

14

J & K

0

0

0

0

0

0.77

0

0

15

Jharkhand

0

8.32

0

19.77

0

38.47

0

11.15

16

Karnataka

4658.1

100.39

4797.95

187.69

6058.65

524.67

5478.39

874.25

17

Kerala

58.4

0

51.45

7.38

72.59

26.52

71.24

28.33

18

Lakshadweep

0

5.13

0

1.02

0

1.59

0

1.06

19

Madhya Pradesh

592.25

562.29

1558.43

1105.28

3563.17

1366.1

3060.41

920.41

20

Maharashtra

6804.8

349.32

6121.34

638.76

7490.75

577.83

5336.74

518.04

21

Manipur

0

0

0

0

0

0.01

0

0.03

22

Meghalaya

0

0

0

0

0

0

0

0

23

Mizoram

0

0

0

0

0

0

0

0

24

Nagaland

0

0

0

0

0

0

0

0

25

Odisha

0

44.94

0

150.73

0

210.81

0

124.37

26

Punducherry

0

0

0

0

0

0.34

0

0.9

27

Punjab

0

129.89

0

380.57

0

909.2

0

919.07

28

Rajasthan

4053.85

1259.19

4583.59

1766.1

5562.52

2131.61

4219.33

1895.92

29

Sikkim

0

0

0

0

0

0

0

0

30

Tamil Nadu

10147.06

158.75

7273.23

507.18

11935.26

1898.34

10080.93

1574.45

31

Telangana

0

138.12

0

402.51

211.93

1337.9

137.89

1677.84

32

Tripura

0

0

0

0

0

0

0

0

33

Uttar Pradesh

0

20.13

0

89.75

0

230.95

0

298.87

34

Uttarakhand

0

11.63

0

5.87

0

37.77

0

147.95

35

West Bengal

0.16

7.07

0

6.28

0

14.96

0

11.15

36

Central Utilities*

117.78

130.37

183.77

174.39

201.61

560.13

174.02

707.21

 

Total

33768.3

4599.02

33029.39

7447.92

46004.34

13499.41

39939.1

12973.6

Note:* NTPC/Oil India Ltd. /DVC/NEEPCO-

Source-Inputs received from Central Electricity Authority

 

The Minister also informed about the revised target for installing solar capacity from 20 GW to 100 GW by 2022 for grid connected solar power projects. The target for wind power projects has been fixed as 60 GW by 2022. Shri Singh stated that in order to achieve these targets, the tendering trajectory for solar and wind power projects has been formulated as under:

Year

Solar projects (GW)

Wind power projects (GW)

2017-18

20

8

2018-19

30

10

2019-20

30

10

 

In an answer to a separate question in Lok Sabha today, Shri Singh informed that the installed capacity of biomass based power generation in the country was 8842 MW, as on 30.11.2017.

Further, the Minister added that to promote the biomass energy sector, the Ministry of New & Renewable Energy has been implementing the following two schemes: -

 

I.  Promotion of Grid Interactive Biomass Power and Bagasse Cogeneration in Sugar Mills

II. Programme on Energy from Urban, Industrial and Agricultural Wastes/Residues

 

                                                                                                                                                                                                               

*****