Ministry of Ports, Shipping and Waterways
Performance of Major Ports
Posted On:
10 AUG 2017 5:22PM by PIB Delhi
There are 12 Major Ports in the country. Port-wise Performance during 2016-17 is given as under:
Sl.No
|
Major Port
|
Traffic
Handled
(In MT)
|
Avg. Pre-berthing Time on Port A/c
(In Hrs.)
|
Avg. Total Turn-round Time
(In Days)
|
Avg. Output
Per Ship
Berthday
(Tonnes)
|
|
1
|
Kolkata Port Trust
|
|
|
|
|
|
|
- Kolkata Dock System*
|
16.17
|
0.79
|
4.73
|
4200
|
|
|
- Haldia Dock Complex*
|
34.14
|
21.11
|
3.45
|
7491
|
|
2
|
Paradip
|
88.96
|
13.85
|
4.99
|
23727
|
|
3
|
Visakhapatnam
|
61.02
|
0.41
|
3.75
|
13069
|
|
4
|
Kamarajar (Ennore)
|
30.02
|
0.02
|
2.70
|
22924
|
|
5
|
Chennai
|
50.21
|
0.84
|
2.51
|
15888
|
|
6
|
V.O. Chidambaranar
|
38.46
|
8.88
|
4.40
|
10456
|
|
7
|
Cochin
|
25.01
|
0.00
|
1.99
|
17450
|
|
8
|
New Mangalore
|
39.95
|
3.28
|
2.35
|
17094
|
|
9
|
Mormugao
|
33.18
|
9.57
|
4.51
|
13461
|
10
|
Mumbai
|
63.05
|
2.16
|
3.27
|
8413
|
11
|
JNPT
|
62.15
|
6.96
|
2.01
|
23316
|
12
|
Kandla
|
105.44
|
2.16
|
4.40
|
18464
|
|
Overall:
|
647.76
|
5.77
|
3.43
|
14576
|
|
|
|
|
|
|
|
|
(*) Kolkata Dock System and Haldia Dock Complex are parts of Kolkata Port Trust
The performance of Major Ports during 2012-13 and 2016-17 has been as under :
Performance Parameters
|
2012-13
|
2016-17
|
Traffic Handled (In Million Tonnes)
|
545.79
|
647.76
|
Avg. Pre-berthing Time on Port A/c
(In Hrs.)
|
12.17
|
5.77
|
Avg. Total Turn-round Time
(In Days)
|
4.24
|
3.43
|
Avg. Output Per Ship Berthday
(Tonnes)
|
11800
|
14576
|
This information was given by Minister of State for Shipping and Road Transport and Highways Shri Pon. Radhakrishnan in a written reply to a question in the Lok Sabha today.
*****
NP/MS
(Release ID: 1499199)
Visitor Counter : 252