Ministry of Ports, Shipping and Waterways

Performance of Major Ports

Posted On: 10 AUG 2017 5:22PM by PIB Delhi

There are 12 Major Ports in the country. Port-wise Performance during 2016-17 is given as under:                                                                                                                 

Sl.No

Major Port

Traffic

Handled

(In MT)

Avg. Pre-berthing Time on Port A/c

(In Hrs.)

Avg. Total Turn-round Time

(In Days)

Avg. Output

Per Ship

Berthday

(Tonnes)

 

1

Kolkata Port Trust

 

 

 

 

 

 

- Kolkata Dock System*

16.17

0.79

4.73

4200

 

 

- Haldia Dock Complex*

34.14

21.11

3.45

7491

 

2

Paradip

88.96

13.85

4.99

23727

 

3

Visakhapatnam

61.02

0.41

3.75

13069

 

4

Kamarajar (Ennore)

30.02

0.02

2.70

22924

 

5

Chennai

50.21

0.84

2.51

15888

 

6

V.O. Chidambaranar

38.46

8.88

4.40

10456

 

7

Cochin

25.01

0.00

1.99

17450

 

8

New Mangalore

39.95

3.28

2.35

17094

 

9

Mormugao

33.18

9.57

4.51

13461

10

Mumbai

63.05

2.16

3.27

8413

11

JNPT

62.15

6.96

2.01

23316

12

Kandla

105.44

2.16

4.40

18464

 

Overall:

647.76

5.77

3.43

14576

               

            (*)  Kolkata Dock System and Haldia Dock Complex are parts of Kolkata Port Trust                    

The performance of Major Ports during 2012-13 and 2016-17 has been as under :

Performance Parameters

2012-13

2016-17

Traffic Handled (In Million Tonnes)

545.79

647.76

Avg. Pre-berthing Time on Port A/c

(In Hrs.)

12.17

5.77

Avg. Total Turn-round Time

(In Days)

4.24

3.43

Avg. Output Per Ship Berthday

(Tonnes)

11800

14576

 

This information was given by Minister of State for Shipping and Road Transport and Highways Shri Pon. Radhakrishnan in a written reply to a question in the Lok Sabha today.

*****

NP/MS


(Release ID: 1499199) Visitor Counter : 252