Power Projects with 11,703 MW electricity generation capacity have been commissioned in the North Eastern Region: Union Power and New & Renewable Energy Minister

Posted On: 12 DEC 2023 6:29PM by PIB Delhi

The Union Minister for Power and New & Renewable Energy has informed that the States in the North Eastern part of our country are endowed with large Hydro potential and that the government has taken the following initiatives in order to attract investments in developing Hydro Power in the region.

 

  • Declaring Large Hydro Power (LHPs) (> 25 MW projects) as renewable energy source.
  • Putting in place a Hydro Purchase Obligation (HPO)
  • Tariff rationalization measures for bringing down hydro power tariff.
  • Budgetary support for flood moderation/storage in Hydro Electric Projects (HEPs).
  • Budgetary support towards cost of enabling infrastructure, i.e. roads/bridges.
  • Full 100 % waiver of Inter State Transmission System (ISTS) charges for new hydro power projects in which construction work is awarded and Power Purchase Agreement (PPA) is signed on or before 30.06.2025.

 

The details of waiver of ISTS charges trajectory where construction work is awarded and PPA is signed after 30.06.2025 are given below.

Details of waiver ISTS charges trajectory where construction work is awarded and PPA is signed after 30.06.2025

Sl. No

Awarded of Construction work + Signing of PPA

Waiver of ISTS charges

1

01.07.2025 to 30.06.2026

75%

2

01.07.2026 to 30.06.2027

50%

3

01.07.2027 to 30.06.2028

25%

Waiver will be applicable for 18 years post-commissioning

 

Projects with aggregate installed capacity of 11,703MW (6,760 MW from conventional sources of energy and 4,943 MW from non-conventional sources of energy) have been commissioned in the North Eastern region. The details are given below.

 

 

Details of commissioned power projects (from conventional sources of energy) located in North Eastern region (as on 31.10.2023)

 

State

Name of Project

Fuel

Capacity (MW)

Arunachal Pradesh

Kameng HPS

Hydro

600

Pare

Hydro

110

Ranganadi HPS

Hydro

405

Assam

Karbi langpi HPS

Hydro

100

Lakwa GT

Gas

97

Lakwa Replacement Power Project

Gas

70

Namrup CCPP

Gas

139

Kathalguri CCPP

Gas

291

Khondong HPS

Hydro

50

Kopili HPS

Hydro

200

Bongaigaon TPP

Coal

750

Manipur

Leimakhong DG

Diesel

36

Loktak HPS

Hydro

105

Meghalaya

Kyrdemkulai HPS

Hydro

60

Myntdu (leshka) ST-1 HPS

Hydro

126

New Umtru HPS

Hydro

40

Umiam HPS ST-I

Hydro

36

Umiam HPS ST-IV

Hydro

60

Mizoram

Tuirial HPS

Hydro

60

Nagaland

Doyang HPS

Hydro

75

Tripura

Agartala GT

Gas

135

Monarchak CCPP

Gas

101

Tripura CCPP

Gas

727

Baramura GT

Gas

42

Rokhia GT

Gas

63

Sikkim

Rangit HPS

Hydro

60

Teesta V HPS

Hydro

510

Teesta-III HPS

Hydro

1,200

Tashiding HPS

Hydro

97

Rongnichu HPS

Hydro

113

Chuzachen HPS

Hydro

110

Jorethang Loop

Hydro

96

Dikchu HPS

Hydro

96

HPS – Hydro Power Station, GT – Gas Turbine, CCPP- Combined Cycle Power Plants, ST – Steam Turbine

 

State-wise installed capacity of non-conventional sources of energy as on 30.11.2023 in

North Eastern Region

(In MW)

 

STATES

Small Hydro Power

Bio Power

Solar Power

Large Hydro Power

Total Capacity

1

Arunachal Pradesh

133

-

12

1,115

1,260

2

Assam

34

2

156

350

542

3

Manipur

5

-

13

105

123

4

Meghalaya

55

14

4

322

395

5

Mizoram

45

-

30

60

136

6

Nagaland

33

-

3

75

111

7

Sikkim

55

-

5

2,282

2,342

8

Tripura

16

-

18

-

34

 

Currently, eight hydroelectric projects with aggregate installed capacity of 6,037 MW are under construction in the North Eastern region of the country. The details are given below.

 

List of Hydro Electric Projects (above 25 MW) under construction in North Eastern Region

 

Sl. No.

Name of Project

Sector

Cap. Under   Execution(MW)

Estimated Year of Completion

Arunachal Pradesh

 

 

 

1

Subansiri Lower

Central

                     2,000

2023-26        (May'25)

2

Dibang Multipurpose Project

Central

                     2,880

2031-32
(Feb'32)

Assam

 

 

 

3

Lower Kopli

State

                        120

2024-25  
(Mar'25)

Sikkim

 

 

 

4

Teesta St. VI

Central

                        500

2026-27     
(Aug'26)

5

Rangit-IV

Central

                        120

2024-25              (Aug'24)

6

Bhasmey

Private

                          51

-

7

Rangit-II

Private

                          66

-

8

Panan

Private

                        300

-

 

Further, Central Electricity Authority (CEA) has accorded concurrence to seventeen hydroelectric schemes (aggregating to 14,589 MW) in North Eastern region. The details are given below.

 

Details of hydroelectric schemes in North Eastern Region accorded concurrence by Central Electric Authority (CEA)

 

S. No

Name of Scheme

State

Installed Capacity (MW)

Estimated Year of Completion

  1.  

Teesta ST-IV

Sikkim

520

2031-32

  1.  

Tawang St-I

Arunachal Pradesh

600

Beyond 2031-32

  1.  

Wah-Umiam Stage-III

Meghalaya

85

2029-30

  1.  

Tawang ST-II

Arunachal Pradesh

800

Beyond 2031-32

  1.  

Heo

Arunachal Pradesh

240

2028-29

  1.  

Tato-I

Arunachal Pradesh

186

2028-29

  1.  

Tato-II

Arunachal Pradesh

700

Beyond 2031-32

  1.  

Demwe Lower

Arunachal Pradesh

1750

2031-32

  1.  

Kalai-II

Arunachal Pradesh

1200

Beyond 2031-32

  1.  

Talong Londa

Arunachal Pradesh

225

2031-32

  1.  

Etalin

Arunachal Pradesh

3,097

2030-31

  1.  

Nafra

Arunachal Pradesh

120

2027-28

  1.  

Hirong

Arunachal Pradesh

500

Beyond 2031-32

  1.  

Naying

 

Arunachal Pradesh

1,000

Beyond 2031-32

  1.  

Attunli

Arunachal Pradesh

680

2030-31

  1.  

Lower Siang

Arunachal Pradesh

2,700

Beyond 2031-32

  1.  

Dikhu

Nagaland

186

2030-31

 

This information has been given by the Union Minister for Power and New & Renewable Energy Shri R. K. Singh, in a written reply to a question, in Rajya Sabha today, December 12, 2023.

***

PIB DELHI | Alok Mishra / Dheep Joy Mampilly



(Release ID: 1985545)


Read this release in: Hindi